HomeMy WebLinkAboutBLD06-003CITY OF PORT TOWNSEND
p DEVELOPMENT SERVICES DEPARTMENT
` INSPECTION REPORT
PERMIT NUMBER: in n� — (0 C) 'a
SITE ADDRESS:
CONTRACTOR:
DATE OF INSPECTION:
WORKSITE OR CELL PHONE #: (,
TYPE OF INSPECTION REQUESTED: E:1 t)%! F11f� c;�'LP�,�,
For inspections, call the Inspection Line at 360 - 385 -2294 by 3:00 PM the day before you want
the inspection. For Monday inspections, call by 3:00 PM Friday.
❑ APPROVED
11 APPROVED WITH CORRECTIONS ❑ NOT APPROVED
NOTED BELOW CALL FOR RE- INSPECTION
BEFORE PROCEEDING
Akk ,'� Y t fe
Approved plans and permit card must be on -site and available at time of inspection. A re- inspection
fee may be p�essed if work is not ready for inspection.
Inspector ,v Date C 7
Acknowledged a V_ Date
Qosrro
Site Address
L 0 1 LTJ rqT:
lin-0
im �
i Eli
DEVELOPMENT SERVICES DEPARTMENT
INSPECTION REPORT
"Yz/ -110 L
Contractor OWAJ
Owner
Date of Inspection
Worksite or Cell Phone#
Ll Erosion/Sediment Control
U Setbacks /Footings /LIFER
Ll Foundation Walls
Ll Footing Drainage
J Plumbing/Top Out
Ll Propane Pipe/Pressure Test
U Propane Tank/Line
U Mechanical
L) Slab/interior Footing/insulation Ll Framing
U Groundwork/Plumbing Test U Insulation
L) Underfloor Framing LJ Interior Shear/BWP Nail
L) Ext. Shear Wall/Holdowns U Drywall/Fire Wall
!=�# •J=
Inspector 6 ) -
Acknowledged by
permit card must be on-site and available at time of Inspe tione
u� t�
Date
Date
�QORr rake CITY OF PORT TOWNSEND
DEVELOPMENT SERVICES DEPARTMENT
INSPECTION REPORT
PERMIT NUMBER: ✓ ED 6 � — 0 0
SITE ADDRESS: T 5/-p "-0LC_0V
CONTRACTOR:
DATE OF INSPECTION: S_ It-6
WORKSITE OR CELL PHONE
TYPE OF INSPECTION REQUESTED: t 1(( �`i �-��� 00/ d;V q`6- )
V8k<-,
For inspections, call the Inspection Line at 360 - 385 -2294 by 3:00 PM the day before you want
the inspection. For Monday inspections, call by 3:00 PM Friday.
❑ APPROVED ❑ APPROVED WITH CORRECTIONS �' ❑ NOT APPROVED ,
NOTED BELOW CALL FOR RE- INSPECTION
BEFORE PROCEEDING
Approved plans and permit card must be on -site and available at time of inspection. A re- inspection
fee may b , a sessed if work is not ready for inspection.
6 Inspector Date lJ
Acknowledged Date
CITY OF PORT TOWNSEND
DEVELOPMENT SERVICES DEPARTMENT
INSPECTION REPORT
PERMIT NUMBER 0 ~
SITE ADDRESS:
CONTRACTOR:
DATE OF INSPECTION:
WORKSITE OR CELL PHONE #: (P , - 9 L
TYPE OF INSPECTION REQUESTED: F(?) �i
c�
For inspections, call the Inspection Line at 360 - 385 -2294 by 3:00 PM the day before you want
the inspection. For Monday inspections, call by 3:00 PM Friday.
CCJAPPROVED
❑ APPROVED WITH CORRECTIONS
NOTED BELOW
❑ NOT APPROVED
CALL FOR RE- INSPECTION
BEFORE PROCEEDING
Approved plans and permit card must be on -site and available at time of inspection. A re- inspection
fee may b ssessed if work is not ready for inspection.
