Loading...
HomeMy WebLinkAboutBLD99-097Waterman &xazz Building 181 Qwncy Street, Suite I01 PortTownaend, WA 98368 Phone: (360)379-3208 Faz: (360)379-6923 n LJ CITY OF PORT TOWNSEND CONSTRUCTION PERNIIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLD99-097 Job Address: 1019 Water Street Total Occupant Load: 45 (Both Decks) Owner: Paul Buesnell Issued: 6/1199 Parcel Number: 989701001 Zoning:. CIII Type: VV=N Occupancy: B Nature of Work: Add 352 SF to existne deck. connected by stairs Tenant: Cheeks Bistro Contractor: Same As Tenant 379-5244 GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REQUIRED: Electrical -Contact Labor & Industries @ 360-417-2702 RRC1TTiRF1l TNfiPF.CTTONS APPROVED/DATE TEMP EROSION & SDM'T CONTROL See Creneral Condition No. 2 FOOTINGS Setbacks OKf as approved (Shorelines Exemption LUP99-28) Piers w/saddles Reinforcement FRAMING Posts Girder beams (6x8 spans 7') Joists (2x8 spans 11'-6") Positive connections FINAL Guardrail (if deck < 30" above grade, no code requirements) ~, Stairs w/handrail (each side if wider than 44") r 100# LL required for stairs III Handrail extensions: 12" @ top, 24" @ bottom No open risers; stair nosing per UBC Ch 11 Deck -Final Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 3 Permit ~ BLD99-097 GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; ca11385-2294, press 3. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works, requirements have been completed and inspected. For Public Works inspection call 385-2294, press 3. A minimum of twenty-four hours notice is required Public Works approval must be received prior to . scheduling the Building Department's final inspection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for anon- residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal and approval prior to making changes in the field. Obtain revisions from the Building Department (379-3208) prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. • Call 48 hours before you dig for utility line locates I-800-424-5555 Page 2 of 2