HomeMy WebLinkAboutBLD05-103Building Permit # BLDOS-103
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLDOS-103 Issued: 05/17/05 Parcel Number: 989 704 301
Job Address: 626 Water Street Zoning: C-III Type: VV=N Occupancy: B
Total Occupant Load: 1 Nature of Work: Build 20 sg. ft. ticket booth for Menzies Cruises
Owner: Karen White
Contractor: Menzies Cruises
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS RE UIRED:
Electrical -Contact Labor & Industries @ 360-417-2702
NOTE: Per Temporary Use Permit LUPOS-049, structure will be removed after 6 months (or
extended a maximum of two more months with DSD approval. HPC has approved the structure.
RE UIRED INSPECTIONS
APPROVED/DATE
TEMPORARY EROSION & SEDIMENT
CONTROL
See general condition #2
FLOOR FRAMING
Anchors
FRAMING
FINAL
Electrical (L & I) Sign-Off
Building Numbers -minimum 5" numbers
Final -Building
Building Permit q BLDOS-I03
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's
registration number and a City business license. Failure to provide proof of this documentation prior to
work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected
prior to beginning construction; ca11385-2294. Measures shall include installation of silt Fencing and
graveled construction entrance (see attached details). Soils exposed during construction shall be
temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with
seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of
adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by
required inspections.
5. Re-inspection is required after any corrections are completed.
6. The Bui-ding Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection ca11 3 85-22 94; a
minimum of twenty-four hours notice is required. Public Works approval must be received prior to
scheduling the Building Department's final inspection.
7. Final Inspections and Certificate of Occupancy are required PRIOR to occupancy.
8. All building permits expire if no progress has been made within six months, or if no inspections sre
done by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require review and approval prior to making changes in the field. Contact the Building
Department 379-3208 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.