Loading...
HomeMy WebLinkAboutBLD06-009A Development Services Department 250 Madison Street, Suite 3 Port Townsend, WA 98368 Phone: (360) 379 -3208 Fax: (360) 344 -4619 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE For Next Day Inspection Call 385 -2294 Before 3P.M. Permit Number: BLD06 -009 Issued: 11/13/2006 Parcel Number: 948 324 901 & 902 Job Address: 651 Cleveland Street Zoning: C -II Type: V -B Occupancy: RR =1 Nature of Work: Convert garage to two bungalows Owners: Freeland Investments Inc. dba Manresa castle Contractor: Owner i GENERAL CONDITIONS APPLY —SEE LAST PAGE o ka7t) C[ / �� SEPARATE PERMITS REQUIRED: L Electrical — Contact Labor & Industries @ 360 -417 -2702 NOTE: ACQUAINT YOURSELF WITH THE LISTED REQUIRMENTS TO RECEIVE FINAL BUILIDNG INSPECTION PRIOR TO THE START OF CONSTRUCTION AND PRIOR TO YOUR REQUEST FOR FINAL INSPECTION. * ** All elements of engineering including holdolvns, framing, nailing and other engineering connections require inspection prior to cover. * ** RF 111IRFI) INfiPFCTI0NS APPROVED/DATE TEMP EROSION & SEDIMENT CONTROL See General Condition No. 2 Silt Fence as needed Drive Off Mat to restrict sediment from leaving the site PLUMBING: Rough -In (D -V -T & Clean outs) Water Supply Water Hammer Arrester (on dishwasher, ice maker & clothes washer) Hose Bibs (backflow protection required) Pipe Insulation (R -3) Pressure Reduction Valve required Water Heater Seismic Restraint — strap tank @ 1/3 points Pressure relief valve drain to exterior, terminate 6" — 24" above ground Expansion tank Call 48 hours before you dig for utility line locates 1- 800 - 424 -5555 Page 1 of 3 Permit #BLD06 -009 MECHANICAL Whole House Fan W/ 24 hour timer Kitchen/Bath/Laundry Fans Environmental Air Exhaust ducting (w/ back draft dampers), Insulation (R -4) (on ducting in unheated space) FRAMING — all members and connections require inspection prior to cover Fasteners hangers etc in contact with treated material must be hot dipped galvanized Rafters (hurricane clips) Roof Venting — eave and ridge vents Smoke detectors (bedrooms, outside bedrooms and each floor) Safety Glazing Windows U factor - .40 or better Doors U- factor - .20 or better NFRC window sticker must be on window, skylights & doors at insp. time. Air Seal INSULATION Walls (R-2 1) Vault (R -30) Attic (R-30) Vapor Barrier: paint for walls and ceiling Baffles DRYWALL FIRE DEPARTMENT Fire sprinklers PUBLIC WORKS FINAL Public Works Sign-Off (prior to building final FINAL Mechanical/Heating LPG Vapor Barrier Paint Certificate Smoke Detectors Final — Building Call 48 hours before you dig for utility line locates 1 -800- 424 -5555 Page 2 of 3 Permit #BLD06 -009 GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on -site and inspected prior to beginning construction; call 385 -2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights -of -way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re- inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385 -2294. A minimum of twenty -four hours notice is required Public Works approval must be received prior to scheduling the Building Department's final inspection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for a non - residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal and approval prior to making changes in the field. Contact the Building Department (379 -3208) prior to making changes to the approved plans. 10. POST THIS PERMIT ON -SITE WITH THE APPROVED PLANS. APPLICANT SIGNATURE DATE Call 48 hours before you dig for utility line locates 1- 800 - 424 -5555 Page 3 of 3