HomeMy WebLinkAbout12-003 Contract Authorization Taylor Street Tunnel Lids Resolution 12-003 Page I of 2 RESOLUTION NO. 12-003 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PORT TOWNSEND AUTHORIZING THE CITY MANAGER TO AWARD AND SIGN ALL CONTRACTS FOR THE CONSTRUCTION OF THE TAYLOR STREET TUNNEL LIDS AND REVISE THE PROJECT ALLOCATIONS CONTAINED IN THE CAPITAL INITIATIVE PLAN FOR 2012 FOR THE SIDEWALK LID AND UTILITY IMPROVEMENT PROJECT WHEREAS, on December 5, 2011, City Council authorized the City Manager to include in the bid package for the Sidewalk Lid and Utility Improvement Project the supplemental items presented at the December 5, 2011 City Council Meeting; and WHEREAS, the city staff at the City Council December 5, 2011 identified priorities for the supplemental work which are not funded under the Federal Emergency Management Agency (FEMA) Grants, DR-1734 and DR-1825; and WHEREAS, City Council comments on December 5, 2011 indicated a preference to include additional, supplemental items in the scope of the project—namely, underground utilities, other capital repairs and improvements (non-structural sidewalks, crossings, intersection, paving), and street scope (street furniture, parking improvements landscaping, design features)—if funding was available. Since the overall project cost, with any supplemental items, would not be known until costs are defined in the bidding process, it makes sense to seek bids for the supplemental items and then review funding availability and options as part of a final decision by the City Council on the scope of the project to award and construct. WHEREAS, following the bid opening on January 27, 2012, the City Council reviewed the lowest responsible bidder and authorized the funding of the entire Sidewalk Tunnel Lid and Utility Improvement Project; and WHEREAS, City Council authorizes city staff to prepare a supplemental budget, re- appropriation of funds, re-draft of CIP or any combination of the above which reflects the amended CIP summary presented at the January 30, 2012 City Council Meeting; and NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Port Townsend as follows: The City Council of Port Townsend authorizes the City Manager to award the construction contract to the lowest responsible bidder per the results from the bid opening on Friday, January 27, 2012, and to award and sign all contracts for the Taylor Street Tunnel Lids. Also this resolution authorizes the City Manager to revise the project allocations contained in the Capital Initiative Plan for 2012 to fund the entire Sidewalk Tunnel Lid and Utility Improvement Project and return to Council with the necessary budget adjustment actions. Resolution 12-003 Page 2 of 2 ADOPTED by the City.Council of the City of Port Townsend at a regular meeting thereof, held this 30th day of January 2012. D id King, Mayor Attest: Approved as to form: Pamela Kolacy, MMC °� John Watts City Clerk City Attorney City of Port Townsend Project Cost Summary WO#1065 and 1070 Sidewalk Lid and Utility Improvement Project Attachment 1 FEMA-1734-15-R FEMA-1825-14-R Funding Engineers Estimated Engineers Estimated Apparent Low Bidder Difference Source Total Project Cost Construction Cost Construction Cost FEMA $ 2,812,561.21 $ 1,549,492.17 $ 1,495,660.00 $ 53,832.17 Non-FEMA $ 1,362,147.19 $ 507,366.08 $ 461,437.05 $ 45,929.03 Total $ 4,174,708.40 $ 2,056,858.25 $ 1,957,097.05 $ 99,761.20 * Note-Even though the apparent low bidder construction cost is below the engineer's estimate cost staff recommends to reserve the difference in amounts as contingency for the project. \\CITYGIS\PWEngineering\Transportation\Sidewalk&Tunnel Lid Project\Finance\120119 Cost Estimate 1/27/2012 Attachment 2 Project Funding Analysis Sidewalk Lid and Utility Improvement Project Funding Engineer's Estimated Sewer& Obligated Funding Project Element Total Project Cost FEMA Stormwater 2010 Bond Gap FEMA $2,812,561 $2,258,517 $322,605 $231,439 City(non-FEMA) $1,362,147 $164,000 $1,198,147 Tota 1 $4,174,708 $1,429,586 1/27/2012 Attachment 3 Projects in 2008 and 2010 Bonds Not Completed or Encumbered (Available for reallocation) Project 2008 2010 1 Other Total Project Grant Bond Bond Funding Cost source Projects in Bond that match other grants( not recommended for reallocation): Way Finding $ 224,000 $ 200,000 $ 424,000 Pr.Amer. Library Seismic $ 280,000 $ 550,000 $ 830,000 FEMA Sheridan at Hospital $ 100,000 $ 110,000 $ 210,000 TIB Hastings Ave Sidewalk $ 100,000 $ 258,825 $ 358,825 WSDOT $ 704,000 $ 1,118,825 $ 1,822,825 Proiects in bond that do not match other grants (Recommend for realloc $ - Esplanade Phase 2 $ 200,000 $ 300,000 $ - $ 500,000 Broadband&wireless $ 400,000 $ 400,000 Sheridan Phase II $ 100,000 $ 100,000 Landes Sidewalk $ 135,900 $ 135,900 Howard Street $ 425,000 $ - $ 425,000 $ 200,000 $ 1,360,900 $ 1,560,900 Projects in the bond that are completed or encumbered include: Bell tower; Library Expansion Design Development; 1/27/2012 Attachment 4 2012 Budget Adjustment Changes needed for Adopted 2012 Capital Budget FEMA Tunnel Lid and Taylor Street Project (WO 1065 & 1070) Engineer's Estimated Total Projecft Cost FEMA Portion $2,812,561 City Portion $1,362,147 Total $4,174,708 Amount Spent in 2011 $788,434 Amount already in 2012 Budget Street Capital Budget $1,730,000 Sewer and Stormwater $164,000 2012 CIP Budget Amendment Needed $1,492,274 1/27/2012