CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
For Next Day Inspection Ca11385-2294 Before 3P.M.
Permit Number: BLDOS-245 Issued: 1/6/06 Parcel Number: 958 202 702
Job Address: 410 24th Zoning: RR=II Type: V-B Occupancy: R-3
Nature of Work: (SFRI remodel & two foot addition to bedroom
Owners: William Vinson Contractor: owner
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REOITII2ED:
Electrical -Contact Labor & Industries @ 360-417-2702
RF.t7TTTRFT) TNCPF.('TTnNS
APPR C1VF.Tl/n A TF.
TEMP EROSION & SEDIMENT CONTROL
See General Condition No. 2
Silt Fence as needed
Drive Off Mat to restrict sediment from leaving the site
DEMOLITION
Materials from demolition shall be deposited in the
Jefferson Coun Landfill or other approved
location in accordance with all state and local laws
and ordinances
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 3
Permit #BLDOS-245
RF(1TTTRFTI TNCPF.CTT(1NC
APPROVED/DATE
FRAMING -all members and connections require inspection
prior to cover
Fasteners harmers etc in contact with treated material must be
hot dipped galvanized
Walls
Drop Ceilings
Posts, Beams & Headers
Rafters (hurricane clips)
Roof Venting - eave and ridge vents
Windows egress 5.0 Sq Ft. for ground floor & 5.7 Sq. ft. for 2"a
Smoke detectors (bedrooms, outside bedrooms and each floor)
Safety Glazing
Windows Ufactor - .40 or better
Doors U-factor-.20 or better
NFRC window stacker must be on window, skylights & doors at
insp. time.
Fresh Air Intake Doors
Air Sea]
Fire Blocking
Weather Resistive Barrier
INSULATION
Floors R-30
Walls R-21
Ceiling -attic R-38
Vapor Barrier: paint for walls and ceiling
Baffles
FINAL
House Numbers - 5"minimum
Vapor Barrier Paint Certificate
Insulation Certificate
Smoke Detectors hardwired in all existing bedrooms & in hall
Final -Building
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's
registration number and a City business license. Failure to provide proof of this documentation prior
to work may result in job shut down while this is accomplished.
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 3
Permit #BLDOS-245
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected
prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and
graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt
debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic
sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once
construction is complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correcfion of any and all deficiencies noted by
required inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass fmal inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 385-2294. A
minimum of twenty-four hours notice is required. Public Works approval must be received prior to
scheduling the Building Department's final inspection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non-
residential project.
8. All building permits expire if no progress has been made within six months, or if no inspections are
done by the Building Department within one year. Call for at least one inspection per year to keep
your building permit active.
9. Revisions require submittal and approval prior to making changes in the field. Contact the Building
Department (379-3208) prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Applicant Signature Date
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 3 of 3