Loading...
HomeMy WebLinkAboutBLD05-183Permit mBLD05-183 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: $I~D~S-1g3 Issued: 11/02/05 Job Address: 825 Washington St. Total Occupant Load: 6 APPROVED BY: DATE: Parcel Number: 989-704-109 Zoning: C-IH Type: VV=B Occupancy: R3 Nature of Work: Interior remodel for 3 condominium units Owner: Ritch Sorgen & Marlies Egberding Contractor: Newland Construction Co. Inc. - NEWLAC*343L0 GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REQUIRED: Electrical -Contact Labor & Industries @ 360-417-2702 RF.nTTTRFI) TNCPF.('TTfINS APPRnVF.1)/nATF, DEMOLITION All materials to be dis osed o in an ap roved land all. "SPECIAL INSPECTION REQUIRED FOR EPOXY SETS" -The owner shall employ one or more special inspectors to provide inspections during construction on the type of work listed here. The special inspector shall be a quaked person who shall demonstrate competence, to the satisfaction of the building official, for inspection of the particular type construction requiring special inspection. Submit reports to the Ci of Port Townsend - Buildin De t. PORT TOWNSEND HISTORIC PRESERVATION COMMITTEE REQUIRES SUBMISSION & APPROVAL OF NEW OVERHEAD SPECIFICATIONS PRIOR TO INSTALLATION. PORT TOWNSEND HISTORIC PRESERVATION COMMITTEE REQUIRES SUBMISSION & APPROVAL OF CHANGED WINDOWS ALONG ALLEY/DRIVEWAY PRIOR TO FABRICATION & INSTALLATION. PORT TOWNSEND HISTORIC PRESERVATION COMMITTEE REQUIRES SUBMISSION & APPROVAL OF DETAILS & SPECIFICATIONS FOR AWNING ABOVE MAN-DOOR ALONG WASHINGTON STREET. Pemtic MBI.DOS-183 FIRE DEPT. REQUIREMENT 3rd Party Review for automatic fire detection alarm system - alterations must comply w/ NFPA. Fire Dept. shall approve alterations prior to commencing work. Fire Extinguishers @ stair foyer of each floor level. Afl other re uirements of Plan Review memo dated 10/21/05. CMU New Openings - 3 - %z" thru rod epoxy set into existing CMU wall CMU Inf-ll 2 - #4 vert & 2 - #4 horiz. 48" o.c. 2 places min. Epoxy dowel PLUMBING Rough-in (D-V-T & cleanouts) Water Supply Water Hammer Arrester Pipe Insulation (R-3) Drain, waste & vent Water supply - R-3 insulation outside of conditioned space Pressure Reduction Valve required Water Heater Strap @ 1/3 points Pressure Relief Valve drain to exterior, pointed down, terminate 6" - 24" above ground Appliances Licensed Plumbing Contractor's Signature & License Number Signature• MECHANICAL Bathroom/Kitchen/Laundry Room Fans Whole House Fans Environmental Air Exhaust ducting (w/ back draft dampers), insulation (R-4) and terminus located 3' from o enin s) FRAMING -per design details on plans PLS Beams Grout Dam Bond Beam Hangers Grout Walls Ceiling Posts, Beams & Headers Positive Connections Plates Fresh Air Intakes Windows -egress Safety Glazin Permit ABL~OS-183 Walls Air Seal Fire blockin INSULATION -DEFERRED SUBMITTAL Walls Ceiling Floor Vapor Barrier: paint for walls & ceiling FINAL Building Numbers -minimum 5" Historic Preservation Committee Fire Department Electrical (L & I) Plumbing Mechanical Vapor Barrier Paint Certificate Insulation Certificate Smoke Detectors Final -Building Permit #SLDOS-l83 GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's reeistration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after any corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294; a minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the Building Department's final inspection. 7. Final Inspections and Certificate of Occupancy are required PRIOR to occupancy. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval prior to making changes in the field. Contact the Building Department 344-3057 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. ~~ ~_~.~-~~ Seattle (Dispatch) 762-3490 • Secede (OtTrel 7632740 Pordard 224-7067 • Tacoma 922-(k{57 • IIremenon 373-5012 Aberdeen 533-0550 • Pt. Angeles 457-42'.11 • Yakima 453-436? Spokane 535-43? 1 • Paeco 547-7599 • l.onpvien' 577-6326 Moses Lake• Wznatchec I-800-936~32t