HomeMy WebLinkAboutBLD06-057o�90STrp�M
s�
u` a
aW
ERMIT NUMBER:
Site Address
Contractor
*CITY OF PORT TOWNSEN40 D
DEVELOPMENT SERVICES DEPARTMENT
INSPECTION REPORT
I�Ln0(o -05-7
Owner Lam j
Date of Inspection - 5 / 18/ Q
Worksite or Cell Phone# 3d 25 - I
❑ Erosion /Sediment Control ❑ Plumbing/Top Out
❑ Setbacks /Footings /UFER ❑ Propane Pipe /Pressure Test
❑ Foundation Walls ❑ Propane Tank/Line
❑ Footing Drainage ❑ Mechanical
L) Slab /Interior Footing /Insulation ramin �'
❑ Groundwork/Plumbing Test Insulation
❑ Underfloor Framing ❑ Interior Shear /BWP Nail
❑ Ext. Shear Wall /Holdowns ❑ Drywall /Fire Wall
❑ Propane/Wood Appliance
❑ Manufactured Home Set -up
❑ Fire Department
❑ Temporary Occupancy
❑ Fees Paid
❑ Final Occupancy
❑ Other /Consultation
For inspections, call the Inspection Line at 360 -385 -2294 by 3:00 PM the day before you want the inspection;
for Monday inspections call by 3:00 PM Friday. Additional fees may be assessed for multiple re- inspections
if the work is not ready and the inspector must return to the site. Failure to provide inspection record and
approved plans on the site will result in $47 re- inspection fee charge. (OCCUPANCY REQUIRES PRIOR
W f� VAL BY DSD.)
❑ APPROVED '1 ❑ APPROVED WITH CORRECTIONS ❑ NOT APPROVED
SEE BELOW
V
Ilr (rt.
SEE COMMENT(S) BELOW
Approved Inns and permit card must be on -site and available at time of inspection.
Inspector ic_ �`�G "1 Date fc'
Acknowledged by Date
QpR7Tp� 0
ys CITY OF PORT TOWNSEND
z
DEVELOPMENT SERVICES DEPARTMENT
' oaWA ,. INSPECTION REPORT
, • 6
Site Address
Contractor
Owner
Date of Inspection
Ca7L&I
Worksite or Cell Phone# (5C) 1 2 5 I
❑ Erosion /Sediment Control
❑ Setback ootings ER
❑ Foundation Walls
e
❑ Slab /Interior Footing /Insulation
❑ Groundwork/Plumbing Test
❑ Underfloor Framing
❑ Ext. Shear Wall /Holdowns
❑ Plumbing/Top Out
❑ Propane Pipe /Pressure Test
❑ Propane Tank/Line
❑ Mechanical
❑ Framing
❑ Insulation
❑ Interior Shear /BWP Nail
❑ Drywall /Fire Wall
r�
❑ Propane/Wood Appliance
❑ Manufactured Home Set -up
❑ Fire Department
❑ Temporary Occupancy
❑ Fees Paid
❑ Final Occupancy
❑ Other /Consultation
For inspections, call the Inspection Line at 360- 385 -2294 by 3:00 PM the day before you want the inspection;
for Monday inspections call by 3:00 PM Friday. Additional fees may be assessed for multiple re- inspections
if the work is not ready and the inspector must return to the site. Failure to provide inspection record and
approved plans on the site will result in $47 re- inspection fee charge. (OCCUPANCY REQUIRES PRIOR
WRITTEN APPROVAL BY DSD.)
APPROVED
❑ APPROVED WITH CORRECTIONS ❑ NOT APPROVED
SEE BELOW
,� P W 5 f� -I &_ &(�
SEE COMMENT(S) BELOW
Approved pl#os and p r "it card must on- 'te and available at time of inspection.
Inspector Date
Acknowledge by Date
0 •
CITY OF PORT TOWNSEND
Development Services Department
250 Madison Street, Suite 3
Port Townsend, WA 98368
Phone: (360) 379 -3208 Fax: (360) 344 -4619
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
For Next Day Inspection Call 385 -2294 Before 3 P.M.
Permit Number: BLD06 -057 Issued: 04/11/06 Parcel Number: 933 200 001
Job Address: 857 Tyler Street Zoning: R -II Type: V -B
Nature of Work: Build new foundation
Owner: Tim & Teresa Lawson Contractor: Tonj Goldenberg GOLDEC *075NC expiration date 8/8/2006
GENERAL CONDITIONS APPLY -- SEE NEXT PAGE
D1Pn'FTTQ1P' 1 TNCPF.iI~"'T'FnNC
TEMP EROSION & SEDIMENT CONTROL
See General Condition No. 2
Silt Fence as needed
Drive Off Mat to restrict sediment from leaving the site
FOOTING
FRAMING
FINAL
Address 5" numbers
1 0110V i7
Development Services Department
250 Madison Street, Suite 3
Port Townsend, WA 98368
Phone: (360) 379 -3208 Fax: (360) 344 -4619
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's
registration number and a City business license. Failure to provide proof of this documentation
prior to work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESL) measures shall be installed on -site and
inspected prior to beginning construction; call 385 -2294. Measures shall include installation of
silt fencing and graveled construction entrance. Adjacent rights-of-way shall be kept free of dirt
& debris. Soils exposed during construction shall be temporarily stabilized with mulching,
plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc.
once construction is complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall
panels (ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by
required inspections.
5. Re- inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 385 -2294. A
minimum of twenty -four hours notice is required. Public Works approval must be received
Erior to scheduling the Building Department's final inspection.
7. Final Inspections are required prior to occupancy. A Certificate of Occupancy is required for a
non- residential project.
8. All building permits expire if no progress has been made within six months, or if no inspections
are done by the Building Department within one year. Call for at least one inspection per year
to keep your building permit active.
9. Revisions require review and approval prior to making changes in the field. Contact the
Building Department at 379 -3208 prior to making changes to the approved plans.
10. POST THIS PERMIT ON -SITE WITH THE APPROVED PLANS.
111lZilsln]