Loading...
HomeMy WebLinkAboutBLD05-219Waterman & Katx Building 181 Quincy Street, Suite 301 Port Townsend, WA 98368 Phone: (360) 3793208 Fax: (360) 388'/675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspections by 3:00 PM for Next Day Inspection Permit Number: BLDOS-219 Issued: 11/03/05 Parcel Number: 984 901 401 Job Address: 1005 Fir Street Zoning: RR=II Type: VV=N Occupancy: 'R Nature of Work: Remove existin¢ cedar shingles and renlace with composition shingles. Owner: David & Alice I{in¢ Issued by:c~i ~, ~6~},t~r Contractor: Hone RooSne - HOPER**043N7 NOTE: Roofing materials to be installed per manufacturer's specifications and IBC Chapter 15. GENERAL CONDITIONS APPLY -SEE LAST PAGE REQUIRED INSPECTIONS APPROVED/DATE DEMOLITION All construction debris to be deposited in Jefferson County Landfill or other location in accordance with all local, state and federal laws. SHEATHING Nailing inspection required prior to cover with felt. ROOF VENTING Ridge Venting Install per IBC Section 1203 ROOFING Install all roofing material per IBC Secfion 1510 FINAL Smoke detectors required per IBC Section 907.2.10.1.2 i Building Numbers -Minimum 5" numbers of contrasting color posted near main entrance of house i and visible from street per City Ordinance Final -Building Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 2 Permit #BLDOS219 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. If temporary erosion and sediment control (TESC) measures are required, they shall be installed on-site and inspected prior to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of-way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. Final Inspections are required prior to occupancy; a Certificate of Occupancy is required for a non-residential project. 7. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 8. Revisions require submittal & approval prior to making changes in the field. Contact the Building Department @ 379-5095 prior to making changes to the approved plans. 9. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Ca1148 hours before you dig for utility line locates I-800-424-5555 Page 2 of 2