Inspector �-t- - Date c
Acknowledge �ry Date
PORT t
CITY OF PORT TOWNSEND
fin DEVELOPMENT SERVICES DEPARTMENT
INSPECTION REPORT
TWA
PERMIT NUMBER: j u) —
SITE ADDRESS:
CONTRACTOR:
DATE OF INSPECTION:
ran
WORKSITE OR CELL PHONE #: 3 to
TYPE OF INSPECTION REQUESTED: ( 1�
For inspections, call the Inspection Line at 360 - 385 -2294 by 3:00 PM the day before you want
the inspection. For Monday inspections, call by 3:00 PM Friday.
❑ APPROVED
Af
❑ APPROVED WITH CORRECTIONS ❑ NOT APPROVED
NOTED BELOW CALL FOR RE- INSPECTION
BEFORE PROCEEDING
Approved plans and permit card must be on -site and available at time of inspection. A re- inspection
fee may be assessed if work is not ready for inspection.
-.... i 5
Inspector _. Date
Acknowledged, Date
4pOHT Tai
GrWA`'
ERMIT NUMBER:
SITE ADDRESS:_
CONTRACTOR:
DATE OF INSPE
WORKSITE OR
CITY OF PORT TOWNSEND
DEVELOPMENT SERVICES DEPARTMENT
INSPECTION REPORT
6LDDL
: �' -(-), ! S_ 4 Eb � U3-rn b
c
TYPE OF INSPECTION REQUESTED: ?_
For inspections, call the Inspection Line at 360 -385 -2294 by 3:00 PM the day before you want
the inspection. For Monday inspections, call by 3:00 PM Friday.
❑ APPROVED ❑APPROVED WITH CORRECTIONS ❑ NOT APPROVED
NOTED BELOW CALL FOR RE- INSPECTION
BEFORE PROCEEDING
t
Approved plans and permit card must be on -site and available at time of inspection. A re- inspection
fee may bqAssessed if work is not ready for inspection.
,, tInspector �� � �' ��''`�`' �. Date
Acknowledged Date
Date of Inspection
Worksite or Cell Phone#
Ll Erosion/Sediment Control
Ll Setbacks/Footings/UFER
L) Foundation Walls
LJ Footing Drainage
L3 Slab/interior Footing/Insulation
Li Groundwork/Plumbing Test
LJ Plumbing/Top Out
LJ Propane Pipe/Pressure Test
L) Propane Tank/Line
L) Mechanical
LJ Framing
LJ Insulation
Ll Underfloor Framing L) Interior Shear/BWP Nail
LJ Ext. Shear Wall/Holdowns * rywall/Fire Wall
Ll Propane/Wood Appliance
Ll Manufactured Home Set-up
Ll Fire Department
LJ Temporary Occupancy
Ll Fees Paid
LJ Final Occupancy
Ll Other/Consultation
For inspections, call the Inspection Line at 360-385-2294 by 3:00 PM the day before you want the inspection;
for Monday inspections call by 3:00 PM Friday. Additional fees may be assessed for multiple re-inspections
if the work is not ready and the inspector must return to the site. Failure to provide inspection record and
approved plans on the site will result in $47 re-inspection fee charge. (OCCUPANCY REQUIRES PRIOR
WRITTEN APPROVAL BY DSD.)
710172yffw; M
110AJ
N-YOW11 �0_1:003LTITJI!1111119 i
Ai ij IV
fl
, Nrf VZ LA it 6-EL
,o QA ILA- P7
)A7lr (.1 \jj I
p"
Approve, ans and permit card must be on-site and available at time of in pection.
Lo Date
Inspector 1 0-, (<�_ I L_1�6
Acknowledged by 0(10' . ..... Date7
WA
FEMY''T11-71TI , 1111f 15rEro-i
Site Address
Contractor
UNNam Is"
51-1
AM
Date of Inspection
Worksite or Coll Phone#
Ll Erosion/Sediment Control
LJ Setbacks /Footings /LIFER
Ll Foundation Walls
U Footing Drainage
LJ Slab/Interior Footing/Insulation
LJ Groundwork/Plumbing Test
U Underfloor Framing
Ll Ext. Shear Wall/Holdowns
S/7
L) Plumbing/Top Out
LJ Propane Pipe/Pressure Test
LJ Propane Tank/Line
Ll Mechanical
• Framing
• Insulation
• Interior Shear/BWP Nail
4Drywall/Fire Wall
U Propane/Wood Appliance
LJ Manufactured Home Set-up
• Fire Department
• Temporary Occupancy
LI Fees Paid
LJ Final Occupancy
LJ Other/Consultation
hP
Inspector 1)(C
Acknowledged by
ird must be on-site and available at time of inspection.
