HomeMy WebLinkAboutBLD05-198Permit#BLDOSIBfi
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number BI~D~S-I98R-I
Job Address: 1035 Tremont St. Zoning: RR=11
Total Occupant Load: 3
Owners: Ezekiel McFadin
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Electrical -Contact Labor & Industries @ 360-417-2702
Contractor: McFadin & Davis Inc. - MCFADDI196MA
*** All elements ojengineering including holdowns, framing, nailing and other engineering connections require
inspection prior to cover. ***
RF.(1TTTRF,T) TNSPF,CTTONS
Parcel Number: 936-300-902
Type: VV=B Occupancy: RJ
Nature of Work: Construct accessory dwelline unit.
APPROVED/DATE
TEMP EROSION & SEDIMENT CONTROL
See General Condition No. 2
Silt Fence as needed
Drive Off Matto restrict sediment from leaving the site
FOOTINGS
Setbacks
Footings
Forms
Reinforcement
Hold downs - TO BE IN PLACE PRIOR TO CONCRETE POUR
Anchor Bolts & Washers
UFER
Porch/Deck Piers
FOUNDATION WALLS
Reinforcement
Hold Downs
FOOTING DRAINS (1105 UPC -section 1101.5)
Must discharge at grade to approved focation, independent of roof
drains
PLUMBING:
Rough-In (D-V-T & Clean outs)
Water Supply
Water Hammer Arrester
Hose Bibs (backflow protection required)
Pipe Insulation (R-3)
Pressure Reduction Valve required
Water Heater
Seismic Restraint -strap tank @ I/3 points
Pressure relief valve drain to exterior, terminate
6" - 24" above ground
Licensed Plumbing Contractor's Signature & License Number:
Sigo here
Issued: 12!05/OS
Parmi[ q 0LD05-] Bfi
FLOOR FRAMING
Joists
Hangers
Blocking Positive Connections
Treated Wood to Concrete
PT plate connections
Anchor Bolts & Washers
Hold downs
MECHANICAL
Whole House Fan
Kitchen/Bath/Laundry Fans
Environmental Air Exhaust ducting (w/back draft dampers), insulation
(R-4) and terminus (located 3' from openings)
EXTERIOR BRACED & ALTERNATE BRACED WALL
PANELS - must be inspected prior to cover
FRAMING -all members and connections require Inspection prior to
cover
Fasteners haneers etc in contact with treated material must be hot
dipped galvanized
Walls
Ceilings
Posts, Beams & Headers
Roof
Rafters
Joists
Joists Clips
Blocking
Roof Venting - eave and ridge vents
Windows -egress
Safety Glazing
Windows Ufactor - .40 or better
NFRC window sticker must be on window, skylights, & doors at
insp. time.
Fresh Air Intake Doors U-factor - .20 or better
Air Seal
Fire Blocking
Weather Resistive Barrier
INSULATION
Floor (R-30
Walls (R-2~
Ceiling (R30 vault)
Vapor Barrier: paint for walls and ceiling
Baffles
PUBLIC WORKS FINAL
Public Works Sign-Off
FINAL
Parking - 1 space required
House Numbers - 5" minimum
Plumbing
MechanicaUHeating
Vapor Barrier Paint Certificate
Insulation Certificate
Smoke Detectors
Fina] -Building
GENERAL CONDITIONS
Permit p aLD05-186
1. ContraMOrs working on this project are required to have a Labor & Industries contractor's reais[ration number and a City business license.
Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 385-
2294. Measures shall include installation of silt fencing and graveled construMion entrance (see attached details). Adjacent rights-qf--way shall
be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be
permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent
properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABW'P) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and
inspected. For Public Works inspection ca11385-2294. A minimum of twenty-four hours notice is required. Public Works aooroval must be
received prior to schedulinc the Buildina Department's final insoection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for anon-residential project.
8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within
one year. Call for at least one inspection per year to keep your building permit active.
