HomeMy WebLinkAboutBLD99-097Waterman &xazz Building
181 Qwncy Street, Suite I01
PortTownaend, WA 98368
Phone: (360)379-3208 Faz: (360)379-6923
n
LJ
CITY OF PORT TOWNSEND
CONSTRUCTION PERNIIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLD99-097
Job Address: 1019 Water Street
Total Occupant Load: 45 (Both Decks)
Owner: Paul Buesnell
Issued: 6/1199 Parcel Number: 989701001
Zoning:. CIII Type: VV=N Occupancy: B
Nature of Work: Add 352 SF to existne deck. connected by
stairs
Tenant: Cheeks Bistro Contractor: Same As Tenant
379-5244
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Electrical -Contact Labor & Industries @ 360-417-2702
RRC1TTiRF1l TNfiPF.CTTONS
APPROVED/DATE
TEMP EROSION & SDM'T CONTROL
See Creneral Condition No. 2
FOOTINGS
Setbacks OKf as approved (Shorelines Exemption
LUP99-28)
Piers w/saddles
Reinforcement
FRAMING
Posts
Girder beams (6x8 spans 7')
Joists (2x8 spans 11'-6")
Positive connections
FINAL
Guardrail (if deck < 30" above grade, no code
requirements)
~,
Stairs w/handrail (each side if wider than 44") r
100# LL required for stairs III
Handrail extensions: 12" @ top, 24" @ bottom
No open risers; stair nosing per UBC Ch 11
Deck -Final
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 3
Permit ~ BLD99-097
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's registration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior
to beginning construction; ca11385-2294, press 3. Measures shall include installation of silt fencing and
graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt
debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting,
etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is
complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works,
requirements have been completed and inspected. For Public Works inspection call 385-2294, press 3. A
minimum of twenty-four hours notice is required Public Works approval must be received prior to .
scheduling the Building Department's final inspection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for anon-
residential project.
8. All building permits expire if no progress has been made within six months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal and approval prior to making changes in the field. Obtain revisions from the
Building Department (379-3208) prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
•
Call 48 hours before you dig for utility line locates
I-800-424-5555
Page 2 of 2