No preview available
HomeMy WebLinkAboutBLD06-0560 0 AA. a�y�, CITY OF PORT TOWNSEND DEVELOPMENT SERVICES DEPARTMENT INSPECTION REPORT PERMIT NUMBER: Lo L (D �/ SITE ADDRESS: CONTRACTOR: C` DATE OF INSPECTION: WORKSITE OR CELL PHONE #: TYPE OF INSPECTION REQUESTED: t� r) '-a J �LD6'e-� For inspections, call the Inspection Line at 360 -385 -2294 by 3:00 PM the day before you want the inspection. For Monday inspections, call by 3:00 PM Friday. 0 APPROVED 0 r APPROVED WITH CORRECTIONS NOTED BELOW o L ❑ NOT APPROVED CALL FOR RE- INSPECTION BEFORE PROCEEDING Approved plans and permit card must be on -site and available at time of inspection. A re- inspection fee may rzyssessed if work is not ready for inspection. Inspector' ! Date Z Acknowledged ; C c ! ''� Date z ' /l e • °fQ�r' °'ros CITY OF PORT TOWNSEN ° DEVELOPMENT SERVICES DEPARTMENT 'pWA INSPECTION REPORT ERMIT NUMBER: �- 0 Site Address — Contractor Owner Date of Inspection IN Worksite or Cell Phone# lt:� :� I ' 'q ^n l ❑ Erosion /Sediment Control ❑ Plumbing/Top Out 0 Propane/Wood Appliance )Setbacks /Fo� ot� i gs /UFER ❑ Propane Pipe /Pressure Test ❑ Manufactured Home Set -up L3roundafion Walls ❑ Propane Tank/Line ❑Fire Department ❑ Footing Drainage ❑ Slab /Interior Footing /Insulation ❑ Groundwork/Plumbing Test ❑ Underfloor Framing ❑ Ext. Shear Wall /Holdowns ❑ Mechanical ❑ Framing ❑ Insulation ❑ Interior Shear /BWP Nail ❑ Drywall /Fire Wall ❑ Temporary Occupancy ❑ Fees Paid ❑ Final Occupancy ❑ Other /Consultation For inspections, call the Inspection Line at 360- 385 -2294 by 3:00 PM the day before you want the inspection; for Monday inspections call by 3:00 PM Friday. Additional fees may be assessed for multiple re- inspections if the work is not ready and the inspector must return to the site. Failure to provide inspection record and approved plans on the site will result in $47 re- inspection fee charge. (OCCUPANCY REQUIRES PRIOR OVAL BY DSD.) ❑ APPROVED ❑ APPROVED WITH CORRECTIONS ❑ NOT APPROVED - -- _ ---�'° SEE BELOW SEE COMMENT(S) BELOW �)_ rC ;r I Approved ns and permit card must be on -site and available at time of inspection. Inspector f� ( =._.. - Dater ,. Acknowledge b �C .., �: - ---- -- 9 Y Date ��a - — p�,,011T yy 9 s CITY OF PORT TOWNS E N DEVELOPMENT SERVICES DEPARTMENT wA INSPECTION REPORT PERMIT NUMBER: _ Ln n Site Address Contractor V no Owner Date of Inspection Worksite or Cell Phone# ❑ Erosion /Sediment Control ❑ Setbacks /Footings /UFER ❑ Foundation Walls ❑ Plumbing/Top Out ❑ Propane Pipe /Pressure Test ❑ Propane Tank/Line ❑ Footing Drainage ❑ Mechanical ❑ Slab /Interior Footing /Insulation raming ❑ Groundwork/Plumbing Test ❑ Insulation ❑ Underfloor Framing ❑ Interior Shear /BWP Nail ❑ Ext. Shear Wall /Holdowns ❑ Drywall /Fire Wall ❑ Propane/Wood Appliance ❑ Manufactured Home Set -up ❑ Fire Department ❑ Temporary Occupancy ❑ Fees Paid ❑ Final Occupancy ❑ Other /Consultation For inspections, call the Inspection Line at 360- 385 -2294 by 3:00 PM the day before you want the inspection; for Monday inspections call by 3:00 PM Friday. Additional fees may be assessed for multiple re- inspections if the work is not ready and the inspector must return to the site. Failure to provide inspection record and approved plans on the site will result in $47 re- inspection fee charge. (OCCUPANCY REQUIRES PRIOR WIJIT-fER-APPROVAL BY DSD.) ❑ APPROVED ❑ APPROVED WITH CORRECTIONS ❑ NOT APPROVED e.- SEE BELOW SEE COMMENT(S) BELOW a Approve tans and permit card must be on -site and available at time of inspection, Inspector - L k Dated Cif, Acknowledged by Date Development Services Department 250 Madison Street, Suite 3 Port Townsend, WA 98368 Phone: (360) 379 -3208 Fax: (360) 344 -4619 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE For Next Dav Inspection Call 385 -2294 Before 3P.M. Permit Number: BLD06 -056 Issued: 04/13/2006 Parcel Number: 958- 900 -003 Job Address: 4925 Mason St. Zoning: R -I Nature of Work: Construct 200' of 8' fence Owners: Don Waterkotte Type: V -B Occupancy: U Contractor: Jim Poore — POOREJ *982L5 GENERAL CONDITIONS APPLY -- SEE LAST PAGE SEPARATE PERMITS REQUIRED: Electrical — Contact Labor & Industries @ 360- 417 -2702 NOTE: ACQUAINT YOURSELF WITH THE LISTED REQUIRMENTS TO RECEIVE FINAL BUILIDNG INSPECTION PRIOR TO THE START OF CONSTRUCTION AND PRIOR TO YOUR REQUEST FOR FINAL INSPECTION. * ** All elements of engineering including holdowns, framing, nailing and other engineering connections require inspection prior to cover. * ** DTl11"TTDvn 1FyQ'P rrrm1VC APPROWDIDATE TEMP EROSION & SEDIMENT CONTROL See General Condition No. 2 Silt Fence as needed Drive Off Mat to restrict sediment from leaving the site FOOTINGS Holes 3' deep x 10" wide FRAMING FINAL House Numbers — 5" minimum Final — Building Call 48 hours before you dig for utility line locates 1- 800 - 424 -5555 Page 1 of 2 R 0 0 Permit #BLD06 -056 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESL) measures shall be installed on -site and inspected prior to beginning construction; call 385 -2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights -of -way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re- inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385 -2294. A minimum of twenty -four hours notice is required. Public Works _approval must be received 1prior to scheduling the Buildina Department's final inspection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for a non- residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal and approval prior to making changes in the field. Contact the Building Department (379 -3208) prior to making changes to the approved plans. 10. POST THIS PERMIT ON -SITE WITH THE APPROVED PLANS. APPLICANT SIG TUBE DATE Call 48 hours before you dig for utility line locates 1 -800- 424 -5555 Page 2 of 2