9. Revisions require submittal and approval prior to making changes in the field. Contact the Building Department (379-3208) prior to making
changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
APPLICANT SIGNATURE
DATE
Permi[ # m.DOSIBfi
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: BLDUS-I9g
Job Address: 1037 Tremont St. Zoning: R-I(
Total Occupant Load: 3
Issued: 12/05/05 Parcel Number: 936-300-902
Type: VV=B Occupancy: R-3
Nature of Work: Construct sin¢le family dwellin¢
Owners: Ezekiel McFadin Contractor: McFadin & Davis Inc.-MCFADDI196MA
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Electrical -Contact Labor & Industries @ 360-417-2702
*** All elements of engineering including holdowns, framing, nailing and other engineering connections require
inspection prior to cover. ***
REQUIRED INSPECTIONS
APPROVED/DATE
TEMP EROSION & SEDIMENT CONTROL
See General Condition No. 2
Silt Fence as needed
Drive Off Mat to restrict sediment from leaving the site
FOOTINGS
Setbacks
Fookings
Forms
Reinforcement
Hold downs - to be in place prior to concrete pour
Anchor Bolts & Washers
LIFER
Porch/Deck Piers
FOUNDATION WALLS
Reinforcement
Hold Downs
FOOTING DRAINS (1105 UPC -section 1101.5)
Must discharge at grade to approved location, independent of roof
drains
PLUMBING:
Rough-In (D-V-T & Clean outs)
Water Supply
Water Hammer Arrester
Hose Bibs (backflow protection required)
Pipe Insulation (R-3)
Pressure Reduction Valve required
Water Heater
Seismic Restraint- strap tank @ 1/3 points
Pressure relief valve drain to exterior, terminate
6" - 24" above ground
Licensed Plumbing Contractor's Signature & License Number:
Sign here
Permit H BLDOS-I B6
FLOOR FRAMING
Joists
Hangers
Blocking Positive Connections
Treated Wood to Concrete
PT plate connections
Anchor Bolts & Washers
Hold downs
MECHANICAL
Whole House Fan
Kitchen/Bath/Laundry Fans
Environmental Av Exhaust ducting (w/ back draft dampers), insulation
(R-4) and terminus (located 3' from openings)
EXTERIOR BRACED & ALTERNATE BRACED WALL
PANELS - must be inspected prior to cover
FRAMING -all members and connections require inspection prior to
cover
Fasteners handers etc in contact with treated material must be hot
dipped galvanized
Walls
Ceilings
Posts, Beams & Headers
Roof
Rafters
Joists
Joists Clips
Blocking
Roof Venting - eave and ridge vents
Windows -egress
Safety Glazing
Windows Ufactor - .40 or better
NFRC window sticker must be on window, skylights, & doors at
insp. time.
Fresh Air Intake Doors U-factor - .20 or better
Air Seal
Fire Blocking
Weather Resistive Barrier
INSULATION
Floor (R-30
Walls (R-21
Ceiling (R-30 vault
Vapor Barrier: paint for walls and ceiling
Baffles
PUBLIC WORKS FINAL
Public Works Sign-Off
FINAL
Parking - 1 space required
House Numbers - 5"minimum
Plumbing
MechanicaVHeating
Vapor Barrier Paint Certificate
Insulation Certificate
Smoke Detectors
Final -Building
N CONDITIONS
Permit k eCDOS-186
1. ContraMOrs working on this project are required to have a Labor & Industries contractor's reeistration number and a City business license.
Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 385-
2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall
be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be
permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent
properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspecfion prior [o cover.
4. Owner or owner's agent shall review and oversee correction of any and all deticiencies noted by required inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and
inspected. For Public Works inspection ca11 385-2 2 9 4. A minimum of twenty-four hours notice is required. Public Works aoaroval must be
received prior to scheduling the Building Department's final inspection.
7. Final lnspections are required prior to occupancy; A Certificate of Occupancy is required for anon-residential project.
8. All building permits expire if no progress has been made Within six months, or if no inspections are done by the Building Department within
one year. Call for at least one inspection per year to keep your building permit active.
9. Revisions require submittal and approval t~ri0r to making changes in the field. Contact the Building Department (379-3208) prior to making
changes to the approved plans.
10. POST TA1S PERMIT ON-SITE WITH THE APPROVED PLANS.
APPLICANT SIGNATURE
DATE