Loading...
HomeMy WebLinkAbout84-039RESO ,UT ON NO. 37 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PORT TOWNSEND SUPPORTING LOCAL CONTROL OVER HYDROELECTRIC PROJECTS IN JEFFERSON COUNTY, WASHINGTON WHEREAS the City Council ~lieves local citizens and govern- mental entities should, have control over and benefit from develop- ment of resources which may take place in Jefferson County, and WHEREAS hydroelectric developmentp~ursu~nt to federal law probably will occur locally because of preference for hydroelectric generation over -~other types of electrical generation; the perceived need for more powe'r~ for the future as poDulation grows; and because the capacity of local rivers to provide power during the winter when that power is most valuable might exist without diminishing or affecting existing water rights and the uses thereof for domestic, industrial commercial,agricultural and other purposes,and WHEREAS the Jefferson County PUD No. 1 and the City of Tacoma have represented that their ~proposed hydroelectric projects will proceed without diminishing, reducing or in any other manner affecting the City's w~t~rightcs~water~F~wa~te~s~e~a~d~~~, pr~p~r~tie~_.~an~P~ ~ns~rk~-i~e~rC~_~.~'~i~.~.~ interests therein,and that through the possible use of the water right of the mu~t~a~'~q~n~it~iPo~~s~d~a~r~'~Co~!~ the project may re- present a continuing regular source of income for the City and the Company, and additional costs such as conduits or filtration will be borne by the hydroelectric project sponsors, and WHEREAS the Jefferson County PUD No. 1 presently has a pre- liminary permit pursuant to federal law and with the City of Tacoma is studying the feasibility of the hydroelectric projects and that if the project or projects are determined by them or either of them to be feasible, they will probably apply for a federal license and proceed with the construction and development of the projects,and WHEREAS, the City Council believes that if the projects are to be developed at all, it should be done by a local municipality or entity, provided that the exising water rights, water and water system and related properties of the City and the Port Townsend Paper Company are not affected thereby, and WHEREAS the City expressly reserves all rights to take any necessary steps to assure the integrity of the water system in its entirety, NOW THEREFORE,BE IT RESOLVED that the City Council supports Hydroelectric Generation Proposition No. 1 to be presented to the voters on November 6, 1984, as a means of retaining at this time local control over the projects. Passed by the Council and approved by the Mayor this ~day of October, 1984. MAYOR BRENT SHRILEY~~