HomeMy WebLinkAbout10-035 Public Works and Development Services FeesResolution No. 10-035
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PORT
TOWNSEND PROVIDING FOR PUBLIC WORKS DEPARTMENT AND
LAND DEVELOPMENT PERMIT APPLICATION AND APPEAL FEES
WHEREAS, the City Council of the City of Port Townsend, on recommendation of the
City Manager, City DSD Director, AND City Public Works Director, determines it appropriate to
update fees established in Resolution 06-037 (approved January 2, 2007) and add fees for various
applications and permits as set forth in Exhibit A (attached hereto and incorporated by reference).
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Port
Townsend as follows:
Effective January 1, 2011, the fees for various applications and permits as set forth in
Exhibits A, B, and C (attached hereto and incorporated by reference) are hereby
established. Changes from fees adopted in Resolution 06-037 (approved January 2, 2007)
and fees formerly in PTMC 3.36.020 are shown in strikeout and double underline
(strikeout is deleted, double underlined is added) on the attached exhibits.
ADOPTED by the City Council of the City of Port Townsend at a regular meeting
thereof, held this 15th day of November 2010.
Attest:
~ ~
,,~~,, / ~.- ,_
Pamela Kolacy, MMC
City Clerk
i^
~iC-{~f~
Michelle Sandoval, Mayor
Approved as to form:
John P. Watts
City Attorney
Exhibit A to Resolution 10-035
Page 1 of 9
Exhibit A
DEVELOPMENT SERVICES FEE SCHEDULE
Building Permit Fees
The fees for building permits shall be based upon the valuation of the project and shall be assessed in accordance
with the following table:
Total Valuation* Fee
$1.00 to $500 $23.50
$501 to $2,000 $23.50 for the first $500 plus $3.05 for each additional $100 or fraction
thereof, to and including $2,000
$2,001 to $25,000 $69.25 for the first $2,000 plus $14.00 for each additional $1,000 or
fraction thereof, to and including $25,000
$25,001 to $50,000 $391.25 for the first $25,000 plus $10.10 for each additional $1,000 or
fraction thereof, to and including $50,000
$50,001 to $100,000 $643.75 for the first $50,000 plus $7.00 for each additional $1,000 or
fraction thereof, to and including $100,000
$100,001 to $500,000 $993.75 for the first $100,000 plus $5.60 for each additional $1,000 or
fraction there, to and including $500,000
$500,001 to $1,000,000 $3,233.75 for the first $500,000 plus $4.75 for each additional $1,000 or
fraction thereof, to and including $1,000,000
$1,000,001 and up $5,608.75 for the first $1,000,000 plus $3.65 for each additional $1,000
or fraction thereof
Other Fees
1. Inspections outside of normal business hours (minimum two hour charge) ................................. $50 per hour
2. Reinspection fees ......................................................................................................................... $50 per hour
3. Inspections for which no fee is specifically indicated ................................................................. $50 per hour
4. Additional plan review required by changes, additions or revisions to approved
plans ......................................................................................................... $50 per hour -half hour minimum
5. For the use of outside consultants for plan checking or inspection .............................................. Actual Cost
* Total valuation shall be determined by the Building Official in accordance with nationally accepted standards.
The listing of per unit valuations presented in Exhibit B shall be used for normal construction projects. For
unusual projects that are not specifically listed, national construction estimating tools such as the Building
Construction Cost Data by R.S. Means, the BNi Construction Costbook or the Marshall & Swift Handbook
shall be used as a guide for determination of valuation.
6. Stop Work Order ........................................................................................................................ $50.00
A minimum fee of $50.00 will be assessed to any permit associated with a stop work order.
