HomeMy WebLinkAboutCity of Port Townsend/Puget Sound EnergyAttn: KUw Department
6522 KITSAP WAY
BREMERTON, WA 98312
EASEMENT
(Customer form)
REFERENCE M
GRANTOR:
GRANTEE: PUGET SOUND ENERGY, INC.
SHORT LEGAL: see full legal on page _
ASSESSOR'S PROPERTY TAX PARCEL:
OP or U MAP NO: 3001WO03 JOB NO: 105033431 FILE: City Hall Annex
For and in consideration of One Dollar ($1.00) and other valuable consideration in hand paid,
0 P ort j owv,s.cnci
( "Grantor" herein), its successors and assigns hereby conveys and warrants to PUGET SOUND ENERGY,
INC., a Washington Corporation ( "Grantee" herein), its successors and assigns for the purposes hereinafter set
forth, a nonexclusive perpetual easement over, under, along, across and through the following described real
property ( "Property" herein) in TBffecson County, Washington:
SEE EXHIBIT "A" ATTACHED HERETO AND BY THIS REFERENCE MADE A PART HEREOF.
EASEMENT LOCATION: Except as may be otherwise set forth herein, Grantee's rights shall be exercised upon
that portion of the Property (the "Easement Area" herein) that is ten (10) feet in width having five (5) feet of such
width on each side of the centerline of Grantee's systems located as constructed or to be constructed, extended or
relocated on the Property, except those portions of the Property occupied by existing building footings,
foundations, and /or subsurface structures.
1. Purpose. Grantee shall have the right to use the Easement Area to construct, operate, maintain, repair,
replace, improve, remove, and enlarge one or more utility systems for purposes of transmission, distribution and
sale of gas and electricity. Together with the right of access over and across said Property to enable Grantee to
exercise its rights hereunder. As used herein, the term "systems" shall include all appurtenances and facilities as
are necessary in the judgment of Grantee F...
�....y.,,,, ��ca"cc, w� the operation and maintenance Of said Systems.
2. Grantor's Use of Easement Area. Grantor agrees not to erect any structures on said Easement Area, and
further agrees not to place trees, rockeries, fences or other obstructions on the Property that would interfere with
the exercise of Grantee's rights herein.
DATED this 6 T day of rr1_e- c}— 2004.
GRANTOR: BY: NOTE: SIGNATURES ARE REQUIRED OF
ALL CO -OWNERS OF PROPERTY
M
APPROVED AS TO FORM
STATE OF WASHINGTON )
)SS
COUNTY OF OFFICE OF CITY ATTORNEY
On this f6j day ofGtiC 200 efore e, a NPto► gton,
duly commissioned and sworn, personally appeared �AVIG� %i=r "5'
tom known to be the individual(s)/ who executed the within and foregoing instrument, and acknowledged that
—� signed the same as h; S free and voluntary act and deed for the uses and purposed therein
mentioned.
GIVEN under my
Notary seal, text
NoTARr
0p WA
fill,11111111
seal this hereto affixed the day and year in this certificate first above written.
i�
i
S1�e i la J��ars
(Print or stamp name of Notary)
NOTARY PU LI and for the Stat of Washington,
S�
residing at _ ��rf�`r �dGf�►
0��� My appointment expires_ G1 Qo05�
PSE ELECTRICAL FACILITIES
CUSTOMER SERVICE AGREEMENT AND GRADE LETTER
FOR OPERATING RIGHTS, EXCAVATION & FINAL GRADE CERTIFICATION
OPERATING RIGHTS
Upon Owner /Representative and /or Developer (Developer herein) signature below, Puget Sound Energy
(PSE herein) shall have the right to construct, operate, maintain, repair, replace, enlarge and extend its
electrical facilities to be located on Developer's property. Developer agrees to maintain a minimum of five
feet of clearance between the electrical facilities and buildings or other improvements on Developer's
property as required by PSE's Standards. If it is determined by PSE that a recordable easement on
Developer's property or other property is necessary, it shall be the Developer's responsibility to obtain such
easements in a form acceptable to PSE.