Date
Date
B
a4V°RTr °s CITY OF PORT TOWNSEND
U DEVELOPMENT SERVICES DEPARTMENT
FWA8,�� INSPECTION REPORT
PERMIT NUMBER: O b
Site Address r)"��
Contractor
Owner
Date of Inspection
Worksite or Cell Phone#
❑ Erosion /Sediment Control
❑ Setbacks /Footings /UFER
❑ Foundation Walls
❑ Footing Drainage
❑ Slab /Interior Footing /Insulation
❑ Groundwork/Plumbing Test
❑ Underfloor Framing
❑ Ext. Shear Wall /Holdowns
z
6
'Plumbing/Top Out ❑ Propane/Wood Appliance
❑ Propane Pipe /Pressure Test ❑ Manufactured Home Set -up
Mropane Tank/Line
echanical
raming
❑ Insulation
❑ Interior Shear /BWP Nail
❑ Drywall /Fire Wall
❑ Fire Department
❑ Temporary Occupancy
❑ Fees Paid
❑ Final Occupancy
❑ Other /Consultation
For inspections, call the Inspection Line at 360- 385 -2294 by 3:00 PM the day before you want the inspection;
for Monday inspections call by 3:00 PM Friday. Additional fees may be assessed for multiple re- inspections
if the work is not ready and the inspector must return to the site. Failure to provide inspection record and
approved plans on the site will result in $47 re- inspection fee charge. (OCCUPANCY REQUIRES PRIOR
WRITTEN APPROVAL BY DSD.)-
/ ( 0' OI
d
Approved Ins and permit card must
Inspector 4
Acknowledged by - °' A
C° R L'
on -site and available at time of in ectio .
Date � ' 6
Date
,?OST
D4 'tom
WA
INSPECTION REPORT
I i - 04 o
Site Address ;q b 5 /-4 110 I Co Lm 5T—.
_G L, 1� RV I-
Contractor 7-�
Date of Inspection
Worksite or Cell Phone#
❑ Erosion/Sediment Control
❑ Setbacks /Footings /LIFER
❑ Foundation Walls
Ll Footing Drainage
❑ Slab/Interior Footing/Insulation
❑ Groundwork/Plumbing Test
❑ Underfloor Framing
❑ Ext. Shear Wall/Holdowns
Slsld�
/43
❑ Plumbing/Top Out
❑ Propane Pipe/Pressure Test
❑ Propane Tank/Line
❑ Mechanical
❑ Framing
)<Insulation
❑ Interior Shear/BWP Nail
❑ Drywall/Fire Wall
W
❑ Propane/Wood Appliance
❑ Manufactured Home Set-up
❑ Fire Department
❑ Temporary Occupancy
❑ Fees Paid
❑ Final Occupancy
❑ Other/Consultation
I i o
T-7
AJ TW_ LA
MrIltuffmo!
Inspector _Pk- -
Acknowledged by
te on-site and available at time of inspqctlion.
Date
VORTYp
ys
U b
°F was�`�
PERMIT NUMBER:
Site Address
Contractor
Date of Inspection
Worksite or Cell Phone# L�J�13 c9 M a l
❑ Erosion /Sediment Control
❑ Setbacks /Footings /LIFER
❑ Foundation Walls
❑ Footing Drainage
❑ Plumbing/Top Out
❑ Propane Pipe /Pressure Test
❑ Propane Tank/Line
❑ Mechanical
❑ Slab /Interior Footing /insulation ❑ Framing
❑ Groundwork/Plumbing Test ❑ Insulation
❑ Underfloor Framing ❑ Interior Shear /BWP Nail
/mot. Shear Wall /Holdowns ❑ Drywall /Fire Wall
❑ Propane/Wood Appliance
❑ Manufactured Home Set -up
❑ Fire Department
❑ Temporary Occupancy
❑ Fees Paid
❑ Final Occupancy
❑ Other /Consultation
,t
Approve7,gged ns and permit card must be on -site and available at time of ins ection.