Building Plan Review Fees
Plan review fees shall be 65% of the building permit fee with a minimum plan review fee of ........................ $50.00
Exhibit A to Resolution 10-035
Page 2 of 9
Building Permit Misc. Fees
Demolition permit ..................................................................................................................................... $100.00
Re-roof (R-3 and U occupancies) ............................................................................................................. $50.00
Others by valuation and fee table
Mobile home permit -Single wide ........................................................................................................... $125.00
Double wide ............................................................................................................................... $175.00
Mechanical Permit Fees
New residential as part of a combo building permit shall be charged a flat fee of
Ter dwelling unit of a duplex or condo) ......................................................................................................... $150.00
For all other projects the fee for issuance of a mechanical permit shall be based
upon the equipment installed, in accordance with the following:
Base fee for issuance of each permit ................................................................................................................ $30.00
Unit schedule (in addition to base fee):
Furnaces. For the installation or relocation of each forced air or gravity-
type furnace or burner, including ducts and vents attached to such
appliance, up to and including 100,000 Btu/h ............................................................................. $17.00
For the installation or relocation of each forced air or gravity-type
Furnace or burner, including ducts and vents attached to such
appliance over 100,000 Btu/h ...................................................................................................... $21.00
For the installation or relocation of each floor furnace, including vent ....................................... $17.00
For the installation or relocation of each suspended heater, recessed
wall heater, or floor mounted unit heater ..................................................................................... $17.00
2. Appliance Vents. For the installation, relocation, or replacement of
each appliance vent installed and not included in an appliance permit ....................................... $10.00
3. Repairs and Additions. For the repair of, alteration of, or addition to each
heating appliance, refrigeration unit, cooling unit absorption unit, or each
heating, cooling, absorption or evaporation cooling system, including
installation of controls regulated by the Mechanical Code ......................................................... $16.00
4. Boilers, Compressors, and Absorption Systems. For the installation or relocation
of each boiler or compressor up to and including 3 horsepower or for each
absorption system to and including 100,000 Btu/h ...................................................................... $17.00
For the installation or relocation of each boiler or compressor over 3
horsepower to and including 15 horsepower or for each absorption
system over 100,000 Btu/h to and including 500,000 Btu/h ........................................................ $30.00
For the installation or relocation of each boiler or compressor over 15
horsepower to and including 30 horsepower, or for each absorption
system over 500,000 Btu/h to and including 1,000,000 Btu/h ..................................................... $40.00
Exhibit A to Resolution 10-035
Page 3 of 9
For the installation or relocation of each boiler or compressor over 30
horsepower to and including 50 horsepower, or for each absorption
system over 1,000,000 Btu/h to and including 1,750,000 Btu/h .................................................. $60.00
For the installation or relocation of each boiler or compressor over 50 horsepower,
or for each absorption system over 1,750,000 Btu/h .................................................................. $115.00
5. Ductless Heat Pump. For the installation of each ductless heat pump ........................................ $17.00
6. Air Handlers. For each air-handling unit to and including 10,000 cubic feet per minute ......... $13.00
7. Evaporative Coolers. For each evaporative cooler other than the portable
type .............................................................................................................................................. $13.00
8. Ventilation and Exhaust. For each ventilation fan connected to a
single duct ................................................................................................................................... $10.00
For each ventilation system which is not a portion of a heating or
air-conditioning system authorized by a permit ........................................................................... $13.00
For the installation of each hood which is served by a mechanical
exhaust, including the ducts for such a hood ............................................................................... $13.00
9. Incinerator. For the installation or relocation of each domestic type
incinerator .................................................................................................................................... $21.00
For the installation or relocation of each commercial or industrial type
Incinerator ................................................................................................................................... $71.00
10. Hot Water Heater. For installation of gas fired hot water heater
and ventilation system ................................................................................................................. $15.00
11. Miscellaneous. For each appliance or piece of equipment regulated
by the Mechanical Code but not classed in other appliance categories,
or for which no other fee is listed in the Code ............................................................................. $13.00
When Appendix B, Chapter 13, is applicable (See Section 103), permit
fees for fuel gas piping shall be as follows:
For each gas piping system of one to four outlets ................................................................ $9.00
For each gas piping system additional outlets over 5, each .................................................. $3.00
When Appendix B, Chapter 14, is applicable (See Section 103) permit
fees for process piping shall be as follows:
For each hazardous process piping system (HPP) on one to four outlets ............................. $7.00
For each piping system of five or more outlets, per outlet ................................................... $2.00
For each non hazardous process piping system (NPP) of one to four outlets ....................... $4.00
For each piping system of five or more outlets, per outlet ................................................... $1.00
Other Inspection and Fees
1. A plan review fee of 25% of the permit fee shall be assessed for other than
R-3 and U occupancies with a minimum plan review fee of ....................................................... $50.00
2. Inspection fees outside business hours, per hour ......................................................................... $50.00
Exhibit A to Resolution 10-035
Page 4 of 9
3. Reinspection fees assessed under provisions of Section 116.6, per
inspection .................................................................................................................................... $50.00
4. Inspection for which no fee is specifically indicated (minimum
charge -one half hour) ................................................................................................................ $50.00
5. Additional plan review required by changes, additions, or revisions
to approved plans (minimum charge -one half hour) ................................................................. $50.00
Plumbins Permit Fees
New residential as part of a combo building permit shall be charged a flat fee (per dwelling unit of a duplex or
condo) ......................................................................................................................................................... $150.00
For all other projects the fee for issuance of a mechanical permit shall be based upon the equipment installed, in
