HomeMy WebLinkAboutBLD06-0154 kti�, CITY OF PORT TOWNSEND
U DEVELOPMENT SERVICES DEPARTMENT
INSPECTION REPORT
4'r
PERMIT NUMBER: L 0 0 b _ J '- °'
SITE ADDRESS: c
CONTRACTOR:
DATE OF INSPECTION:
WORKSITE OR CELL PHONE #: '36 f _ o 2---
TYPE OF INSPECTION REQUESTED:
For inspections, call the Inspection Line at 360 - 385 -2294 by 3:00 PM the day before you want
the inspection. For Monday inspections, call by 3:00 PM Friday.
4,
f ' ❑ APPROVED) ❑ APPROVED WITH CORRECTIONS ❑ NOT APPROVED
� NOTED BELOW CALL FOR RE- INSPECTION
- `' BEFORE PROCEEDING
k) 11A
-A
Cqi
Approved
fee may b
Inspector_
Acknowledged
and permit card must be on -site and available at time of inspection. A re- inspection
sed if work is not ready for inspection. A
Date
Date
r
t
a-' to
ra
•�� E L
W
t'= OV L
0
QJ to O (I )
i - a 0) Z
O =
o O af
Qo) E
Q ® N W
U_
L11
f 't7 U LE !—
V G m
'O (i) O a; J
ti !
V u
L ro Fi
a) CL O CY
Qj o
CL o Ca LL
O ® O p
N 0 Lam!
-
��� ru m�
O J fia
---�-
2 Q�
0 ® O' Z m
Lu O 0
m
LU M
h U
v nf L
O O U < Q Ln
~ -t
2 Q
m O O v o❑
uj O o
U Q �+
cn p a Lu
Q a m a
Lu
I- �3: 1.4 F M V �- z:)
O� p 0 AT r�lY
� tis
U �
a
>a
PERMIT NUMBER:
SITE ADDRESS:
CONTRACTOR:
DATE OF INSPECTION:
CITY OF PORT TOWNSEND
DEVELOPMENT SERVICES DEPARTMENT
INSPECTION REPORT
WORKSITE OR CELL PHONE #:
- 6 1I
TYPE OF INSPECTION REQUESTED:
For inspections, call the Inspection Line at 360- 385 -2294 by 3:00 PM the day before you want
the inspection. For Monday inspections, call by 3:00 PM Friday.
❑ APPROVED ❑ APPROVED WITH CORRECTIONS ❑ NOT APPROVED
NOTED BELOW CALL FOR RE- INSPECTION
BEFORE PROCEEDING
tic l _� /J
Approved pl ns and permit card must be on -site and available at time of inspection. A re- inspection
fee may bas essed if work is not ready for inspection.
InspectorC Date
of
Acknowledged
,p $f ` 1 tit / Date
CITY OF PORT TOWN SEND
DEVELOPMENT SERVICES DEPARTMENT
INSPECTION REPORT
PERMIT NUMBER: b LD_0/�
Site Address
Contractor
Owner
Date of Inspection
WA�
Worksite or Cell Phone# �56 f - 6-L I
U Erosion/Sediment Control
LJ Setbacks/Footings/LIFER
L) Foundation Walls
U Footing Drainage
Ll Slab/Interior Footing/insulation
L1 Groundwork/Plumbing Test
LJ Underfloor Framing
Ll Ext. Shear Wall/Holdowns
Ll Plumbing/Top Out
LJ Propane Pipe/Pressure Test
LJ Propane Tank/Line
LJ Mechanical
Ll Framing
*sulation
L) Interior Shear/BWP Nail
L) Drywall/Fire Wall
El
Ll Propane/Wood Appliance
Ll Manufactured Home Set-up
Ll Fire Department
L) Temporary Occupancy
L] Fees Paid
C] Fingr-6ccupancy
AV/Other/Consultation
AM-
N
z
Approve ans and permit card must • on-site and available at time of inspection.
Inspector Date
Acknowledged by 16 6) A) t� Date
eke °7r °,ys� CITY OF PORT TOWNSEND
DEVELOPMENT SERVICES DEPARTMENT
WA INSPECTION INSPECTION REPORT
Owner
Date of Inspection
Worksite or Cell Phone# -3n f 0�
❑ Erosion /Sediment Control ❑ Plumbing/Top Out ❑ Propane/Wood Appliance
etback5EqWWg§jjJFER ❑ Propane Pipe /Pressure Test ❑ Manufactured Home Set -up
❑ Foundation Walls ❑ Propane Tank/Line ❑ Fire Department
❑ Footing Drainage ❑ Mechanical
❑ Slab /Interior Footing /Insulation ❑ Framing
❑ Groundwork/Plumbing Test
❑ Underfloor Framing
❑ Ext. Shear Wall /Holdowns
❑ Insulation
❑ Interior Shear /BWP Nail
❑ Drywall /Fire Wall
❑ Temporary Occupancy
❑ Fees Paid
❑ Final Occupancy
❑ Other /Consultation
Inspector
Acknowledged by
it card must be on -site
1 '31z 11-4
d available at time of inspection.