Inspector- Date
Acknowle by ' <. Date
,,OST
■
Site Address
FI Ila n 4 to-] % a I A I M: a -0a ATJ Cell
���QALNEPI�
Contractor CU. (T- - P,
Owner
Date of Inspection
Worksite or Cell Phone#
❑ Erosion/Sediment Control
❑ Setbacks/Footings/UFER
❑ Foundation Walls
❑ Footing Drainage
❑ Slab/interior Footing/Insulation
❑ Groundwork/Plumbing Test
❑ Underfloor Framing
❑ Ext. Shear Wall/Holdowns
,60
❑ Plumbing/Top Out
❑ Propane Pipe/Pressure Test
❑ Propane Tank/Line
❑ Mechanical
❑ Framing
❑ Insulation
❑ Interior Shear/BWP Nail
❑ Drywall/Fire Wall
❑ Propane/Wood Appliance
❑ Manufactured Home Set-up
❑ Fire Department
❑ Temporary Occupancy
❑ Fees Paid
❑ Final Occupancy
Other /Consultation
must be on-site and available at time of inspection.
_4
DatetJ
nntp
CITY OF PORT TOWNSEND
DEVELOPMENT SERVICES DEPARTMENT
W INSPECTION REPORT
PERMIT NUMBER: 3 1
Site Address
Contractor
Owner
Date of Inspection
Worksite or Cell Phone#
❑ Erosion/Sediment Control
❑ Setbacks/Footings/UFER
❑ Foundation Walls
❑ Footing Drainage
A&Interior Footing/Insulation
❑ Groundwork/Plumbing Test
❑ Underfloor Framing
❑ Ext. Shear Wall/Holdowns
❑ Plumbing/Top Out
❑ Propane Pipe/Pressure Test
❑ Propane Tank/Line
❑ Mechanical
❑ Framing
❑ Insulation
❑ Interior Shear/BWP Nail
❑ Drywall/Fire Wall
❑ Propane/Wood Appliance
❑ Manufactured Home Set-up
❑ Fire Department
❑ Temporary Occupancy
❑ Fees Paid
❑ Final Occupancy
❑ Other/Consultation
a
I
MEM=
Inspector"
Acknowledged
and per and
y
� -t �
p P k, L /I
I -
lust be on-site and available at time of inspection.
0
Date
Date
VOIAT
CITY OF PORT TOWNSEND
DEVELOPMENT SERVICES DEPARTMENT
WA INSPECTION REPORT
PERMIT NUMBER:
Site Address
Contractor
Owner -
Date of Inspection
� -3
V)
Worksite or Cell Phone# (0 11-13 - - d"q 1-0-
❑ Erosion/Sediment Control ❑ Plumbing/Top Out ❑ Propane/Wood Appliance
❑ Setbacks/Footings/UFER ❑ Propane Pipe/Pressure Test ❑ Manufactured Home Set-up
❑ Foundation Walls
`Footing Drainage
'J, ❑ Slab/Interior Footing/insulation
/U--Groundwork/Plumbing Test
❑ Underfloor Framing
❑ Ext. Shear Wall/Holdowns
❑ Propane Tank/Line
❑ Mechanical
❑ Framing
❑ Insulation
❑ Interior Shear/BWP Nail
❑ Drywall/Fire Wall
❑ Fire Department
❑ Temporary Occupancy
❑ Fees Paid
❑ Final Occupancy
❑ Other/Consultation
(j
AIF-A
Aj (1 Aj -A V
Approve Tana and permit card must be on-site and available at time of inspection.
Inspector KJ 21 (1/,. Date - 2)
Acknowledged by /U6 Date
,?OFS;T CITY OF PORT TOWNSEND
DEVELOPMENT SERVICES DEPARTMENT
INSPECTION REPORT
PERMIT NUMBER: )BLID C). (0 — no-3
Site Address !` l -9 00L) M
Contractor
Date of Inspection
Worksite or Cell Phone# 62 �] 3 � q LQ I
❑ Erosion/Sediment Control
❑ Setbacks/Footings/UFER
/)IlFoundati.on Walls
❑ Footing Drainage
❑ Slab/Interior Footing/insulation
❑ Groundwork/Plumbing Test
❑ Underfloor Framing
❑ Ext. Shear Wall/Holdowns
❑ Plumbing/Top Out
❑ Propane Pipe/Pressure Test
❑ Propane Tank/Line
❑ Mechanical
❑ Framing
❑ Insulation
❑ Interior Shear/BWP Nail
❑ Drywall/Fire Wall
❑ Propane/Wood Appliance
❑ Manufactured Home Set-up
❑ Fire Department
❑ Temporary Occupancy
❑ Fees Paid
❑ Final Occupancy
❑ Other/Consultation
For inspections, call the Inspection Line at 360-385-2294 by 3:00 PM the day before you want the inspection;
for Monday inspections call by 3:00 PM Friday. Additional fees may be assessed for multiple re-inspections
if the work is not ready and the inspector must return to the site. Failure to provide inspection record and
approved plans on the site will result in $47 re-inspection fee charge. (OCCUPANCY REQUIRES PRIOR
WRITTEN APPROVAL BY DSD.)