accordance with the following:
Base fee for issuance of each permit ................................................................................................................. $30.00
Unit schedule (in addition to base fee):
1. For each plumbing fixture or trap or set of fixtures on one trap
(including water, drainage, piping and backflow prevention therefore) ............................................ $12.00
2. For each building sewer .................................................................................................................... $27.00
3. Rainwater systems -per drain (inside building) ................................................................................ $12.00
4. For each electric water heater ............................................................................................................ $15.00
5. For each industrial waste pre-treatment interceptor including its trap and vent, excepting kitchen
type grease interceptors functioning as fixture traps ......................................................................... $25.00
6. For installation, alteration or repair of water piping and/or water treating
equipment, each ................................................................................................................................. $10.00
7. For repair or alteration of drainage or vent piping, each fixture ........................................................ $10.00
8. For atmospheric type vacuum breakers not included in item 1
1 to 5 .................................................................................................................................................. $15.00
over 5, each ........................................................................................................................................ $4.00
9. For each backflow protective device other than atmospheric type vacuum breakers:
2 inches and smaller .......................................................................................................................... $15.00
Over 2 inches ..................................................................................................................................... $28.00
Other fees:
1. A plan review fee of 25% of the permit fee shall be assessed for other than
R-3 and U occupancies with a minimum plan review fee of .............................................................. $60.00
2. Inspection fee outside of business hours, per hour ............................................................................. $50.00
3. Reinspection fees per inspection ........................................................................................................ $50.00
4. Inspections for which no fee is specifically indicated, per hour (min. of/z hour) ............................. $50.00
5. Additional plan review required by changes, additions, or revisions to approved plans ................... $50.00
Ener~y Code Fees
An energy code fee shall be assessed to review and inspect projects for compliance with the provisions of the
Washington State Energy Code and Indoor and Air Quality Code (WAC 51-11 & 51-13).
1. For new single-family unit ................................................................................................................ $100.00
2. Residential Remodel/Addition ............................................................................................................ $50.00
Exhibit A to Resolution 10-035
Page 5 of 9
3. New Commercial or Multi-Family building
0 - 2,000 sq. ft. gross floor area ......................................................................................... $200.00
2,001 - 5,000 sq. ft. gross floor area .................................................................................. $400.00
5,001 - 10,000 sq. ft. gross floor area ................................................................................ $600.00
Over 10,000 sq. ft. gross floor area ..................................................................................... $800.00
4. Commercial Remodels, Shell buildings and Tenant Improvements shall be calculated at 50% of the amount
for a New Commercial Building.
5. Warehouses and semi heated structures shall be calculated at 70% of the amount for a New Commercial
building
Grading Permit Fees
Grading Permit Fees (includes plan review)
100 cubic yards or less .............................................................................................................................. $50.00
101 to 1,000 cubic yards ........................................................................................................................... $100.00
1,001 to 10,000 cubic yards ...................................................................................................................... $250.00
Over 10,000 cubic yards ........................................................................................................................... $450.00
Other Inspections and Fees
1. Inspection outside normal business hours (two hour minimum) .................................................... $50.00 per hour
2. Reinspection fees .......................................................................................................................... $50.00 per hour
3. Inspections for which no fee is specifically indicated (1/2 hour minimum) ................................... $50.00 per hour
Fire Code and Fire Prevention Review and Inspection Fees
Site Development
A fee shall be assessed for the review and inspection of fire prevention infrastructure associated with development
projects. This includes but is not limited to; plats, short plats, PUD's, new commercial buildings, residential infills:
Basic fee (for first two hours) ...........................................................................................................$150.00
Additional fee, per hour (over two hours) ......................................................................................... $50.00
Construction Review and Inspection
A fee shall be assessed for the review and inspection of the Fire Code requirements for buildings classified as Group
A, B, E, F, H, I, LC, M, R-1, R-2, and S. The fee shall be 15% of the building permit fee established by the Building
Permit Fee Schedule with a minimum fee of $50.00.
Fire Sprinkler Systems
The fee for fire sprinkler system permits shall be based upon the Building Permit Fee table. The valuation shall be
calculated on the per square foot figure. The listing of per unit valuations presented in Exhibit B shall be used for
typical installations. For unusual projects that are not specifically listed, national construction estimating tools such
as the Building Construction Cost Data by R.S. Means, the Bni Construction Costbook or the Marshall & Swift
Handbook shall be used as a guide for determination of valuation.
The plan review fee for fire sprinkler systems shall be 65% of the permit fee, with a minimum fee of $50.00.
Underground Sprinkler supply (includes review and inspection) ................................................................. $150.00
Fire Alarm Systems
Commercial and Multi-family ..................................................................................... $300.00 plus $5.00 per device
Tenant Improvements .................................................................................................. $150.00 plus $5.00 per device
Residential (one and two family) .................................................................................................................... $100.00
Plan Review fees shall be 65% of the permit fee, with a minimum fee of ....................................................... $50.00
Exhibit A to Resolution 10-035
Page 6 of 9
Type I hood suppression system ..................................................................................................................... $150.00
Land Use Fees
The fees associated with land use and planning services shall be as specified below. Any costs incurred from the
need to use outside consultants shall be in addition to fees listed and are the responsibility of the applicant. For
processes that require a hearing before the Hearings Examiner a base fee of $500.00 is added for Examiner costs. If
the actual cost is less or more the difference will be refunded or billed. Any consultant fee costs or recording fees
incurred shall be billed.
