HomeMy WebLinkAboutBLD99-029Waterman ~ Katz Building
181 Quincy Street, Suue 301
Port Townsend, WA 98368
Phone: (360)379-3208 Fax: (360)379-6923
CITY OF PORT TOWNSEND
•
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLD99-~29 Issued: 4/19/99 Parcel Number: 989701001
Job Address: 1001 Water St Zoning: CIII Type: V-N Occupancy: M
Nature of Work: Exterior window to become door w/landing, steps & handrail to grade; also steps to beach
with handrail
Owner: Paul Buesnel Tenant: Andy Gale Contractor: Tenant & Owner
360/692-0920 379-5458
GENERAL CONDITIONS APPLY -SEE LAST PAGE
n T' /lT TTD Ti' Tl TI~TCUTi r'TT(1NC
A PPR (1VF.Tl/i~ A TF.
1`iJ Vii ~+-~s~
CONCRETE STEPS
Building
Beach access -
~
FRAMING
Door
Safety glazing
.60 max. U-factor
Air seal & insulate exposed cavities
Lever handle-opens from inside without use
of a key or any special knowledge or effort
(classroom function type lock)
FINAL
Fire Department signoff
Stairs
Handrails
Door
Building signoff .
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 2
Permit N BLD99-029
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's registration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior
to beginning construction; ca11385-2294, press 3. Measures shall include installation of silt fencing and
graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt
debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting,
etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is
complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection ca11385-2294, press 3. A
minimum of twenty-four hours notice is required. Public Works approval must be received prior to
scheduling the Building Department's final inspection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non-
residential project.
8. AI! building permits expire if no progress has been made within six months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
•
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 2
_- _ _ _-_