HomeMy WebLinkAboutBLD06-039'�� °�'� ° CITY OF PORT TOWNSRD
Fn DEVELOPMENT SERVICES DEPARTMENT
INSPECTION REPORT
PERMIT NUMBER:
Site Address
Contractor
Owner
Date of Inspection
Worksite or Cell Phone#
❑ Erosion /Sediment Control
❑ Setbacks /Footings /UFER
❑ Foundation Walls
❑ Footing Drainage
❑ Slab /Interior Footing /Insulation
❑ Groundwork/Plumbing Test
❑ Underfloor Framing
❑ Ext. Shear Wall /Holdowns
❑ Plumbing/Top Out
❑ Propane Pipe /Pressure Test
• Propane Tank/Line
• Mechanical
• Framing
• Insulation
❑ Interior Shear /BWP Nail
❑ Drywall /Fire Wall
❑ Propane/Wood Appliance
• Manufactured Home Set -up
• Fire Department
❑ Temporary Occupancy
❑ Fees Paid
❑ Final Occupancy
❑ Other /Consultation
For inspections, call the Inspection Line at 360 -385 -2294 by 3:00 PM the day before you want the inspection;
for Monday inspections call by 3:00 PM Friday. Additional fees may be assessed for multiple re- inspections
if the work is not ready and the inspector must return to the site. Failure to provide inspection record and
approved plans on the site will result in $47 re- inspection fee charge. (OCCUPANCY REQUIRES PRIOR
WRITTEN APPROVAL BY DSD.)
❑ APPROVED ❑ APPROVED WITH CORRECTIONS ❑ NOT APPROVED
SEE BELOW SEE COMMENT(S) BELOW
Approved
Inspector �
Acknowledged by
and permit card must be on -site and available at time of inspection.
r
L ,- Date
Date
• City of Port Townsend
Development Services Department
250 Madison Street, Snhe 3
Port Townsend, WA 98368
Phone (360) 379 -5095 Fax (360) 344 -4619
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385 -2294 by 3:00 PM for Next Day Inspection
Permit Number: BLD06 -039 Issued: 03/07/06 Parcel Number: 989 704 301
Job Address: Water & Madison Zoning: C=II1 Type: VV =N Occupancy: B
Nature of Work: "Does -A -Foot' Hot Doe Stand - Lean -To / Temporary Structure
Owner: John Sheehan
385 -1708
Contractor: Same as Owner
GENERAL CONDITIONS APPLY - SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Electrical - Contact Labor & Industries @ 360 - 417 -2702
REQUIRED INSPECTIONS
APPROVED/DATE
FRAMING
FINAL
Final —Fire Department
Final— Health Department
Final— Building Department
Call 48 hours before you dig for utility line locates
1- 800 - 424 -5555
Page 1 of 1
• • Permit 4BLD06 -039
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's
reeistration number and a City business license. Failure to provide proof of this documentation prior to
work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on -site and inspected
prior to beginning construction; call 385 -2294. Measures shall include installation of silt fencing and
graveled construction entrance (see attached details). Adjacent rights -of -way shall be kept free of dirt
debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic
sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once
construction is complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by
required inspections.
5. Re- inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 385 -2294. A
minimum of twenty -four hours notice is required. Public Works approval must be received prior to
scheduling the Building Department's final inspection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for a non-
residential project.
8. All building permits expire if no progress has been made within six months, or if no inspections are
done by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal and approval prior to making changes in the field. Contact the Building
Department (379 -3208) prior to making changes to the approved plans.
10. POST THIS PERMIT ON -SITE WITH THE APPROVED PLANS.
Call 48 hours before you dig for utility line locates
1- 800 - 424 -5555
Page 2 of 2