Platting (plus any filing costs)
1. Lots of Record certification
Single lot .................................................................................. ........................................... $100.00
Two to nine lots ....................................................................... ........................................... $200.00
2. Lot Line Adjustment - Type I ................................................................ ........................................... $200.00
3. Lot Line Adjustment -Type II ............................................................... .............................................. $300.00
4. Binding Site Plan -Residential ............................................................. ............................................. $300.00
5. Binding Site Plan -Mixed Use/Commercial ........................................... ...........................................$1,000.00
6. Binding Site Plan modification or amendment ...................................... ........................................... $300.00
7. Cottage Housing Development ............................................................... ...........................................$1,500.00
8. Preliminary Short Plat -two lots ............................................................ ........................................... $300.00
Three to nine lots ..................................................................... ...........................................$1,800.00
9. Short Plat Amendment ............................................................................ ........................................... $300.00
10. Preliminary Plat or PUD ........................................................................ ..................... $2,500.00 plus $50/lot
11. Final Short Plat three to nine lots ........................................................... ........................................... $500.00
12. Final Plat or Final PUD .......................................................................... ........................................... $500.00
13. Plat or PUD Amendment/Alteration
Minor ....................................................................................... ........................................... $250.00
Major ....................................................................................... ...........................................$1,250.00
14. Street Vacation ....................................................................................... ........................................... $300.00
Plus the costs of the property appraisal.
Environmental (SEPA)
1. Environmental checklist threshold determination
Minor .................................................................................................................................. $400.00
Major .................................................................................................................................. $800.00
2. Environmental Impact Statement ..................................................................... $500.00 plus consultant costs
3. SEPA addendum ............................................................................................................................... $200.00
Shoreline
1. Shoreline exemption .......................................................................................................................... $125.00
2. Shoreline Substantial Development Permit (plus $50/hour over 10 hours staff time)
Prima $400.00
ry ................................................................................................................................ $500.00
Secondary ............................................................................................................................
Conditional .......................................................................................................................... $600.00
3. Shoreline Variance ............................................................................................................................ $400.00
Exhibit A to Resolution 10-035
Page 7 of 9
Critical Areas
1. Critical Area Permits
Minor .................................................................................................................................. $250.00
Major .................................................................................................................................. $500.00
2. Reasonable Use Exception ................................................................................................................ $250.00
Plus the cost of the Critical Area Permit.
3. Critical Area Waiver ......................................................................................................................... $100.00
4. Advance determination ...................................................................................................................... $100.00
5. Minor Activity .................................................................................................................................. $150.00
Tree Conservation
1. Tree Removal Activity Requiring A Written Exemption .................................................................... $50.00
(PTMC 19.06.070, Article II)
2. Minor Modification To Approved Tree Conservation Permits Or Tree Conservation Plans ............. $75.00
(PTMC 19.06.210)
3. Tree Removal Activity Classified As A Tree Conservation Permit Approval
Affecting 40,000 square feet land area or less .................................................................................... $100.00
Affecting in excess of 40,000 square feet land area but not exceeding five acres .............................. $250.00
Affecting land area of five acres or more ........................................................................................... $500.00
4. Forest Practice Tree Removal Activity ............................................................................................... $50.00
Combined with statement of intent not to convert commercial forest lands (PTMC 19.06.060 E)
Use & Zoning
1. Temporary Use Permit ....................................................................................................................... $80.00
Re-establishment (from prior year without change) ............................................................. $40.00
2. Conditional Use
Minor ................................................................................................................................... $350.00
Major .............................................................................................................................. $1,250.00
Modification .................................................................................................................... $150.00
Plus $50.00 per hour of staff time spent in excess of three hours.
3. Variance
Minor ................................................................................................................................... $350.00
Major .............................................................................................................................. $1,250.00
4. Wireless Facility (per PTMC 17.78)
Type II ................................................................................................................................ $500.00
Type III ..............................................................................................................................$2,250.00
5. Home Occupation ............................................................................................................................. $150.00
Sign Permits ....................................................................................................................... $35.00
Plus an additional $10.00 for each additional sign included in the same permit application. Projecting and
Monument signs require an additional fee of $50.00 for building plan review.
6. Temporary Sign Departure for 1 Sign (15 days or less) ................................................................... $25.00
Plus an additional $5.00 for each additional sign included in the same permit application. A maximum of
seven temporary signs per permit. Plus the cost of the sign permit.
