Loading...
HomeMy WebLinkAboutBLD06-057o�90STrp�M s� u` a aW ERMIT NUMBER: Site Address Contractor *CITY OF PORT TOWNSEN40 D DEVELOPMENT SERVICES DEPARTMENT INSPECTION REPORT I�Ln0(o -05-7 Owner Lam j Date of Inspection - 5 / 18/ Q Worksite or Cell Phone# 3d 25 - I ❑ Erosion /Sediment Control ❑ Plumbing/Top Out ❑ Setbacks /Footings /UFER ❑ Propane Pipe /Pressure Test ❑ Foundation Walls ❑ Propane Tank/Line ❑ Footing Drainage ❑ Mechanical L) Slab /Interior Footing /Insulation ramin �' ❑ Groundwork/Plumbing Test Insulation ❑ Underfloor Framing ❑ Interior Shear /BWP Nail ❑ Ext. Shear Wall /Holdowns ❑ Drywall /Fire Wall ❑ Propane/Wood Appliance ❑ Manufactured Home Set -up ❑ Fire Department ❑ Temporary Occupancy ❑ Fees Paid ❑ Final Occupancy ❑ Other /Consultation For inspections, call the Inspection Line at 360 -385 -2294 by 3:00 PM the day before you want the inspection; for Monday inspections call by 3:00 PM Friday. Additional fees may be assessed for multiple re- inspections if the work is not ready and the inspector must return to the site. Failure to provide inspection record and approved plans on the site will result in $47 re- inspection fee charge. (OCCUPANCY REQUIRES PRIOR W f� VAL BY DSD.) ❑ APPROVED '1 ❑ APPROVED WITH CORRECTIONS ❑ NOT APPROVED SEE BELOW V Ilr (rt. SEE COMMENT(S) BELOW Approved Inns and permit card must be on -site and available at time of inspection. Inspector ic_ �`�G "1 Date fc' Acknowledged by Date QpR7Tp� 0 ys CITY OF PORT TOWNSEND z DEVELOPMENT SERVICES DEPARTMENT ' oaWA ,. INSPECTION REPORT , • 6 Site Address Contractor Owner Date of Inspection Ca7L&I Worksite or Cell Phone# (5C) 1 2 5 I ❑ Erosion /Sediment Control ❑ Setback ootings ER ❑ Foundation Walls e ❑ Slab /Interior Footing /Insulation ❑ Groundwork/Plumbing Test ❑ Underfloor Framing ❑ Ext. Shear Wall /Holdowns ❑ Plumbing/Top Out ❑ Propane Pipe /Pressure Test ❑ Propane Tank/Line ❑ Mechanical ❑ Framing ❑ Insulation ❑ Interior Shear /BWP Nail ❑ Drywall /Fire Wall r� ❑ Propane/Wood Appliance ❑ Manufactured Home Set -up ❑ Fire Department ❑ Temporary Occupancy ❑ Fees Paid ❑ Final Occupancy ❑ Other /Consultation For inspections, call the Inspection Line at 360- 385 -2294 by 3:00 PM the day before you want the inspection; for Monday inspections call by 3:00 PM Friday. Additional fees may be assessed for multiple re- inspections if the work is not ready and the inspector must return to the site. Failure to provide inspection record and approved plans on the site will result in $47 re- inspection fee charge. (OCCUPANCY REQUIRES PRIOR WRITTEN APPROVAL BY DSD.) APPROVED ❑ APPROVED WITH CORRECTIONS ❑ NOT APPROVED SEE BELOW ,� P W 5 f� -I &_ &(� SEE COMMENT(S) BELOW Approved pl#os and p r "it card must on- 'te and available at time of inspection. Inspector Date Acknowledge by Date 0 • CITY OF PORT TOWNSEND Development Services Department 250 Madison Street, Suite 3 Port Townsend, WA 98368 Phone: (360) 379 -3208 Fax: (360) 344 -4619 CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE For Next Day Inspection Call 385 -2294 Before 3 P.M. Permit Number: BLD06 -057 Issued: 04/11/06 Parcel Number: 933 200 001 Job Address: 857 Tyler Street Zoning: R -II Type: V -B Nature of Work: Build new foundation Owner: Tim & Teresa Lawson Contractor: Tonj Goldenberg GOLDEC *075NC expiration date 8/8/2006 GENERAL CONDITIONS APPLY -- SEE NEXT PAGE D1Pn'FTTQ1P' 1 TNCPF.iI~"'T'FnNC TEMP EROSION & SEDIMENT CONTROL See General Condition No. 2 Silt Fence as needed Drive Off Mat to restrict sediment from leaving the site FOOTING FRAMING FINAL Address 5" numbers 1 0110V i7 Development Services Department 250 Madison Street, Suite 3 Port Townsend, WA 98368 Phone: (360) 379 -3208 Fax: (360) 344 -4619 GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESL) measures shall be installed on -site and inspected prior to beginning construction; call 385 -2294. Measures shall include installation of silt fencing and graveled construction entrance. Adjacent rights-of-way shall be kept free of dirt & debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re- inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385 -2294. A minimum of twenty -four hours notice is required. Public Works approval must be received Erior to scheduling the Building Department's final inspection. 7. Final Inspections are required prior to occupancy. A Certificate of Occupancy is required for a non- residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval prior to making changes in the field. Contact the Building Department at 379 -3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ON -SITE WITH THE APPROVED PLANS. 111lZilsln]