Date
Date
CITY OF PORT TOWNSEND
DEVELOPMENT SERVICES DEPARTMENT
INSPECTION REPORT
PERMIT NUMBER: b &S- —a-
Site Site Address
Contractor
Owner
Date of Inspection
12A)A,
--
Worksite or Cell Phone# I "': L ?O / '2 h-(YZ-
Ll Erosion/Sediment Control
LJ Setbacks/Footings/UFER
VFoundation Walls
L3 Footing Drainage
U Slab/Interior Footing/insulation
Ll Groundwork/Plumbing Test
U Underfloor Framing
L1 Ext. Shear Wall/Holdowns
L3 Plumbing/Top Out
L) Propane Pipe/Pressure Test
L) Propane Tank/Line
Ll Mechanical
LJ Framing
U Insulation
L) Interior Shear/BWP Nail
L) Drywall/Fire Wall
LJ Propane/Wood Appliance
LJ Manufactured Home Set-up
L) Fire Department
Ll Temporary Occupancy
Ll Fees Paid
LJ Final Occupancy
LJ Other/Consultation
C) Ppla
()0,t\ , / ()
Approved s and permit card must be on-site and available at time of inspection. i C 14 VLI Da te . " - '-� 6-6
713
Inspector P7; 7a__
Acknowledged by Date
VORT CITY OF PORT TOWNSEND
DEVELOPMENT SERVICES DEPARTMENT
INSPECTION REPORT
PERMIT NUMBER: cf3LAf)D&_ 01S
Site Address
Contractor
Owner
Date of Inspection
t0
Worksite or Cell Phone# (3 (� [ —
❑ Erosion/Sediment Control ❑ Plumbing/Top Out ❑ Propane/Wood Appliance
❑ Setbacks/Footings/UFER ❑ Propane Pipe/Pressure Test ❑ Manufactured Home Set-up
❑ Foundation Walls ❑ Propane Tank/Line ❑ Fire Department
❑ Footing Drainage
❑ Slab/interior Footing/insulation
❑ Groundwork/Plumbing Test
❑ Underfloor Framing
)SdFxt. Shear Wall/Holdowns
❑ Mechanical
❑ Framing
❑ Insulation
❑ Interior Shear/BWP Nail
❑ Drywall/Fire Wall
❑ Temporary Occupancy
❑ Fees Paid
❑ Final Occupancy
❑ Other/Consultation
ALL
Approved ,,la ls and permit card must be on-site and available at time of inQppction.
Inspector I C Date
Acknowledged by Date
ORT
CITY OF PORT TOWNSEND
DEVELOPMENT SERVICES DEPARTMENT
W INSPECTION REPORT
PERMIT NUMBER: *zb1.b06,—
Site Address 3 hi
Contractor o
Owner C?
Date of Inspection
Worksite or Cell Phone#
❑ Erosion/Sediment Control
❑ Setbacks /Footings /LIFER
❑ Foundation Walls
❑ Footing Drainage 5L4,6
lab /Interior Footing/Insulation
❑ Groundwork/Plumbing Test
❑ Underfloor Framing
❑ Ext. Shear Wall/Holdowns
❑ Plumbing/Top Out
❑ Propane Pipe/Pressure Test
❑ Propane Tank/Line
❑ Mechanical
❑ Framing
❑ Insulation
❑ Interior Shear/BWP Nail
❑ Drywall/Fire Wall
4z /Y
❑ Propane/Wood Appliance
❑ Manufactured Home Set-up
❑ Fire Department
❑ Temporary Occupancy
❑ Fees Paid
❑ Final Occupancy
❑ Other/Consultation
/
2S
AJ
V
Approved I s and permit card must be on-site and available at time of in ection.
06
v
td
Date
Inspector --- I
Acknowledged by 4)k Date
°4Q °RTr °ys� CITY OF PORT TOWNSEND
U DEVELOPMENT SERVICES DEPARTMENT
INSPECTION REPORT
LD 0 0 1
Site Address c �
Contractor
Owner
't �o k(_q \(('I
Date of Inspection
Worksite or Cell Phone#
❑ Erosion /Sediment Control
❑ Setbacks /Footings /LIFER
❑ Foundation Walls
❑ Footing Drainage
• Slab /Interior Footing /Insulation
• Groundwork/Plumbing Test
• Underfloor Framing
❑ Ext. Shear Wall /Holdowns
1 �
I- �:-;
❑ Plumbing/Top Out
❑ Propane Pipe /Pressure Test
❑ Propane Tank/Line
❑ Mechanical
Framing
❑ Insulation
❑ Interior Shear /BWP Nail
❑ Drywall /Fire Wall
❑ Propane/Wood Appliance
• Manufactured Home Set -up
• Fire Department
❑ Temporary Occupancy
❑ Fees Paid
❑ Final Occupancy
❑ Other /Consultation
Inspector U,
Acknowledged
M7M
t card must be on -site and available at time of inspection.
Date ' 0 (>
Date
Development Services Department
250 Madison Street, Suite 3
Port Townsend, WA 98368
Phone: (360) 379 -3208 Fax: (360) 344 -4619
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
For Next Day Inspection Call 385 -2294 Before 3P.M.