7. Seasonal Temporary Sign Departure for 1 Sign (Up to 9 months) .................................................... $50.00
Plus an additional $10.00 for each additional sign included in the same permit application. A maximum of
seven temporary signs per permit. Plus the cost of the sign permit.
8. Permanent Sign Departure for 1 Sign ................................................................................................ $150.00
Plus an additional $10.00 for each additional sign included in the same permit application. Plus the cost of
the sign permit.
9. Sign Variance ................................................................................................................................... $125.00
10. Pilot Project (Sims Way to Kearney) Annual Fee .............................................................................TBD
Plus the cost of the sign permit.
* Note: All signs in the historic district require design review.
Exhibit A to Resolution 10-035
Page 8 of 9
Plan amendment (base fee plus $50/hour over 10 hours staff time)
1. Comprehensive Plan or subarea plan amendments ......................................................................... $500.00
2. Shoreline Master Program amendments .......................................................................................... $500.00
3. Zoning Code amendments ............................................................................................................. $500.00
Design Review
1. Administrative review .............................................................................. ......................................... $25.00
2. Minor HPC review ................................................................................... ......................................... $50.00
3. Commercial and major HPC .................................................................... ......................................... $500.00
4. Special Valuation
Residential ............................................................................................... .......................................... $100.00
Commercial ............................................................................................. .......................................... $200.00
5. Historic Residential
Pivotal Home ........................................................................................... ..........................................$50.00
Primary Home .......................................................................................... ..........................................$50.00
6. Historic Residential Departure Request
Secondary Home -Type I-A (Staff Review) ........................................... ..........................................$100.00
Secondary Home -Type II (Staff Review) ............................................. ..........................................$100.00
Primary Home -Type I-A (HPC Review) ............................................... ..........................................$125.00
Primary Home -Type II (HPC Review) ................................................. .......................................... $125.00
Pivotal Home -Type I-A (HPC Review) ................................................ .......................................... $150.00
Pivotal Home -Type II (HPC Review) ................................................... .......................................... $150.00
7. Non-Historic Residential Departure Request
New Home -Type I-A (Staff Review) .................................................... .......................................... $100.00
New Home -Type II (Staff Review) ....................................................... ..........................................$100.00
Additional Review
For all land use permits the fee for additional review time due to
changes in approved plans or other applicant initiated changes ....................................... $50.00 per hour
Publication and Notices
The costs associated with public notification that maybe required by a project are assessed as follows:
1. Notice board deposit .......................................................................................................................... $30.00
2. Notice of application publication ..................................................................................................... $150.00
3. Notice of public hearing publication ................................................................................................ $100.00
4. Environmental determination notice publication .............................................................................. $100.00
5. Additional notice and publication required by changes initiated by the applicant ............................ $150.00
6. Mailing costs for notices .................................................................................................................... $75.00
Development Engineering Permit and Inspection Fees
1. Street/Site Development Permit (SDP)
Permit fee .................................................................................................................................. $150.00
Plan Review .................................................................................... $200.00 plus $50/ hour over 4 hours
Inspection Fees ...................................................................................... 2% of Estimated Project Costs*
2. Minor Improvement Permit .............................................................................................................. $100.00
Re-inspection for corrections ....................................................................................... $50.00 per hour
3. Latecomers Agreement Processing Fee ............................................................................................ $200.00
4. Inspection not specifically listed ........................................................................................ $50.00 per hour
5. Plan review for changes to approved plans ......................................................................... $50.00 per hour
* The Engineer of record shall provide a cost estimate
Exhibit A to Resolution 10-035
Page 9 of 9
Administrative
Appeals
1. Appeal of an administrative decision ................................................................................................ $200.00
2. Appeal to Hearings Examiner ........................................................................................................... $500.00
If the actual cost is less or more the difference will be refunded or billed.
Other Fees
1. Pre-Application Conference
Major (Type III) ............................................................................................................................... $250.00
Plus $50.00 per hour of staff time spent in excess of five hours.
( Yl~ ) ............................................................................................................................
Minor T e I, II $150.00
Plus $50.00 per hour of staff time spent in excess of three hours.
2. Technology fee (assessed on all permits) ................... 2% of the permit fee with a minimum charge of $5.00
3. Record Retention fee (assessed on all permits) ........3%of the permit fee with a minimum charge of $3.00
..................................................................................... maximum charge of $10.00
Rounded to the nearest quarter of a dollar per PTMC 2.76.031.
