CITY OF PORT TOWNSEND
DEVELOPMENT SERVICES DEPARTMENT
LAND USE INSPECTION REPORT
o �
Site Address
Contractor
Owner
Date of Inspection
Worksite or Cell Phone#
❑ Shoreline Conditions
❑ SEPA Conditions
❑ PUDA Conditions
❑ CUP Conditions
❑ Landscaping
❑ Parking
❑ Occupancy Approved
❑ Lighting
❑ Signage
❑ Tree Conservation
Measures
❑ ESA Review /Conditions
❑ Other
Design Review:
❑ Commercial
❑ Multi- family
❑ Cottage
❑ Historic
APPROVED ❑ APPROVED WITH CORRECTIONS ❑ NOT APPROVED
❑ SEE BELOW ❑ SEE COMMENT(S) BELOW
V \fix F �:._'_ '?��e �`�
Inspector Date
Acknowledged by Date
VoRaTr Tp
Sys CITY OF PORT TOWNSEND
DEVELOPMENT SERVICES DEPARTMENT
INSPECTION REPORT
For inspections, call the Inspection Line at 360-385-2294 by 3:00 PM the day before you want
the inspection. For Monday inspections, call by 3:00 PM Friday.
DATE OF INSPECTION: s '-1 C PERMIT NUMBER: 1"S
SITE ADDRESS: I",
PROJECT NAME: CONTRACTOR:
CONTACT PERSON: PHONE:
TYPE OF INSPECTION:
_f3,APPROVED ❑ APPROVED WITH ❑ NOT APPROVED
CORRECTIONS
Ok to proceed. Corrections will be Call for re-inspection before
f"'Checked at next inspection proceeding.
Inspector -v Date
Approved plans and permit card must be on-site and available at time of inspection. A re- inspection fee may
be assessed if work is not ready for inspection.
Development Services Department
250 Madison Street Suite 3
Port Townsend, WA 98368
Phone: (360) 379 -5095 Fax: (360) 344 -4619
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
For Next Day Inspection Call 385 -2294 Before 3P.M.
Permit Number: BLD06 -021 Issued: 02/21/2006
Job Address: 640 Adams Street Zoning: R -II
Nature of Work: Remodel single- family dwelling
Parcel Number: 989 - 713 -702
Type: V -B Occupancy: R -3
Owners: 640 Adams Street Trust Contractor: Owner
GENERAL CONDITIONS APPLY — SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Electrical — Contact Labor & Industries @ 360- 417 -2702
RF.(IITIi2IM INQPF.(TInNC
APPROVFD/DATF
POST & PIER FOUNDATION REPAIR
Footings /Forms
Reinforcement
Positive Connections
Pressure Treated Posts
PLUMBING:
Rough -In (D -V -T & Clean outs)
Water Supply
Pipe Insulation (R -3)
Water Heater (if applicable)
Seismic Restraint — strap tank @ 1/3 points
Pressure relief valve drain to exterior, terminate
6" — 24" above ground
Licensed Plumbing Contractor's Signature & License Number:
Lic # Sign here
FLOOR FRAMING
Fill exposed joist cavities with insulation; install vapor barrier on
warm side (towards subfloor)
6 mil black poly in crawl space; minimum 12" lap
MECHANICAL - LPG tank and stove covered under separate permit
Kitchen/Bath Fans
Environmental Air Exhaust ducting w/ back draft dampers, insulation
(R -4 in unheated space), and termination (3 feet from openings into
building)
Call 48 hours before you dig for utility line locates
1- 800 - 424 -5555
Page 1 of 3
RVOTTTRED TNCPECTIONC
Permit #BLD06 -021
/\77701TI 0117/ 1704 Y DI
INSULATION
Floor - fill exposed cavities
Walls - fill exposed cavities
Vapor Barrier: paint (on walls) or faced insulation
FINAL
House Numbers — 5" minimum
Plumbing
Mechanical/Heating
Vapor Barrier Paint Certificate (if applicable)
Smoke Detectors throughout: one in each sleeping room and in
area outside each sleeping room (hallway) with minimum one SD
on each floor
Final — Building
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's
registration number and a City business license. Failure to provide proof of this documentation prior
to work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on -site and inspected
prior to beginning construction; call 385 -2294. Measures shall include installation of silt fencing and
graveled construction entrance (see attached details). Adjacent rights -of -way shall be kept free of dirt
debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic
sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once
construction is complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by
required inspections.
5. Re- inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 385 -2294. A
minimum of twenty -four hours notice is required. Public Works approval must be received prior to
scheduling the Building Department's final inspection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for a non-
residential project.
Call 48 hours before you dig for utility line locates
1- 800 - 424 -5555
Page 2 of 3
Permit #BLD06 -021
8. All building permits expire if no progress has been made within six months, or if no inspections are
done by the Building Department within one year. Call for at least one inspection per year to keep
your building permit active.
9. Revisions require submittal and approval prior to making changes in the field. Contact the Building
Department (379 -5095) prior to making changes to the approved plans.
10. POST THIS PERMIT ON -SITE WITH THE APPROVED PLANS.
APPLICANT SIGNATURE DATE
Call 48 hours before you dig for utility line locates
1- 800 - 424 -5555