Loading...
HomeMy WebLinkAboutBLD05-153Waterman & Ka[z Building 181 Quincy St., Suite 301 Port Townsend, WA 98368 Phone (360) 3793208 Fax: (360) 385-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BLDOS-153 Issued: 07/26/05 Parcel Number: 989 703 907 Job Address: 1042 Water Street Zoning: C-III Occupancy: No ChanEe Type: No Change Total Occupant Load: No Change Nature of Work: Repair and replace torchdown roof, add insulation as needed (see below). Owner: Beverly MalaEOn Contractor: Affordable Services - AFFORS*06503 NOTE: all roofing materials to be installed per manufacturer's specifications and UBC Chapter 15 GENERAL CONDITIONS APPLY -SEE LAST PAGE REQUIRED INSPECTIONS APPROVED/DATE PEDESTRIAN PROTECTION Provide protection per IBC as needed during construction. See attached handout including Table 3306.1 for type of protection needed based on construction height and pedestrian distance from construction. SEDIMENT CONTROL Rights of way shall be kept free of dirt and debris and swept as needed during construction. DEMOLITION All construction debris to be deposited in Jefferson County Landfill or other location in accordance with all local, state and federal laws. INSULATION If the roof sheeting is being replaced, the roof membrane is removed, exterior insulation is removed, or no insulation exists, fill exposed cavities. Call 48 hours before you dig far utility line locates 1-800-424-5555 Page 1 of 1 Permit #BLDOS-153 RE UIRED INSPECTIONS APPROVED/DATE SHEATHING/NAILING (if applicable) Install per manufacturer's installation instructions FLASHING Required per IBC 1503.2, primed to installation and installed per manufacturer's installation instructions. ROOF VENTING 1 sq. ft. for 150 sq. ft., or 1 sq. ft. for 300 sq. ft. if 50% of vents are located at least 3 ft. above. eave or cornice or a permanent vapor barrier is installed on warm side of attic insulation. ROOF DRAINAGE - rpof shall have min. 1% slope for drainage Roof drains shall be sized and discharged in accordance with the 2003 Uniform Plumbing Code. Parapet Coping FINAL Building Numbers - 5" numbers of contrasting color posted near main entrance of building and visible from street Final -Building GENERAL CONDITIONS t. Contractors working on this project are required to have a Labar & Industries contractor's reHistration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESL) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294. Adjacent rights-of-way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 2 Permit NBLDOS-153 6. If your project included be Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for a non-residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal & approval prior to making changes in the field. Contact the Building Department @ 379-3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 3