4. Statements of restrictions, zoning compliance letter, assessor letter and similar documents .............. $50.00
5. Request for Director's Interpretation ................................................................................................ $150.00
6. Waiver Request (per item; unless specified elsewhere) ..................................................................... $150.00
7. Preparation of minor legal documents ............................. $65.00 plus $100/hour for any city attorney time.
8. Addressing ........................................................................................................................................ 25.00
Exhibit B to Resolution 10-035
Page 1 of 3
EXHIBIT B
Building Valuation Table
Per square foot costs
Use and Construction T e S . ft. value
A artmetrt Buildin >s -- T ~ e I basement ~~ara e $38.52
A artment Buildin rs - "T • e lA or II3 $1.1.2.48
A artment Buildin«s -- T ~ e V Masonr or III $91.36
A artment Buildin =s - "I` e V Wood Frame $84.46
Banks--T e lAor IB* $152.54
Banks - "I' • e II-A $1 12.37
Banks - T e I I-B $108.77
F3anks - T ~c I I f -A $124.01.
Banks - Ty e III-B $119.58
Banks - T • e V-A $ l 1.2.37
Banks - T - e V-B $107.64
Chw•ches - 'h c 1 A or 1 B $102.18
Churches -- T ~ e II-A $76.74
Churches - T e II-B $72.92
Churches -- T e III-A $83.43
Churches - T c III-I3 $79.72
Churches - Ty e V-A $77.97
Chtrches - T • e V-B $73.34
Comrttercial Deck $10.30
Convalescent Hos itals-'T e 1A or 1B* $143.38
Conva escent Hos itals -- T e II-A $99.50
Convalescent Hos itals - Tv e III-A $$1.01.97
Convalescent I-Ios itals -~-~ T e V-A $96.10
Decks -Residential $7.73
Decks ~--Residential (Covered) $10.30
Desi ned Attic Stora e 'Trusses $1.0.30
Detached Greenhouses $5•IS
Dwellin =s Basements -Finished $95.17
Dwellin s --Basements ---Finished Revision $95.17
Dwellin s-Basements -Semi Finished $47.59
Dwellin 7s -- T e V Mason $99.81
Dwellin<=s -'i' ~ e V Wood Frame $95.17
Dwellin s -- Tv e V Woad Frame Remodel $47.59
Dwellin s-'T e V Wood Frame Revision $95.17
Fences over b' in hei rht $S.1S
Fire Stations - T' e IA or 1B $117.83
Fire Stations -- T e II-A $77.56
;ire Stations - T' e II-B $73.13
Fire Stations --- Tv e III-A $84.87
Fire Stations - •T e Ill-B $81.27
Fire Stations -- T e V-A $79.62
lire Stations - T ~ e V-B $75.50
homes for the Elderl - T e 1 A or 1B $106.81
Homes for the Elderl ~ - T e II-A $86.73
homes for the Elderl --- T ~ e II-B $83.02
Homes for the I'lderl ~ - `Tv e III-A $90.33
I-Tomes for the Elderl -- T e III.-B $86.62
Homes for the Elderl ~ -'C' e V-A $87.24
Exhibit B to Resolution 10-035
Page 2 of 3
Use and Construction T e S . ft. value
I-tomes for the Elderl - T e V-B $84.25
Hos . tats - "T e lA or 113* $168.10
Rios itals --~ T ~ e III-A $139.15
Has itals -'T e V-A $132.77
I-Iatels and. Motels -- T e 1f1 or 1B* $104.03
Hotels and Motels - 7~' e Ifl-A $90.13
Hotels and Motels -- Tv e III-B $8590
Hotels and Motels-'T e V-A $78.49
Motels and. Motels -- T ~ e V-B $76.94
Industrial Plants -'Tilt U $30.90
Industrial Plants -- T e lA or 1B $58.61
industrial Plants - T • e II-A $37.49
Industrial Plat~~ts -- Tv e Il-B $40.79
Industrial Plants - T e III-A $44.91.
Industrial Plants -- T e lII-B $42.33
Industrial Plants - "T - e V-A $42.33
[ndustrial Plaits ~-- Tv e V-B $38.73
Jails-"C • e lA or II3 $163.87
Jails ~-- T e III-A $149.87
Jails-"I' eV,A $1.1.2,37
Libraries -- Tyr e IA or IB $119.89
Libraries - "f' ~ e Ii-A $87.76
Libraries --- Tv e II-B $83.43
Libraries -1' e Ili-A $92.70
Libraries -- TyT e III-B $88.07
Libraries - T ~ e V-A 587.04
Libraries - Tv e V-B $83.43
Manual In ut $0.00
Medical Offices- T ~ e IA or 1 B* $123.09
Medical Offices - Tv e II-A $94.97
Medical Offices--- T ~ e Il-B $90.23
Medical Offices - T ~ e III-A $103.00
:Medical Offices -- T ~ e III-B $95.89
Medical Offices- "f ~ e V-A $92.91
Medical Offices --- T e V-B $89.61
New Roof Structure $9•2J
Office Partitions $4Ci.35
Offices-'T e l A or l B* $110.00
Offices -- T ~ e II-A** $73.65
Offices -'Iw e II-f3** $70.14
Offices -- T e IIL-A** $79.52
Offices - "~I' e ILI-B** $76.01.
