HomeMy WebLinkAbout83-018BRESOLUTION NO. 83- It
A RESOLUTION AUTHORIZING EXECUTION OF A
MOMTH -TO -MONTH LEASE OF THE KAH -TAI LAGOON
PARK BUILDING
BE IT RESOLVED:
That the Mayor be and he is hereby authorized and
directed to enter into an agreement for a month -to -month
tenancy of the Kah -Tai Lagoon Park building with one Steve
Corra, for a rental of $100.00 per month and 8 hours per
month of labor, on the conditions set forth in the annexed
"Exhibit A," which by this reference is incorporated herein
and made a part hereof, the same as though fully set forth
herein.
Passed at a regular meeting of the City Council of
the City of Port Townsend on October q TH , 1983.
BRENT SHIRLEY
Mayor
ATTEST:
r
David Grove
City Clerk
APPROVED AS TO FORM:
04- Gl n Abrah
C'ty Attorney
-� C
13 c
n�
�+ C
gyp! Q
CO
L®
m
a
'es
• i
0
I
N
A
-t
W
lu
Z
z }
w
o
U2 w
Q
� a
U
D a
Cl v
�a o
oa
m
Om
<t "
F�
O �
O�
u'f
t-
a
�a
LO
LL
--I
m
r
!!^^
~
I-
SJ1
m
Q
U
LU
O
LL
W
k.
D
(69;
-.
r
m
s
j
w
cc
c9
(n
lu
o
Lr
�
�
m
Q>11�
2
c�
Ri
o
j
:CH
unq a� /d ?nb
t-
�
�
s�n(a dvuv�}aun
m�
U
U
U
U
U
iu
-l- m v
RC)
M
�i'
l0
IIl
N
M
u
Q
Q
Q
Q
CIT
- v
J Q
�JOM Jv
S4i7j� JOt+D(/�j
!
N
M
- -cs
u �
u v �
�
yo
FC
co
1 A �
.•
�+
�
F4
A
7
�
O
W
Q
2
o.
H
p o
O
P4
_
U � �
H
W
H
�U
U o��
H
U)
a
:s
�-,a'� p
W�
n'
Zos
F ?
o�
X77
1
u2 a
N
+
Cr
�
W
i
n O
o
co
�,
a
z
a T
U..
ON W711
r/
r-I
N
M
ti'
Lf1
l0
W
lu
Z
z }
w
o
U2 w
Q
� a
U
D a
Cl v
�a o
oa
m
Om
<t "
F�
O �
O�
INSTRUCTIONS FOR PREPARING SIX -YEAR
TRANSPORTATION IMPROVEMENT PROGRAM
NOTE: This form is set up in "Elite" typewriter format (12 characters per inch) for coding computer input. Only that information
appearing in the coding blocks will be entered on the computer. Additional information may be included on the form for
the Agency's convenience but will not be placed on the computer file.
A. An obligation program indicated the allocation of funds to major phases of project development i.e. preliminary engineering
right -of -way and construction. Show the funding amount for the entire phase or phases in the expected year of obligation even
though the expenditure of funds may take place over several years.
B. Include all proposed projects regardless of location or source of funds, however, urban arterial trust fund projects need to be
included only in six -year transportation improvement programs beginning in odd numbered years.
C. Complete the form for the six -year program in accordance with the following instructions:
HEADING
City/County: . . . . . . . . . .
. . . . . Enter name of local agency and appropriate county.
County Number: ............
Enter the O.F.M. assigned number in code blocks 7 & 8.
City Number: ..............
Enter the O.F.M. assigned number in code blocks 3 thru 6.
Hearing Date: ..............
Enter the date of action by the City Council or County Legislative Authority.
Adoption: .................
Enter the date of action by the City Council or County Legislative Authority.
Resolution Number: ..........
Enter City Council or Co. Legislative Auth. resolution number (if applicable).
COLUMN NO.
1.
Item No ................
Enter local agency project identifying numbers in chronological order.
2.
Project Identification ......
Enter appropriate information noted in column heading. Enter Route Name and
termini in code blocks 9 thru 35.
3.
Major Class of Work .......
Enter the appropriate code number(s). Enter major code in block 36.
1. New construction on new alignment
6. Traffic control
2. Major widening (additional lanes) 7. Capital purchases
3. Minor widening (increase lane width, add shoulders) 8. Non capital improvements
4. Rehabilitation /reconstruction
9. Non Motor Vehicle use
5. Resurfacing
4.
Work Codes .............
Enter appropriate code letter(s). Enter major items of work in code blocks 37 thru 40.
A. Grading
L. Bridge
B. Draining
M. Landscaping
C. Light Bituminous Surface
N. Paths & Trails
D. A.C. or P.C.C. Pavement
O. Bikeways
E. Sealcoat
P. Transit Facility
F. Curbs & Gutters
Q. Commuter Pool
G. Sidewalks
R. High Occupancy Vehicle Lanes
H. Channelization
S. Surveillance Control & Driver Information
1. Signalization
T. Ferry Facility
J. Lighting
U. Project Studies
K. Signing
5.
Total Length in Miles ......
Enter Length of project to nearest hundredth in code blocks 41 thru 44.
6.
Functional Class ..........
Enter one appropriate code letter in code block 45.
M - Major Arterial (Principal)
S - Secondary Arterial (Minor) C - Collector Arterial (Collector) A - Access
7.
Rural - Urban ............
Enter the appropriate letter: R - Rural U - Urban in code block 46.
8.
Carryover Project .........
Enter (x) if project is carried over from previous years annual element. (Funds were
not obligated during previous year). Enter in code block 47.
9.
1st Year (Annual Element) ...
Enter total project costs to be obligated in the first calendar year of the six -year
program in code blocks 48 thru 51.
10 -
12. (2nd, 3rd, 4, 5 & 6th years) ..
Enter estimated project costs to be obligated in each year or years in code blocks
52 thru 55.
13, 15, & 16. Funding by Source .... Enter the dollar amount to be obligated under applicable funding source column in
appropriate code blocks.
14. Program ............... Enter the funding source program. (FAUS, FAS, SOS, etc.) in code blocks 68 thru 71.
17. Total Funds ............. Enter total project cost in code blocks 80 thru 85.