HomeMy WebLinkAboutBLD05-157R'atelman & Katz Building
]81 Quincy Streu, Suite 30l
Pon Townsend, WA 98368
Phove: (360)379-5086 Fax: (360)384-7675
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLDOS-157 Issued: 07/29/05 Parcel Number: 989 710 305
Job Address: 538 Adams Street Zoning: RR=II Type: V_N Occupancy: N/C
Nature of Work: Install photovoltaic solar panels on roof
Owner: Robin Sharan Contractor: Studio 106 Electric (Gary Estes 732-4523) STUDIlE958J1
Jonathan Clemens @ Olympic Energy Systems 379-2536
GENERAL CONDITIONS APPLY -SEE NEXT PAGE
FRAMING/FINAL -install per
inspection required prior to cover
Power Rail -the mounting feet must be attached to the
building rafters or framing, not just the roof decking
Clamps -use '/: "bolts; see side view detail
Bolts -use 3/8"diameter lag bolts for the mounting feet
as shown on plans
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's
r~istration number and a City business license. Failure to provide proof of this documentation
prior to work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and
inspected prior to beginning construction; ca11385-2294. Measures shall include installation of
silt fencing and graveled construction entrance. Adjacent rights-of--way shall be kept free of dirt
& debris. Soils exposed during construction shall be temporarily stabilized with mulching,
plasfic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc.
once construction is complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall
panels (ABWP} require inspection prior to cover.
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 2
Perini[ # BLDOS-157
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by
required inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 385-2294. A
minimum of twenhr-four hours notice is required. Public Works approval must be received
prior to scheduling the Buildin¢ Department's £-nal inspection.
7. Final Inspections are required prior to occupancy. A Certificate of Occupancy is required for a
non-residential project.
8. All building permits expire if no progress has been made within six months, or if no inspections
are done by the Building Department within one year. Call for at least one inspection per year
to keep your building permit active.
9. Revisions require review and approval prior to making changes in the £-eld. Contact the
Building Department at 379-3208 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 2