HomeMy WebLinkAboutBLD05-189# • 2 `~ Permil MBLDOS-189 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11 3 85-22 94 for Inspection Permit Number: BLDOS-1 g9 Issued: 11/02/OS Parcel Number: 989-704-109 Job Address: 825 Washington St. Zoning: C-III Type: VV=B Occupancy: RR=2 Total Occupant Load: 6 Nature of Work: Interior remodel for 3 condominium units Owner: Ritch Soreen & Marlies Egberding Contractor: Newland Construction Co. Inc. - NEWLAC*343L0 GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REQUIRED: Electrical -Contact Labor & Industries @ 360-417-2702 Historic Preservation Committee -design review required for remaining items e.g., doors, rosette design, etc. prior to installation in the fteld RFCITITRF.D TNSPFf'TTONS APPROVED/DATE DEMOLITION All materials to be disposed of in an approved land fill. SPECIAL INSPECTION required for epoxy sets, structural steel and high-strength bolts per International Building Code Section ]704 -The owner shall employ one or more special inspectors to provide inspections during construction on the type of work listed here. The special inspector shall be a ICC certified inspector }fisted in the current edition of the WABO "Agency and Inspector Register" or present credentials that demonstrate competence, to the satisfaction of the building official, for inspection of the particular type of construction requiring special inspection. Special Inspection Reports shall be copied to the Building Department in a timely manner. Permit Holder or Permit Holder's Agent shall review and oversee correction of any and all deficiencies noted by required special inspections. Permit kBLD05-189 RF.OiJiRED INSPECTIONS APPROVED/DATE BRICK New Openings Lintel Positive Connections Epoxy Mortar Restoration See plans and attached Preservation Brief on Repointing Mortar Joints in Historic Masonry Buildings; periodic inspection reguired by engineer or person competent in historic mortar repair PLUMBING Rough-in (D-V-T & cleanouts) Water Supply Water Hammer Arrester @ clothes and dishwashers Pipe Insulation (R-3) Drain, waste & vent Pressure Reduction Valve required Water Heater Drain Pan Strap @ 1/3 points with bottom strap minimum 4" above controls Pressure Relief Valve drain to exterior, pointed down, terminate 6" - 24" above ground Appliances Licensed Plumbing Contractor's Signature & License Number: Signature• MECHANICAL Bathroom/Kitchen/Laundry Room Fans Whole House Fans Environmental Air Exhaust ducting (w/back draft dampers), insulation (R-4) and terminus (located 3' from building openings) FRAMING Walls Stairs Ceiling Beams & Headers Positive Connections Plates Interior Doors - 30 minute with smoke gaskets Transoms -fixed closed; wired glass in steel frame New Exterior Door - .55 U factor or better Permit NHLDOS-]89 RF.OiIiRED INSPECTIONS APPROVED/DATE FRAMING (continued) Seismic Anchoring See also General Structural Notes, Sheet SI.1 Detail 4, Sheet S3.1 LTT Tension Ties A35 Anchors Bolts Blocking Detail 3, Sheet 53.1 Threaded Rod A35 Anchors Washers & Nuts Blocking Fresh Air Ports -window or wall ports required Windows -escape Safety Glazing Air Seal Fire blocking CHIMNEY ANCHORING See detail 12/Sheet 53.7 Chimney Straps Blocking Washers Rods A35 Anchors INSULATION WSEC Section 1134 Historic Buildings allows for alternate requirements that result in a reasonable degree of energy efficiency and do not decrease the degree of existing eff ciency. Existing roof/ceiling, wall and floor cavities exposed during construction shall be insulated to full depth with minimum R- 3/inch insulation. Existing walls and floors without framing cavities may remain; new framing added to existing walls and floors shall be frlled with minimum R-3/inch insulation Walls Ceiling Floor Vapor Barrier: paint for walls & ceiling R-10 under electric WH placed on concrete slab DRYWALL NAILING 30 minute exit stair enclosure 30 minute, smoke-tight doors Enclosed Space under stairs I-hour Dwelling Unit separation • ~ Pernut ltBLD05-I89 FINAL Building Numbers -minimum 5" Historic Preservation Committee Fire Department Electrical (L & I) Plumbing Mechanical Vapor Barrier Paint Certificate Insulation Certificate Smoke Detectors Final -Building GENERAL CONDITIONS I. Contractors working on this project are required to have a Labor & Industries contractor's re¢istration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Soils exposed during construction shall be temporarily stabilized with mulching, plasfic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deSciencies noted by required inspections. 5. Re-inspection is required after any corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection calf 385-2294; a minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the Building Department's renal inspection. 7. Final Inspections and Certifcate of Occupancy are required PRIOR to occupancy. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval prior to making changes in the field. Contact the Building Department 344-3057 prior to making changes to the approved plans. r~ u Permit gBLD05-I89 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Applicant Signature Date