Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutBLD06-078�opuRrrp�ym CITY OF PORT TOWNAND
U
,- DEVELOPMENT SERVICES DEPARTMENT
°pA^� INSPECTION REPORT
PERMIT NUMBER: %
Site Address
Contractor
Owner
Date of Inspection
I
4 A .
Worksite or Cell Phone#
❑ Erosion /Sediment Control ❑ Plumbing/Top Out ❑ Propane/Wood Appliance
Setbacks /Footings/UFER ❑ Propane Pipe /Pressure Test ❑ Manufactured Home Set -up
❑ Foundation Walls ❑ Propane Tank/Line ❑ Fire Department
❑ Footing Drainage
❑ Slab /Interior Footing /Insulation
❑ Groundwork/Plumbing Test
❑ Underfloor Framing
❑ Ext. Shear Wall /Holdowns
• Mechanical
• Framing
❑ Insulation
❑ Interior Shear /BWP Nail
❑ Drywall /Fire Wall
❑ Temporary Occupancy
❑ Fees Paid
❑ Final Occupancy
❑ Other /Consultation
For inspections, call the Inspection Line at 360- 385 -2294 by 3:00 PM the day before you want the inspection;
for Monday inspections call by 3:00 PM Friday. Additional fees may be assessed for multiple re- inspections
if the work is not ready and the inspector must return to the site. Failure to provide inspection record and
approved plans on the site will result in $47 re- inspection fee charge. (OCCUPANCY REQUIRES PRIOR
- 1NRtEfN APPROVAL BY DSD.)
❑ PROVED",-,,, ❑ APPROVED WITH CORRECTIONS ❑ NOT APPROVED
SEE BELOW SEE COMMENT(S) BELOW
r-A
DI
Approved 'M ans and perm car must be on -site and inspection.
available at time of
Inspector Date
Acknowledged by Date
r �..
l__J
CITY OF PORT TOWNSEND
Development Services Department
250 Madison Street, Suite 3
Port Townsend, WA 98368
Phone: (360) 379 -3208 Fax: (360) 344 -4619
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
For Next Day Inspection Call 385-2294 Before 3P.M.
Permit Number: BLD06 -078 Issued: 05/11/2006 Parcel Number: 989 - 700 -803
Job Address: 817 Water St. Zoning: C -Ill Type: V -B Occupancy: A -2
Nature of Work: Repair concrete pier and erade beam damaized during storm
Owners: Jon Johnson Contractor: Little & Little Const. — LITTLLC157C5
GENERAL CONDITIONS APPLY — SEE LAST PAGE
SEPARATE PERMITS RE UIRED:
Electrical — Contact Labor & Industries @ 360- 417 -2702
* ** All elements of engineering including holdowns, framing, nailing and other engineering connections
require inspection prior to cover. * **
PECTIONS
CONCRETE
Grade Beam to encase bottom portion of pier
12" diameter concrete pier
4 - No. 4 vertical rebar
1 — No. 5 vertical rebar
FINAL
Address Numbers -- 5" minimum
Final — Building
APPROVED /DATE
Call 48 hours before you dig for utility line locates
1 -800- 424 -5555
Page 1 of 2
Permit #BLD06 -078
GENERAL CONRLTLM
1. Contractors working on this project are required to 'have a Labor & Industries contractor's
registration number and a City business license. Failure to provide proof of this documentation prior
to work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on -site and inspected
prior to beginning construction; call 385 -2294. Measures shall include installation of silt fencing and
graveled construction entrance (see attached details). Adjacent rights -of -way shall be kept free of dirt
debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic
sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once
construction is complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by
required inspections.
5. Re- inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 385 -2294. A
minimum of twenty-four hours notice is re uired. Public Works approval must be received prior to
scheduling the Building De artment's final ins ection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for a non-
residential project.
8. All building permits expire if no progress has been made within six months, or if no inspections are
done by the Building Department within one year. Call for at least one inspection per year to keep
your building permit active.
9. Revisions require submittal and approval Urior to making changes in the field. Contact the Building
Department (379 -3208) prior to making changes to the approved plans.
10. POST THIS PERMIT ON -SITE WITH THE APPROVED PLANS.
ZA�4_6_ L&= e's I 1(0 (e; 6
APPLI ANT SIGNATURE DATE
Call 48 hours before you dig for utility line locates
1 -800- 424 -5555
Page 2 of 2