Loading...
HomeMy WebLinkAbout11-032 Design and Streetscape Improvements and Construction of Downtown Sidewalk Tunnel Lid Replacement Resolution 11-032 Page 1 of 2 RESOLUTION NO. 11-032 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PORT TOWNSEND AUTHORIZING THE CITY MANAGER TO COMPLETE THE DESIGN AND STREETSCAPE IMPROVEMENTS AS PROPOSED AND PROCEED TO ADVERTISE THE BID FOR THE CONSTRUCTION OF THE DOWNTOWN SIDEWALK TUNNEL LID REPLACEMENT PROJECT WHEREAS, the City of Port Townsend applied for and received three FEMA Hazard Mitigation Grants for the seismic rehabilitation of the sidewalk and tunnel lids under Water Street, Taylor Street and the adjacent streets; and WHEREAS, the City Council recognizes the importance of safety and the rehabilitation of the sidewalks and tunnel lids in the Historic Downtown area as well as the long-term economic benefits of streetscape improvements; and WHEREAS, on February 7, 2011 the City Council authorized the contract with Shea Carr Jewell Inc. for field survey, geotechnical and structural investigation, project development, and preliminary design of the Downtown Sidewalk Tunnel Lid Replacement Project; and WHEREAS, the field investigations by Shea Carr Jewell identified that Taylor Street has a large proportion of tunnel lids that must be replaced; and WHEREAS, city staff and project consultants are entering into the detailed design and bid document preparation phase the Downtown sidewalk Tunnel Lid Replacement Project; and WHEREAS, based on FEMA grant expiration dates and business owner feedback, the desirable construction window is February through June 2012; and WHEREAS, it is the desire of the City Council to move forward with this project construction in the most expedient manner; and WHEREAS, to meet the project schedule, the City will solicit bids in early January in conformance with City and State public works bid laws in a fair and timely fashion. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Port Townsend as follows: The City Council of Port Townsend authorizes the City Manager to complete the design and streetscape improvements as proposed and to proceed to advertise the bid for the construction of the Downtown Sidewalk Tunnel Lid Replacement Project. Resolution 11-032 Page 2 of 2 ADOPTED by the City Council of the City of Port Townsend at a regular meeting thereof, held this 7 I day of November 2011. Michelle Sandoval, Mayor Attest: Approved as to form: Pamela Kolacy, MMC John Watts City Clerk City Attorney