Permit Number: BLD06 -015 Issued: 2/7/06 Parcel Number: 985 201 402
Job Address: 2315 Madrona Street Zoning: R -II Type: V -B Occupancy: R -3
Nature of Work: Construct sinile- family Residence
Owners: QED/Madrona Village Contractor: QED Builders QUDBUI *043101
GENERAL CONDITIONS APPLY — SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Electrical — Contact Labor & Industries @ 360 - 417 -2702
* ** All elements of engineering including holdowns, framing, nailing and other engineering connections
require inspection prior to cover. * **
R V OI TIR V) INCPF.CTI()NC
APPROWD/DATE
TEMP EROSION & SEDIMENT CONTROL
See General Condition No. 2
Silt Fence as needed
Drive Off Mat to restrict sediment from leaving the site
FOOTINGS
Setbacks
Footings
Forms
Reinforcement
Holdowns MUST BE TIED IN PLACE
NO WET STICKING)
Anchor Bolts & Washers
UFER Ground (tied to footing rebar steel)
Interior Pads
FOUNDATION WALLS
Reinforcement
Hold Downs
Anchor Bolts & Washers
Foundation drain
Must be inspected prior to back -fill of foundation
Call 48 hours before you dig for utility line locates
1- 800 - 424 -5555
Page 1 of 5
Permit #BLD06 -015
PLUMBING:
Rough -In (D -V -T & Clean outs)
Water Supply
Water Hammer Arrester (on dishwasher, ice maker & clothes
washer)
Hose Bibs (backflow protection required)
Pipe Insulation (R -3)
Pressure Reduction Valve required
Water Heater
Seismic Restraint — strap tank @ 1/3 points
Pressure relief valve drain to exterior, terminate
6" — 24" above ground
Licensed Plumbing Contractor's Signature & License
Number:
Sign here
FLOOR FRAMING
CALL FOR INSPECTION BEFORE COVER
Joists
Girders
Posts
Hangers
Blocking Positive Connections
Treated Wood to Concrete
Pressure treated plate connections
Anchor Bolts & Washers
Hold downs
Shear wall nailing & holdowns
EXTERIOR BRACED WALL PANELS (MUST BE
INSPECTED PRIOR TO COVERING)
MECHANICAL
Whole House Fan
Kitchen/Bath/Laundry Fans
Environmental Air Exhaust ducting (w/ back draft dampers),
Insulation (R -4) (on ducting in unheated space)
LPG Stove
LPG Tank
Gas Piping
FRAMING — all members and connections require inspection
prior to cover
Fasteners hangers etc. in contact with treated material must be
hot dipped galvanized
Walls
Headers
Rafters (hurricane clips)
Roof Sheathing — Nailed w/ 8 d's @ 2" o.c. per Engineering
Joists (hangers)
Call 48 hours before you dig for utility line locates
1- 800 - 424 -5555
Page 2 of 5
Permit #BLD06 -015
Blocking
Roof Venting — eave and ridge vents
Windows - egress
Smoke detectors (bedrooms, outside bedrooms and each floor)
Safety Glazing
Windows U factor - .40 or better
Doors U- factor - .20 or better
NFRC window sticker must be on window, skylights & doors at
insp. time.
Air Seal
Fire Blocking
Weather Resistive Barrier
INSULATION
Floor (R -30)
Walls (R -21
Ceiling - attic (R -30 vault)
Vapor Barrier: paint for walls and ceiling
Baffles
PUBLIC WORKS FINAL
Public Works Sign -Off (prior to building final)
FINAL
Parking — 2 space required
House Numbers — 5" minimum
Plumbing
Mechanical/Heating
Vapor Barrier Paint Certificate
Insulation Certificate
Smoke Detectors
Final — Building
Call 48 hours before you dig for utility line locates
1- 800 - 424 -5555
Page 3 of 5
Permit #BLD06 -015
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's
registration number and a City business license. Failure to provide proof of this documentation prior
to work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on -site and inspected
prior to beginning construction; call 385 -2294. Measures shall include installation of silt fencing and
graveled construction entrance (see attached details). Adjacent rights -of -way shall be kept free of dirt
debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic
sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once
construction is complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by
required inspections.
5. Re- inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 385 -2294. A
minimum of twenty -four hours notice is required. Public Works approval must be received prior to
scheduling the Building Department's final inspection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for a non-
residential project.
8. All building permits expire if no progress has been made within six months, or if no inspections are
done by the Building Department within one year. Call for at least one inspection per year to keep
your building permit active.
9. Revisions require submittal and approval prior to making changes in the field. Contact the Building
Department (379 -3208) prior to making changes to the approved plans.
10. POST THIS PERMIT ON -SITE WITH THE APPROVED PLANS.
Call 48 hours before you dig for utility line locates
1- 800 - 424 -5555
Page 4 of 5
Permit #BLD06 -015
APPLICANT SIGNATURE DATE
Call 48 hours before you dig for utility line locates
1- 800 - 424 -5555
Page 5 of 5