XkAPPROVED LJ APPROVED WITH CORRECTIONS Ll NOT APPROVED
SEE BELOW SEE COMMENT(S) BELOW
W70E=1 �
Inspector I
Acknowledged by
it card must be on-site and available at time of inspection.
DateY3A) C-
Date
Date of Inspection
CITY OF PORT TOWNSEND
DEVELOPMENT SERVICES DEPARTMENT
INSPECTION REPORT
d �J D/) o-nn_3
Worksite or Cell Phone# L 3 f C), 9 1 o I
❑ Erosion/Sediment Control ❑ Plumbing/Top Out ❑ Propane/Wood Appliance
_,-,,Setbacks/Footings/UFER ❑ Propane Pipe/Pressure Test L) Manufactured Home Set-up
❑ Foundation Walls ❑ Propane Tank/Line ❑ Fire Department
AI • • 00 . . ��
❑ Mechanical
❑ Slab/Interior Footing/Insulation ❑ Framing
❑ Groundwork/Plumbing Test ❑ Insulation
❑ Underfloor Framing ❑ Interior Shear/BWP Nail
❑ Ext. Shear Wall/Holdowns ❑ Drywall/Fire Wall
❑ Temporary Occupancy
❑ Fees Paid
❑ Final Occupancy
❑ Other/Consultation
rz�\
In
0- :4 1 0=0
Inspector V Is IC
Acknowledged by
and permit card must be on-site all.
7--AYL'o ez
available at time of inspection.
Date
Date _Z,� Z
Waterman & Katz Building
181 Quincy Street, Suite 301
Port Townsend, WA 98368
Phone: (360) 379 -3208 Fax: (360) 385 -7675
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
For Next Day Inspection Call 385 -2294 Before 3P.M.
Permit Number: BLD06 -003 Issued: 02/06/2006 Parcel Number: 968 - 500 -018
Job Address: 4054 Holcomb St. Zoning: R -II Type: V -B Occupancy: R -3
Nature of Work: Construct single- family dwelling
Owners: Troy Frutiger
Contractor: Owner
NOTE: OUTDOOR CONSTRUCTION ON SITE SHALL BE LIMITED TO HOURS
OF 8 A.M. TO 6 P.M. MONDAY THROUGH FRIDAY, AND PROHIBITED ON
SATURDAYS, SUNDAYS, AND NATIONAL HOLIDAYS. ANY EXCEPTIONS
MADE NECESSARY BY SPECIAL AND UNUSUAL CIRCUMSTANCES MUST BE
APPROVED IN ADVANCE BY THE BUILDING OFFICIAL.
