HomeMy WebLinkAboutBLD05-126t,
e
Waterman & KaK Building
191 Quinq Streit, Suite 301
Pon Townsend, WA 98368
PM1One: 3fi0-3'19-5086 Fax 360-38&1605
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: BLDOS-126 Issued: 07/11/05 Parcel Number: 984601807
Job Address: 1536 Jackson St. Zoning: RR=1I Type: VV=N Occupancy: RR=3
Total Occupant Load: Nature of Work:
Expand existing deck - 350 sg, ft
Owner: George Deacon Contractor: Same as Owner
GENERAL CONDITIONS APPLY: See last pace
SEPARATE PERMITS REQUIRED:
Electrical Permit -Contact WA State Dept. of Labor & Industries 360-417-2702
RF(ITTTRFI) TNSPFC'TTtINR
A PPR O VF.1)/ll A TF.
FOOTINGS
Setbacks
Footings
Forms
Reinforcement
FLOOR FRAMING
Joists
Blocking
Positive Connections
Treated Wood to Concrete
FINAL
Smoke Detectors
Final -building
CALL 48 hours before you dig for Utility line locates
I-800-424-5555
Page 1 of 2
s,
Building Permit NBLO05-126
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor &z Industries
contractor's registration number and a City business license. Failure to provide proof of
this documentation prior to work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and
inspected prior to beginning construction; call 385-2294. Measures shall include
installation of silt fencing and graveled construction entrance (see attached details).
Adjacent rights-of-way shall be kept free of dirt debris. Soils exposed during construction
shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be
permanently stabilized with seeding, plantings, sodding, etc. once construction is complete.
Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced
wall panels (ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies
noted by required inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public
Works requirements have been completed and inspected. For Public Works inspection call
385-2294. A minimum of twenh~-four hours notice is required. Public Works aunroval
must be received prior to schedulinethe Building Department's final inspection. -
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required
for anon-residential project.
8. All building permits expire if no progress has been made within six months, or if no
inspections are done by theBuilding Department within one year. Call for at least one
inspection per year to keep your building permit active.
9. Revisions require review and approval urior to making changes in the field. Contact the
Building Department at 379-5086 prior to making changes to the approved plans.
10. PO5T THIS PERMIT ON-SITE W[TH THE APPROVED PLAN5.
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 2