As a condition of receiving electrical service for your project, when you provide the excavation for PSE's
electrical facilities, outlined below are some of the requirements and conditions associated with your
excavation work. If you need additional information, please call the PSE contact person listed below.
EXCAVATION REQUIREMENTS
1. Developer is responsible for acquiring utility locates by calling One -Call, 1- 800 - 424 -5555 (except
in Kitsap Co. which is 1- 800 - 553 -4344) at least 48 hours (two full working week days) prior to
digging. The excavation must meet the requirements of the Washington Administrative Code
and Safety Standards.
2. Developer shall call the PSE contact person noted below for trench and route approval prior to
starting excavation.
3. Developer is responsible for any damages caused to utilities by improper back -fill and
compaction. The electrical primary trench must be between 36" and 48" deep. The electrical
service trench shall be 24" deep. All trenching and back -fill must be free of sharp objects and
construction debris. If required, Developer shall provide sand bedding and cover material on
site as instructed by PSE's Contact Person. A 12" lateral separation is required between PSE
electrical facilities and other utilities.
4. There must be a 12' wide unobstructed area beside the trench to provide access for equipment
and materials.
5. The vault excavation dimensions are noted on the attached work sketch. Vault holes must have
a solid level bottom with a minimum 6" crushed (5/8 minus) rock bedding.
6. Developer shall provide the excavation for PSE electrical facilities within the designed location.
Developer shall provide final grade and staking of property lines prior to installation of PSE's
electrical facilities.
7. Developer will be financially responsible for the relocation of PSE's electrical facilities and /or
any damages resulting from dig4ns due to changes or variations in grade that are made after
the installation of PSE's electrical facilities.
FINAL GRADE CERTIFICATION
By my signing below, I certify that the electrical facilities work area shall be at final grade prior to
excavation. I assume full responsibility for my excavation work and the resulting location of these facilities.
Also, 1 agree to indemnify, defend and hold harmless Puget Sound Energy from all liability arising out of, or
in connection with my work, including but not limited to all claims, losses, damages, and expenses,
including reasonable attorney's fees, which result from my failure to excavate within easement areas or
rights -of -way, or from digging without adequate rights on adjoining properties.
Date: January 13, 2005 Project Name Ci of ort fo nsqAd
Owner/ Developer: City of Port Townsend
Project Address:
PSE Service Order #:
(Signature) t (Date)
250 Madison St, Port Townsend
105033431
Grade Letter- Electrical (form number)
Project Manager Tom McDowell
x
T
-MM
CL X
X
r rl.
MI.
z
0
o
0
M < 3
M
rn
-loz
OZ
W
>
C-
Mm M
z
o
0 a
12
----- -----
2 S!
l
L-j A E3 --4
C
;Dz
El -n AO
ti z
5i
x
T
CL X
r_
r rl.
MI.
M
0
M < 3
Rl
t4� 0
1
rn
-loz
OZ
W
> M
t=p
JUMM-D
x 0
0 C,
o rq r3 rr-
C4 :1 -1 -1
o
0 a
12
----- -----
x
L 0
!j
IT)
is i
ii
r
r
I 00W r--, .3.
-4 --1
z z zM
CID
AP
Le
z it Fq
r- MR,
2
C3
r4m l ao
r<
X r1l
CL X
r_
0 2. cn
MI.
M
0
M < 3
Rl
t4� 0
1
am 0
=.a
-loz
OZ
W
> M
t=p
JUMM-D
x 0
0 C,
o rq r3 rr-
C4 :1 -1 -1
o
0 a
12
----- -----
L 0
!j
IT)
is i
ii
r
r
I 00W r--, .3.
-4 --1
z z zM
CID
AP
Le
z it Fq
r- MR,
2
C3
r4m l ao
r<
X r1l
K 1. TO MWAMAM) BE JM
IN c4MM66T K 1. C.
RL 0
0
cl; :01 2
9 R
Q 0
co (D
D.-
A
0
0
0
-j
10
/ A
NL
J
...... -----
M LK
/ A