oFPOa, raw CITY OF PORT TOWNSEND
v DEVELOPMENT SERVICES DEPARTMENT
INSPECTION REPORT
wa
For inspections, call the Inspection Line at 360 - 385 -2294 by 3:00 PM the day before you want
the inspection. For Monday inspections, call by 3:00 PM Friday.
DATE OF INSPECTION: / s PERMIT NUMBER:
SITE ADDRESS: -
PROJECT NAME: CONTRACTOR:
CONTACT PERSON: PHONE:
TYPE OF INSPECTION 7 t`rl� �� �_ t x 'fit ��M, �� s i `
.. . ...........
❑ APPROVED I_ APPROVED WITH ❑ NOTAPPROVED
CORRECTIONS
_ Ok to proceed. Corrections will be Call for re- inspection before
checked at next inspection proceeding.
I
Inspector Date 1 �;
Approved plans and permit card must be on -site and available at time of inspection. A re- inspection fee may,
be assessed if work is not ready for inspection.
\t ti ` ~u °`' °ArT °"ryo• CITY OF PORT TOWAND
DEVELOPMENT SERVICES DEPARTMENT
'TWA °�2 INSPECTION REPORT
1 z
n ERMIT NUMBER:
% Site Address ca
/ Contractor �� L�Q
J
Owner
Date of Inspection
Worksite or Cell Phone#
❑ Erosion /Sediment Control ❑ Plumbing/Top Out
❑ Propane/Wood Appliance
❑ Setbacks /Footings /UFER ❑ Propane Pipe /Pressure Test
❑ Manufactured Home Set -up
• Foundation Walls ❑ Propane Tank/Line
❑ Fire Department
• Footing Drainage ❑ Mechanical
❑ Temporary Occupancy
XSlabllnterio Footin Insulation ❑ Framing
❑ Fees Paid
❑ Groundwork/P umbing Test ❑ Insulation
❑ Final,Occupancy
❑ Underfloor Framing ❑ Interior Shear /BWP Nail
❑ Other /Consultation
❑ Ext. Shear Wall /Holdowns ❑ Drywall /Fire Wall
For inspections, call the Inspection Line at 360 - 385 -2294 by 3:00 PM the day before you want the inspection;
for Monday inspections call by 3:00 PM Friday. Additional fees may be assessed for multiple re- inspections
if the work is not ready and the inspector must return to the site. Failure to provide inspection record and
approved plans on the site will result in $47 re- inspection fee charge.
(OCCUPANCY REQUIRES PRIOR
WRITTEN APPROVAL BY DSD.)
❑ APPROVED ❑ APPROVED WITH CORRECTIONS ❑ NOT APPROVED
SEE BELOW SEE COMMENT(S) BELOW
' S
Approved plans and permit card must be on -site and available at time of inspection.
Inspector� i, i , i �_ Date
Acknowledged by .; - Date
i 0
CITY OF PORT TOWNSEND
0
Development Services Department
250 Madison Street Suite 3
Part Townsend, WA 98368
Phone: (360) 379 -5095 Fax: (360) 3444619
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
For Next Day Inspection Call 385-2294 Before 3P.M.
Permit Number: BLD06- 038R -1 Issued: 05/04/2006 Parcel Number: 001 104 107
Job Address: Larry Scott Trail Zoning: M -II -A Occupancy: NA
Nature of Work: Revision #1: Revised engineering for bolting of benches, signs and sculpture
Owners: Citv of Port Townsend Public Works Department
GENERAL CONDITIONS APPLY — SEE LAST PAGE
SEPARATE PERMITS REQUIRED;
Electrical — Contact Labor & Industries @ 360- 417 -2702
R FIII iIR F.TI INCPFCTInNC
Contractor: Owner
APPROVED/DATE
CEMENT BASE
Epoxy Bolts —1 %"
12" minimum embedment into concrete with minimum 5"
embedment below the reinforcing steel — Holes shall be air
cleaned, then brushed, then blown out with air a second time.
Call for inspection of embedment depth and cleanliness of holes
prior to bolt installation
Spacers
Nuts
BENCHES (2) — Inspection required per engineering
6'x31 "x8 "pad
Positive Connections —per revised engineering; epoxy bolts shall
be embedded minimum 5" into concrete. Holes shall be air
cleaned, then brushed, then blown out with air a second time.
Call for inspection of embedment depth and cleanliness of holes
prior to bolt installation
SIGN — Inspection required per engineer
'/4 " Epoxy Bolts
Call 48 hours before you dig for utility line locates
1- 800 - 424 -5555
Page 1 of 2
• • Permit #BLD06- 038R -1
' 1 ►1 1�
1. Contractors working on this project are required to have a Labor & Industries contractor's
reeistration number and a City business license. Failure to provide proof of this documentation prior
to work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESL) measures shall be installed on -site and inspected
prior to beginning construction; call 385 -2294. Measures shall include installation of silt fencing and
graveled construction entrance (see attached details). Adjacent rights -of -way shall be kept free of dirt
debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic
sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once
construction is complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by
required inspections.
5. Re- inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 385 -2294. A
minimum of twenty -four hours notice is required. Public Works approval must be received prior to
scheduling the Building Department's final inspection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for a non-
residential project.
8. All building permits expire if no progress has been made within six months, or if no inspections are
done by the Building Department within one year. Call for at least one inspection per year to keep
your building permit active.
9. Revisions require submittal and approval prior to making changes in the field. Contact the Building
Department (379 -5095) prior to making changes to the approved plans.
10. POST THIS PERMIT ON -SITE WITH THE APPROVED PLANS.
APPLICANT SIGNATURE DATE
Call 48 hours before you dig for utility line locates
1- 800 - 424 -5555
Page 2 of 2
0 0 0
City of Port Townsend
Development Services Deparunent
250 Madison Street, Suite 3
Port Townsend, WA 98368
Phone (360) 379 -5095 Fax (360) 3444619
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385 -2294 by 3 :00 PM for Next Day Inspection
Permit Number: BLD06 -038 Issued: 03108/06 Parcel Number: 001- 104 -107
Job Address: Near Larry Scott Trail Zoning: M -11(A) Type: N/A Occupancy: N/A
Nature of Work: Foundation for sculpture, installation of two benches and commemorative plaque
Property Owner: City of Port Townsend Applicant: Jefferson Land Trust
Contractor: Beaver Valley Cement Finishing — BEAVEVC148RW
GENERAL CONDITIONS APPLY — SEE LAST PAGE
R V 0111R F,TI INSPECTIONS
APPROVFDIDATF,
CEMENT BASE
36" deep
95 grade 60 steel @ 12" o.c. each way
Bolts— 1 -1/2"
28" embedment — call for inspection to verify
depth of embedment
Spacers
Nuts
BENCHES (2) — Inspection required per
engineering
6'x31 "x8 "pad
Positive Connections — per plans
SIGN — Inspection required per engineering
49" x 24" x 8" pad
#4 steel
%4" bolts
Call 48 hours before you dig for utility line locates
1- 800 - 424 -5555