Loading...
HomeMy WebLinkAboutBLD05-103Building Permit # BLDOS-103 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLDOS-103 Issued: 05/17/05 Parcel Number: 989 704 301 Job Address: 626 Water Street Zoning: C-III Type: VV=N Occupancy: B Total Occupant Load: 1 Nature of Work: Build 20 sg. ft. ticket booth for Menzies Cruises Owner: Karen White Contractor: Menzies Cruises GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS RE UIRED: Electrical -Contact Labor & Industries @ 360-417-2702 NOTE: Per Temporary Use Permit LUPOS-049, structure will be removed after 6 months (or extended a maximum of two more months with DSD approval. HPC has approved the structure. RE UIRED INSPECTIONS APPROVED/DATE TEMPORARY EROSION & SEDIMENT CONTROL See general condition #2 FLOOR FRAMING Anchors FRAMING FINAL Electrical (L & I) Sign-Off Building Numbers -minimum 5" numbers Final -Building Building Permit q BLDOS-I03 GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; ca11385-2294. Measures shall include installation of silt Fencing and graveled construction entrance (see attached details). Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after any corrections are completed. 6. The Bui-ding Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11 3 85-22 94; a minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the Building Department's final inspection. 7. Final Inspections and Certificate of Occupancy are required PRIOR to occupancy. 8. All building permits expire if no progress has been made within six months, or if no inspections sre done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval prior to making changes in the field. Contact the Building Department 379-3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.