GENERAL CONDITIONS APPLY — SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Electrical — Contact Labor & Industries @ 360 - 417 -2702
* ** All elements of engineering including holdowns, framing, nailing and other engineering connections
require inspection prior to cover. * **
REQUIRED INSPECTIONS
APPROVED/DATE
TEMP EROSION & SEDIMENT CONTROL
See General Condition No. 2
Silt Fence as needed
Drive Off Mat to restrict sediment from leaving the site
FOOTINGS
Setbacks
Footings
Forms
Reinforcement
Holdowns MUST BE TIED IN PLACE
NO WET STICKING
Anchor Bolts & Washers
UFER Ground (tied to footing rebar steel)
Interior Pads
Call 48 hours before you dig for utility line locates
1- 800 - 424 -5555
Page 1 of 4
Permit #BLD06 -003
FOUNDATION WALLS
Reinforcement
Hold Downs
Foundation drain
Must be inspected prior to back -fill of foundation
PLUMBING:
Rough -In (D -V -T & Clean outs)
Water Supply
Water Hammer Arrester (on dishwasher, ice maker & clothes
washer)
Hose Bibs (backflow protection required)
Pipe Insulation (R -3)
Pressure Reduction Valve required
Water Heater
Seismic Restraint — strap tank @ 1/3 points
Pressure relief valve drain to exterior, terminate
6" — 24" above ground
Licensed Plumbing Contractor's Signature & License
Number:
Sign here
FLOOR FRAMING
CALL FOR INSPECTION BEFORE COVER
Joists
Girders
Posts
Hangers
Blocking. Positive Connections
Treated Wood to Concrete
Pressure treated plate connections
Anchor Bolts & Washers
Hold downs
MECHANICAL
Whole House Fan
Kitchen/Bath/Laundry Fans
Environmental Air Exhaust ducting (w/ back draft dampers),
Insulation (R -4) (on ducting in unheated space)
LPG Stove & Cook stove
LPG Tank
Gas Piping
EXTERIOR BRACED WALL PANELS (MUST BE
INSPECTED PRIOR TO COVERING)
Call 48 hours before you dig for utility line locates
1- 800 - 424 -5555
Page 2 of 4
Permit #BLD06 -003
FRAMING — all members and connections require inspection
prior to cover
Fasteners, hangers, etc. in contact with treated material must be
hot dipped galvanized
Walls
Headers
Rafters (hurricane clips)
Joists (hangers)
Blocking
Roof Venting — eave and ridge vents
Windows - egress
Smoke detectors (bedrooms, outside bedrooms and each floor)
Safety Glazing
Windows U factor - .40 or better
Doors U- factor - .20 or better
NFRC window sticker must be on window, skylights & doors at
insp. time.
Air Seal
Fire Blocking
Weather Resistive Barrier
INSULATION
Floor (R-10)
Walls (R -21
Ceiling - attic (R -38) (R -30 vault)
Vapor Barrier: paint for walls and ceiling
Baffles
PUBLIC WORKS FINAL
Public Works Sign -Off (approval required prior to
scheduling building final)
FINAL
Parking — 2 off street parking spaces required
House Numbers — 5" minimum
Plumbing
Mechanical/Heating
Vapor Barrier Paint Certificate
Insulation Certificate
Smoke Detectors
Final — Building
Call 48 hours before you dig for utility line locates
1- 800 - 424 -5555
Page 3 of 4
Permit #BLD06 -003
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's
registration number and a City business license. Failure to provide proof of this documentation prior
to work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESL) measures shall be installed on -site and inspected
prior to beginning construction; call 385 -2294. Measures shall include installation of silt fencing and
graveled construction entrance (see attached details). Adjacent rights -of -way shall be kept free of dirt
debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic
sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once
construction is complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by
required inspections.
5. Re- inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 385 -2294. A
minimum of twenty -four hours notice is required Public Works approval must be received prior to
scheduling the Building Department's final inspection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for a non-
residential project.
8. All building permits expire if no progress has been made within six months, or if no inspections are
done by the Building Department within one year. Call for at least one inspection per year to keep
your building permit active.
9. Revisions require submittal and approval prior to making changes in the field. Contact the Building
Department (379 -3208) prior to making changes to the approved plans.
10. POST THIS PERMIT ON -SITE WITH THE APPROVED PLANS.
DATE
Call 48 hours before you dig for utility line locates
1- 800 - 424 -5555
Page 4 of 4
Waterman & Katz Building
181 Quincy Street, Suite 301
Port Townsend, WA 98368
Phone: (360) 379 -3208 Fax: (360) 385 -7675
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
For Next Day Inspection Call 385 -2294 Before 3P.M.
Permit Number: BLD06- 003R -1 Issued: 02/06/2006 Parcel Number: 968 -500 -018
Job Address: 4054 Holcomb St. Zoning: R -II Type: V -B Occupancy: U
Nature of Work: Construct detached garage
Owners: Troy Frutiger
Contractor: Owner
NOTE: OUTDOOR CONSTRUCTION ON SITE SHALL BE LIMITED TO HOURS
OF 8 A.M. TO 6 P.M. MONDAY THROUGH FRIDAY, AND PROHIBITED ON
SATURDAYS, SUNDAYS, AND NATIONAL HOLIDAYS. ANY EXCEPTIONS
MADE NECESSARY BY SPECIAL AND UNUSUAL CIRCUMSTANCES MUST BE
APPROVED IN ADVANCE BY THE BUILDING OFFICIAL.