Offices --- T ~ e V-A** $74.47
Offices - Tw e V-B** $70.14
Private Gara }es - Masora $28.22
Private Gara es - O en Ca orts 517.10
Private Garages -Wood. Frame $25.03
Private Cara res -Wood Frame Addition $25.03
Public Buildin rs - T ~ e 1A or 1 B* $127.10
Public Buildin s - T ~ e II-A $103.00
Public Buildings -- T~-• e II-B 598.47
Public Buildin >s - "I• e III-A $1.06.91
Public Buildin 7s -- T ~ e 111-B $103.21
Public Buildin 7s - "I` ~ e V-A 597.85
Exhibit B to Resolution 10-035
Page 3 of 3
Use and Construction T e S . ft. value
Public Buildin xs -- T r e V-B $94.35
Public Gary es - 'I' e 1 A or 1 B* $50.37
Public Gara >es ~-- Tv e 1 A or 1 B O en Park* $37.80
Public Ciara~es-'~I~' e II-B $28.84
Public Gara. Yes -- T e III-A $38.11
Public Gara es -1' e Ill-13 $33.89
Public Gara res - Tv e V-A $34.71
Residential hire S rinkler Svstem $1.00
Restaurants -- T e ID-A $100.32
Restaurants - T e III-B $96.92
Restaurants - Tv e V-A $91.88
Restaurants - T e V-B $88.27
Restaurants -- T e V-B Remodel 588?7
Retainnn Wall -'I' ~e I $20.60
Retainin ~ Wall - Ty e II $61.80
Retainin Wall - "I' • e II[ $1.03.00
Roofing/Commercial; 3 Tab $51.50
Roo~iin ~~/Commercial, Other $77.25
Schools - T e l A or 1 B $114.54
Schools -1` ~ e II-A $78.18
Schools ~-- T ~ e III-A $83.64
Schor>ls -'I'v e ilt-i3 $80.44
Schools - T - e V-A 578.38
Schaols-'1' ~ e V-I3 $74.78
Service Stations -~- Cano ies $28.84
Service Stations - 7'v e JI-13 $69.22
Service Stations - T e III-A $72.20
Service Stations - "I' ~ e V-A $61.49
Stora >e Shed $10.04
Stores - "I' ~e l A or 1 B* $114.54
Stores -- T ~ e lI-A $78.18
Stores - "I' ~ e Ill-A $83.64
Stot•es -- T - e Ill-B $80.44
Stores - "I' c V-A $78.38
Stores -- Tv e V-B $74.78
Sunrooms and Solariums $25.75
Theatres -- T e l A ot• l B $113.09
"theatres - Tv e lIi-A $82.40
Theatres - T ~ e lIl-B $78.49
"Theatres-'i' e V-A $77.56
Theatres -- T ~ e V-B 573.34
Warehouses - T e IA or ll3*** $50.88
Warehouses -- T e ]I or V-A*** 530.18
Warehouses - T ~ e II or V-B*** 528.33
Warehouses -- Tv e III-A*** 534.20
Warehouses-'T e III-I3*** $32.55
* Add 0.05 °~~ to total. cost of each story over three.
** Deduct 20 °'o for shell-only buildings.
** 'T'enant improvement Via), 20°io
*** Deduct 11 percent for mini-warehouses.
Exhibit C to Resolution 10-035
Page 1 of 4
EXHIBIT C
Table 3.36.020 Fees and Charges Summary
Description Charges
1. Public works technical conference fee 250.00"
One-year extension for public works technical conference fee $100.00
"Plus $50.00 per hour staff time spent in excess of five hours.
Note: Per the Engineering Design Standards Manual Chapter 1 "In the case of Type I permits in Tier 1, the fee for the
technical conference is credited to the Street Development and/or Utility Development Permit."
2. Variance under PTMC Titles 12 and 13 $200.00
3. Waiver request under PTMC Titles 12 and 13 $100.00
4. Administrative appeal of decisions of the director $200.00
5. Water reservation fee (county) $300.00''
Except for one building site adjacent to an existing main $250.00
Water reservation extension $50.00
*If more than seven and one-half hours of total review and process time is required, an additional hourly charge based
on the rates set forth in this chapter shall be made.
