Loading...
HomeMy WebLinkAboutBLD05-196Wazennao & Katz Btilding 181 Quincy Street, Sui[e 301 Port Townsend, WA 98368 Phone: (360)379-37A8 Fax: (360)365-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLDOS-196 Issued: 12/23/05 Parcel Number: 989 700 611 Job Address: 635 Water Street/Water Street Hotel Zoning: C-III Type: VV=N Occupancy: N/C Total Occupant Load: N/C Nature of Work: Brick and mortar restoration on south walls and Annex (east sidel ' Owner: Chris and Donna Sudlow Contractor: Olympic Masonry Restoration (Jim Mergens 385-5757) GENERAL CONDITIONS APPLY -SEE LAST PAGE RF.niTiRF.D iNSPF.CTinNS APPROVED/DATE SEDIMENT CONTROL Sweep concrete & paved surfaces during construction as needed. Keep mortar and lime and other construction sediment out of storm drains. PEDESTRIAN PROTECTION Install protection around area of work to prevent pedestrian access and provide protection from falling debris. Inspection required prior to beginning work. MASONRY See attached historic brief on repointing mortar joints. FINAL Building Number Final -Building Ca1148 hours before you dig for utility line locates I-800-424-5555 Page 1 of 2 Pumit q BLDOS-196 GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's reeistration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294. A minimum of twenty-four hours notice is required. Public Works anaroval must be received urior to scheduline the Buildine Department's final inspection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non- residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval prior to making changes in the field. Contact the Building Department at 379-5086 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 2 s_z~_ra ~~ ~ t ~ ~©~ ~ho~ ~~ ~ ~o t21~ l,~ ~ ~v~ d~~~~ ~' m ~~~ q ~`~~P~~~or~.~~l ~~ o ~~ -~~`~` ~~ ~ ln_ "z3 D~