GENERAL CONDITIONS APPLY — SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Electrical — Contact Labor & Industries @ 360 - 417 -2702
* ** All elements of engineering including holdowns, framing, nailing and other engineering connections
require inspection prior to cover. * * *
RF(IITIRFn INSPFCTInNS
APPROVED/DATE
TEMP EROSION & SEDIMENT CONTROL
See General Condition No. 2
Silt Fence as needed
Drive Off Mat to restrict sediment from leaving the site
FOOTINGS
Setbacks
Footings
Forms
Reinforcement
Holdowns MUST BE TIED IN PLACE
NO WET STICKING
Anchor Bolts & Washers
Call 48 hours before you dig for utility line locates
1- 800 - 424 -5555
Page 1 of 3
Permit #BLD06- 003R -1
EXTERIOR BRACED WALL PANELS (MUST BE
INSPECTED PRIOR TO COVERING)
FRAMING — all members and connections require inspection
prior to cover
Fasteners hangers etc. in contact with treated material must be
hot dipped galvanized
Walls
Headers
Rafters (hurricane clips)
Joists (hangers)
Blocking
Roof Venting — eave and ridge vents
Fire Blocking
Weather Resistive Barrier
PUBLIC WORKS FINAL
Public Works Sign -Off (approval required prior to
schedulin,a buildino final)
FINAL
Parking — 2 off street parking spaces required
House Numbers — 5" minimum
Plumbing
Mechanical /Heating
Vapor Barrier Paint Certificate
Insulation Certificate
Smoke Detectors
Final — Building
Call 48 hours before you dig for utility line locates
1- 800 - 424 -5555
Page 2 of 3
Permit #BLD06- 003R -1
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's
rellistration number and a City business license. Failure to provide proof of this documentation prior
to work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on -site and inspected
prior to beginning construction; call 385 -2294. Measures shall include installation of silt fencing and
graveled construction entrance (see attached details). Adjacent rights -of -way shall be kept free of dirt
debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic
sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once
construction is complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by
required inspections.
5. Re- inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 385 -2294. A_
minimum of twenty -four hours notice is required. Public Works approval must be received prior to
scheduling the Building Department's final inspection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for a non-
residential project.
8. All building permits expire if no progress has been made within six months, or if no inspections are
done by the Building Department within one year. Call for at least one inspection per year to keep
your building permit active.
9. Revisions require submittal and approval prior to making changes in the field. Contact the Building
Department (379 -3208) prior to making changes to the approved plans.
10. POST THIS PERMIT ON -SITE WITH THE APPROVED PLANS.
Call 48 hours before you dig for utility line locates
1 -800- 424 -5555
Page 3 of 3
DA
E
Call 48 hours before you dig for utility line locates
1 -800- 424 -5555
Page 3 of 3
Lynnesfield PUD (File No. 9404 -10)
pro pet Use & Development Agreement
page 8.6f 17 -' ✓
Outdoor construction on the site shall be limited to the hours of 8 a.m to 6 p.m. Monday
through Friday, and prohibited on Saturdays, Sundays, and national hohdays. Any
exceptions made necessary by special and unusual circumstances must be approved in
ahvance by the Budding Official.',.,,
25. If archeological/historical resources are discovered during excavation, work shall be
stopped and the State historic Preservation Officer contacted immediately. "Work shall
not resume until approval is obtained from the Director of Building and Community
Development.
PRIOR TO FINAL PLAT FOR EACH PHASE
s, the PUD must be in
27. Prior to issuance of the final plat and any subsequent building Permit
- fi - compliance with all mitigation measures identified in the MDNS (Exhibit PUDA -3)
which are applicable at the time of issuance of said permit. Mitigation includes
infrastructure and traffic improvements both on and off site as specified herein.
