Loading...
HomeMy WebLinkAboutBLD06-029o4P °� r °ky CITY OF PORT TOWNSEND DEVELOPMENT SERVICES DEPARTMENT INSPECTION REPORT CONTRACTOR: DATE OF INSPECTION: WORKSITE OR CELL PHONE #:_ (` �� GZ 4 TYPE OF INSPECTION REQUESTED: �P- �-- For inspections, call the Inspection Line at 360 - 385 -2294 by 3:00 PM the day before you want the inspection. For Monday inspections, call by 3:00 PM Friday. ❑ APPROVED "❑ APPROVED WITH CORRECTIONS ❑ NOT APPROVED __. NOTED BELOW CALL FOR RE- INSPECTION BEFORE PROCEEDING Approved plans and permit card must be on -site and available at time of inspection. A re- inspection fee may b a sessed if work is not ready for inspection. Inspector 1 Date? r r Acknowledged ( emu. �' Date City of Port Townsend 181 Quincy Street Suite 301 Port Townsend, WA 98368 Phone (360) 344 -3057 Fax (360) 385 -7675 CITY OF PORT TOWNSEND BUILDER'S PEFMT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385 -2294 before 3:00 p.m. for next day Inspection Permit Number: BLD06 -029 Issued: 05/02/2006 Parcel Number: 001 - 092 -004 Job Address: 291120th St. Zoning: P /OS(B) Occupancy: NA Nature of Work: Install 4' diameter Sprint/Nextel microwave antenna at 90' level on existing tower. Owner; City of Port Townsend /Sprint/Nextel Contractor: TBD — see Condition #1 GENERAL CONDITIONS APPLY - SEE LAST PAGE SEPARATE PERMITS REQUIRED: ELECTRICAL (WA State Labor and Industries) REQUIRED INSPECTIONS APPROVED/DATE FINAL INSPECTION 3 - I 1/4" coax runs Chain Mount w/ 4 1/2" dia. Mounting pipe 4' diameter microwave antenna Call 48 hours before you dig for utility locates 1- 800 - 424 -5555 Page 1 of 2 Building Permit #BLD06 -029 GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. A separate electrical permit is required for any electrical work. 3. Re- inspections are required after any corrections are complete. 4. Final Inspections and approvals are required. 5. All Building Permits expire if no progress has been made within six months or, if no inspections have been made by the Building Department within one year. Call for at least one inspection per year to keep your permit active. 6. Revisions require review and approval rp for to making changes in the field. Contact the Building Department at 379 -3208 prior to making changes to the approved plans. 7. POST THIS PERMIT ON -SITE WITH THE APPROVED PLANS. APPLICANT SIGNATURE Call 48 hours before you dig for utility locates 1- 800 - 424 -5555 Page 2 of 2 DATE