Loading...
HomeMy WebLinkAboutBLD99-029Waterman ~ Katz Building 181 Quincy Street, Suue 301 Port Townsend, WA 98368 Phone: (360)379-3208 Fax: (360)379-6923 CITY OF PORT TOWNSEND • CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLD99-~29 Issued: 4/19/99 Parcel Number: 989701001 Job Address: 1001 Water St Zoning: CIII Type: V-N Occupancy: M Nature of Work: Exterior window to become door w/landing, steps & handrail to grade; also steps to beach with handrail Owner: Paul Buesnel Tenant: Andy Gale Contractor: Tenant & Owner 360/692-0920 379-5458 GENERAL CONDITIONS APPLY -SEE LAST PAGE n T' /lT TTD Ti' Tl TI~TCUTi r'TT(1NC A PPR (1VF.Tl/i~ A TF. 1`iJ Vii ~+-~s~ CONCRETE STEPS Building Beach access - ~ FRAMING Door Safety glazing .60 max. U-factor Air seal & insulate exposed cavities Lever handle-opens from inside without use of a key or any special knowledge or effort (classroom function type lock) FINAL Fire Department signoff Stairs Handrails Door Building signoff . Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 2 Permit N BLD99-029 GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; ca11385-2294, press 3. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294, press 3. A minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the Building Department's final inspection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non- residential project. 8. AI! building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. • Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 2 _- _ _ _-_