28. To provide for fire sup ression service in the area, the Fire Chief shall review site
PP
improvements for consistency with the Uniform Fire Code (UFC). Consistent with the
UFC, dead -end fire apparatus access roads in excess of 150 feet in length will be provided
-- with approved turn- arounds for fire apparatus.
29. The Developer shall construct the on -site and off -site sewer and water system
improvements in conformity with the phased development scheme (Exhibit PUDA 4)as
shown in the Preliminary Water System (Exhibit PUDA -11), and Preliminary Sanitary
Sewer System PUDA -12. Upon conditional acceptance (Le., "substantial completion ") by
the Director of Public. Works, these improvements shall be conveyed to; and accepted by
the I City in a.form as approved by the City Attorney. The Developer may propose minor
variations which may be,required due to topographic or other conditions later discovered
and which allow better construction methods than would be possible through strict
adherence to the phased development scheme. Developer proposed mmor variations
which are specifically approved by the Department of Public Works may be allowed. For
each phase, drainage facilities and utili ty improvements shall be field inspected and
approved by the City. All utilities to be placed underground shall be. made available to the
Public Works Department for inspection, standard testing and approval prior to
----- backfilling;
30. The developer shall construct the on -site and off -site street and circulation improvements
m conformity with the phased development scheme shown in Preliminary Phasing Ma,
Exhibit PUDA -4'and Site Plan, Exhibit PUDA 2.
MAXIMUM HOUSING
4 g 16
DENSITY (units per (10,000 sf of lot area (5,000 sf of lot area (2,500 sf of lot area (1,666 sf oflotazeaper
40,000 square foot area) per unit) per unit) per unit) unit)
_ 17
MINIMUM AVERAGE — — (not more than 2,352 sf
HOUSING DENSITY of lot area per unit)
(units per 40,000 square
foot area)
10,000 sf = single-
5,000 sf = single-
3,000 sf = single - ..
—
family detached
family detached
family attached and
MINIMUM LOT SIZE
detached; and 10,000'
sf = multifamily
50'
30' except: 100'=
—
LOT
50'
WIDTH
multifamily
2.0' except: 50' =barns ;1
' except: 50 =barns
20' except:10' w/ side
20' except. 10', w/ side
and' agricultural
and agricultural
or rear parking; no
or rear parking; no
I
buildings
buildings ��
setback' for 'setback
multifamily structures
for
multifamily structures
MINIMUM FRONT
t
located within, 200
located within 200 feet
YARD SETBACKS
feet of an abutting
of an abutting mixed
t
mixed use zoning
use zoning district
district'
`exce t: 100'=
P
urns
10' except: no setback
multifamily
15' except: 20' if.
directly abutting an R-
20' except: 50' =barns
and agricultural
and agricultural
for
structures located -
Lor R -II district; no
REAR_
buildings, and 100' if
a R -II, R -III,
buildings
within 20Q feet of an _
setback for
MINIMUM
YARD SETBACKS -
abutting
or-R -TV zoning .``
abutting mixed use
multifamily structures
located within 200 feet
district .''
zoning district
of an abutting mixed
use zoning district
f except. 10' =
5' except: 10' = along
no
15' except: 20' if
directly abutting an R-
5` except 10' =
-
abutting a street
r =o -w; 50'= barns and
abutting a street
r -o -w; 100'= barns
a street r -o-w;
setback for : j
I orR -II district; no
MINIMUM SIDE
'agricultural buildings
and agricultural
multifamily structures
located within,200
setback for
multifamily structures
YARD SETBACKS :
° and 100' if,abutting a
buildings
feet of an abutting
located within 200 feet
R -II, R =III, or.R -TV
mixed use zoning.
of an abutting mixed
zoning district
district
use zoning district '
30'
35
35
MAXIMUM
30'.
BUILDING HEIGHT
M LOT
25%
35% %
n �� C t` i���.
45%
50%
COVERAGE'
Front = 4; side
Front = 4 ;side 8 ;
Front = 4';, side
Front -,4'; side _78%
FENCE
side abutting a public
side abutting a public
side abutting a public
side abutting:a public
HEIGHT
r- o -w'.= 4 ; rear ; 8'
r -o -w _ 4'; rear = 8'
r -o -w = 4'; rear = 8'
r -o -w = 4% rear = 8'
(Ord: 2571 § 2, 1997,).
<... _
17 -43
(Revised 7/97)