Loading...
HomeMy WebLinkAboutBLD05-150w.tertn.n a, rsna s.uai.¢ 181 Qa:ncy 8treeq Suite 301 Part Townsend, WA 98368 Phone: (360) 399-3208 Fez: (360) 385-]6]S CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: $I.DOJr-ISO Issued: 07/25/05 Parcel Number: 974-100-204 Job Address: 1528 Adams St. Zoning: RR=1I Type: VV_N Occupancy: U Nature of Work: Construct car sate on Adams St. & a pedestrian Qate on opposite side yard Owners: Martha Trolin & Loretta Atkins Contractor: Greenspace Landscaping **601872911** GENERAL CONDITIONS APPLY -SEE LAST PAGE RF.niJiRED INSPECTIONS APPROVED/DATE FOOTING POST HOLES FRAMING/FINAL Setbacks Fence Height House Numbers - 5" numbers of contrasting color posted near main entrance of house and visible from street per City Ordinance Final -Fence Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 2 Permi[ MBLDOS-I50 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. If temporary erosion and sediment control (TESC) measures are required, they shall be installed on-site and inspected prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of-way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass rina- inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294. A minimum of twenty-four hours notice is required. Public Works apuroval must 7. Final Inspections are required prior to occupancy; a Certificate of Occupancy is required for a non-residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal & approval prior to making changes in the field. Contact the Building Department @ 379-3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 2 o4°~A'.°~.ys,~ CITY OF PORT TOWNSEND DEVELOPMENT SERVICES DEPARTMENT ~~'~w~~°~ INSPECTION REPORT PERMIT NUMBER: ~~- D ~~ " I-5 G~ Site Address ~ ,S ~ C~ ,,~ C~YuI S Contractor Owner ,~~"`` I In S Date of Inspection ~ t`~ ` Q~ ~~ Worksite or Cell Phone# ~~ ~,~ ~~~5 ^ Erosion/Sediment Control ^ Plumbing/Top Out ^ Propane/Wood Appliance Setbacks/Footings/LIFER ^ Propane Pipe/Pressure Test ^ Manufactured Home Set-up ~^ Foundation Walls ^ Propane Tank/Line ^ Fire Department ^ Footing Drainage ^ Mechanical ^ Temporary Occupancy ^ S{ab/Interior Footing/Insulation ^ Framing ^ Fees Paid ^ Groundwork/Plumbing Test ^ Insulation ^ Final Occupancy ^ Underfloor Framing ^ Interior Shear/BWP Nail ^ OtherlConsultation ^ Ext. Shear Wall/Holdowns ^ Drywall/Fire Wall For inspections, call the Inspection Line at 360-385-2294 by 3:00 PM the day before you want the inspection; for Monday inspections call by 3:00 PM Friday. Additional fees may be assessed for multiple re-inspections if the work is not ready and the inspector must return to the site. Failure to provide inspection record and approved plans on the site will result in $47 re-inspection fee charge. (OCCUPANCY REQUIRES PRIOR WRITTEN APPROVAL BY DSD.) ^ APPROVED ^ APPROVED WITH CORRECTIONS ^ NOT APPROVED SEE BELOW SEE COMMENT(S) BELOW ~- i i ~i~„ f ~~~ Approved plans and permit card must be on-site and available at time of inspection. Inspector"~ /~ Date by Date %> /...