6. Bond administration fee $200.00
7. Testing fees
Pressure (inspector) $50.00
Bacteria (lab) $40.00
Any other water quality test administrative fee cost plus 10%
8. Limited hydrant use charge and permit fee under Chapter 13.13 PTMC
Contractors: --
Permit fee $50.00
Usage fee (bulk water) $1.75/1,000 gallons -city
$2.55/1,000 gallons -county
Cash deposit for meter $100.00
Failure to return meter or damaged meter Up to $1,500.00
9. Water meter installation charges under Chapter 13.16 PTMC
5/8" x 3/4" -Dig --
City $1,070.00
County $1,335.00
1" -Dig --
City $1,180.00
County $1,380.00
Page 1 of 4
Exhibit C to Resolution 10-035
Paae 2 of 4
Dual Service (includes one meter drop-in only)
1"x2@3/4"
City $1,240.00
County $1,505.00
1-1/2" -Dig --
City $2,000.00
County $2,200.00
2" -Dig --
City $2,275.00
County $2,475.00
4", 6", 8" -Dig
5/8" x 3/4" Drop-in --
City $135.00
County $160.00
1" -Drop-in --
City $185.00
County $215.00
1-1 /2" -Drop-i n --
City $465.00
County $480.00
2" -Drop-in --
City $615.00
County $630.00
Manifold tap
Customer requested downsizing of tap
*Charges based on actual cost established by public works director at rates contained in subsection 25 of this section.
10. Request to locate water or sewer lines received less than 48 hours before $60.00
excavation
11. Hot taps/main line extensions
Main line to main line tap $330.00
Extension of main line "
'Charges based on actual costs established by public works director at rates contained in subsection 25 of this section.
12. Turn-on/shut-off charge:*
Working weekdays 8:00 a.m. to 3:30 p.m. at convenience of the city --
City $20.00
County $25.00
After-hours or immediate, emergency turn-on/shut-off charge --
Page 2 of 4
Exhibit C to Resolution 10-035
Paae 3 of 4
City (except as set forth in Chapter 13.15 PTMC) $60.00
County $75.00
"For the first time turn-on for a new meter installation, the turn-on charge is incorporated within the meter installation
charge. For emergency or maintenance proposed only, a customer is allowed to turn-on/turn-off their water on their own
with no charge from city. They are responsible for any damage.
13. Removal and reinstallation of water meter $45.00
14. Water meter testing charge (customer request)
City $52.00
County $65.00
Water meter reread --
City $20.00
County $25.00
15. Final reading/disconnect
City $20.00
County $30.00
16. Returned check charge $15.00
17. Special review and inspection
"Charges based on service actual cost established by the public works director at rates contained in subsection 25 of this
18. Hourly labor and equipment charges:
Personnel (includes overhead):
Engineer $50.00
Inspector $35.00
Public works directorloperations manager $50.00
Crew chief/lead equipment operator $40.00
Equipment operator $30.00
Maintenance personnel $25.00
Administrative staff $25.00
Engineering technician $35.00
GIS coordinator $40.00
Equipment: Without operator With operator
Tractor-mounted mower $30.00/hr. $60.00lhr.
One-ton truck with utility box $15.00/hr. $45.00/hr.
John Deere grader $110.00/hr. $140.00/hr.
John Deere loader $90.00/hr. $120.00/hr.
Street sweeper $115.00/hr. $145.00/hr.
5-yard dump truck $40.00/hr. $70.00/hr.
Street roller $30.00/hr. $60.00/hr.
John Deere backhoe $40.00/hr. $70.00/hr.
Page 3 of 4
Exhibit C to Resolution 10-035
Paae 4 of 4
Ingersoll-Rand compressor $20.00/hr. $60.00/hr.
Vactor sewer jet and truck $140.00/hr. $180.00/hr.
19. Septage collection charge 15 cents per gallon*
"The city manager shall establish the cost of service with rates not to exceed this maximum (maximum equates to a rate of
$36.00 per wet ton). Jefferson County may add an additional charge to cover its administrative, handling, and collection
costs as provided by contract with the city.
20. Charge for compost produced at the city's biosolids composting facility (up $25.00 per cubic yard (includes state
to 10 yards) sales tax)`
Bulk rate for 10 yards per load or greater $20.00 per cubic yard (includes state
sales tax)'
"The city manager shall establish the cost of service with rates not to exceed this maximum.
21. Charge for department of health water system evaluation project
review and approval fees (WAC 246-290-120 and 246-290-990)* Such amount as required by department of
health pursuant to WAC 246-290-990`
*The city will make an effort to forward all applications for water system installation, extension, or improvement to
department of health in order to minimize charges to each applicant. However, in the event it is not possible to forward
more than one application, the applicant will be required to pay this amount in its entirety prior to the city processing any
such applications.
22. Charge for Department of Transportation approval pursuant to Chapter Such amount as required by Department of
23. New utility account set-up charge $10.00
24. Duplicate utility bill $5.00
25. Special utility bill (requested outside of regular billing cycle) $10.00
"Charges based on actual costs of service based on rates contained in subsection 25 of this section.
26. Engineering Design Standards Manual, City of Port Townsend,
Department of Public Works, April 1997, or as amended $50.00 per copy ($20.00 per update)
$20.00 disk copy ($10.00 per update)
Page 4 of 4