HomeMy WebLinkAboutBLD05-181R'aterman & Katz Building
18l Quincy Street, Soite 301
Port Townsend. WA 98368
Phone: (360) 37&3108 Fex: (360) 3857673
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspections
Permit Number: $LDOS-igl Issued: 09/13/05 Parcel Number: 957607101
Job Address: 315 Decatur Street Zoning: CC=II Type: VV=N Occupancy: 'M
Nature of Work: Remove existinE composition shin¢les and replace with composition shineles.
Owner: Barbara Engstrom
Contractor: Hope Roo£m¢ - HOPER**043N7
NOTE: Roofing materials to be installed per manufacturer's specifications and IBC Chapter 15.
GENERAL CONDITIONS APPLY -SEE LAST PAGE
RFnT1TRF,n TNSPRCTTONS APPROVED/DATE
DEMOLITION
All construction debris to be deposited in Jefferson
County Landfill or other location in accordance with
all local, state and federal laws.
SHEATHING
Nailing inspection required prior to cover with felt.
ROOF VENTING
Ridge Venting
Install per IBC Section 1203
ROOFING
Install all roofing material per IBC Section 1510
FINAL
Smoke detectors required per IBC Section 907.2.10.1.2
Building Numbers -Minimum 5" numbers of
contrasting color posted near main entrance of house
and visible from street per City Ordinance
Final -Building
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 2
Permit #BLDOSI SI
GENERAL CONDITION
1. Contractors working on this project are required to have a Labor & Industries contractor's
reeistration number and a City business license. Failure to provide proof of this
documentation prior to work may result in job shut down while this is accomplished.
2. If temporary erosion and sediment control (TESC) measures are required, they shall be
installed on-site and inspected prior to beginning construction; call 385-2294. Measures shall
include installation of silt fencing and graveled construction entrance (see attached details).
Adjacent rights-of-way shall be kept free of dirt debris. Soils exposed during construction
shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently
stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is
responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall
panels (ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted
by required inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. Final Inspections are required prior to occupancy; a Certificate of Occupancy is required for
a non-residential project.
All building permits expire if no progress has been made within six months, or if no
inspections are done by the Building Department within one year. Call for at least one
inspection per year to keep your building permit active.
8. Revisions require submittal & approval prior to making changes in the field. Contact the
Building Department @ 379-3208 prior to making changes to the approved plans.
9. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 2