HomeMy WebLinkAboutBLD05-150w.tertn.n a, rsna s.uai.¢
181 Qa:ncy 8treeq Suite 301
Part Townsend, WA 98368
Phone: (360) 399-3208 Fez: (360) 385-]6]S
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: $I.DOJr-ISO Issued: 07/25/05 Parcel Number: 974-100-204
Job Address: 1528 Adams St. Zoning: RR=1I Type: VV_N Occupancy: U
Nature of Work: Construct car sate on Adams St. & a pedestrian Qate on opposite side yard
Owners: Martha Trolin & Loretta Atkins
Contractor: Greenspace Landscaping **601872911**
GENERAL CONDITIONS APPLY -SEE LAST PAGE
RF.niJiRED INSPECTIONS APPROVED/DATE
FOOTING POST HOLES
FRAMING/FINAL
Setbacks
Fence Height
House Numbers - 5" numbers of contrasting color
posted near main entrance of house and visible from
street per City Ordinance
Final -Fence
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 2
Permi[ MBLDOS-I50
1. Contractors working on this project are required to have a Labor & Industries contractor's
registration number and a City business license. Failure to provide proof of this
documentation prior to work may result in job shut down while this is accomplished.
2. If temporary erosion and sediment control (TESC) measures are required, they shall be
installed on-site and inspected prior to beginning construction; call 385-2294. Measures shall
include installation of silt fencing and graveled construction entrance (see attached details).
Adjacent rights-of-way shall be kept free of dirt debris. Soils exposed during construction
shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently
stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is
responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall
panels (ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted
by required inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass rina- inspection on your project until Public
Works requirements have been completed and inspected. For Public Works inspection call
385-2294. A minimum of twenty-four hours notice is required. Public Works apuroval must
7. Final Inspections are required prior to occupancy; a Certificate of Occupancy is required for
a non-residential project.
8. All building permits expire if no progress has been made within six months, or if no
inspections are done by the Building Department within one year. Call for at least one
inspection per year to keep your building permit active.
9. Revisions require submittal & approval prior to making changes in the field. Contact the
Building Department @ 379-3208 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 2
o4°~A'.°~.ys,~ CITY OF PORT TOWNSEND
DEVELOPMENT SERVICES DEPARTMENT
~~'~w~~°~ INSPECTION REPORT
PERMIT NUMBER: ~~- D ~~ " I-5 G~
Site Address ~ ,S ~ C~ ,,~ C~YuI S
Contractor
Owner ,~~"`` I In S
Date of Inspection ~ t`~ ` Q~ ~~
Worksite or Cell Phone# ~~ ~,~ ~~~5
^ Erosion/Sediment Control ^ Plumbing/Top Out ^ Propane/Wood Appliance
Setbacks/Footings/LIFER ^ Propane Pipe/Pressure Test ^ Manufactured Home Set-up
~^ Foundation Walls ^ Propane Tank/Line ^ Fire Department
^ Footing Drainage ^ Mechanical ^ Temporary Occupancy
^ S{ab/Interior Footing/Insulation ^ Framing ^ Fees Paid
^ Groundwork/Plumbing Test ^ Insulation ^ Final Occupancy
^ Underfloor Framing ^ Interior Shear/BWP Nail ^ OtherlConsultation
^ Ext. Shear Wall/Holdowns ^ Drywall/Fire Wall
For inspections, call the Inspection Line at 360-385-2294 by 3:00 PM the day before you want the inspection;
for Monday inspections call by 3:00 PM Friday. Additional fees may be assessed for multiple re-inspections
if the work is not ready and the inspector must return to the site. Failure to provide inspection record and
approved plans on the site will result in $47 re-inspection fee charge. (OCCUPANCY REQUIRES PRIOR
WRITTEN APPROVAL BY DSD.)
^ APPROVED ^ APPROVED WITH CORRECTIONS ^ NOT APPROVED
SEE BELOW SEE COMMENT(S) BELOW
~- i i
~i~„
f ~~~
Approved plans and permit card must be on-site and available at time of inspection.
Inspector"~ /~ Date
by
Date %> /...