HomeMy WebLinkAboutBLD05-101f ~... ~ _.
- Waterman & Katz Building
' ~ 181 Qaiocy Street, Soite 301
' Port Townsend, VV'A 98368
Phone: 360-379-3208 Fax 364385-7675
CITY OF PORT TOWN5END
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: $LDO$-lOI Issued: 07/29/05 Parcel Number: 988 800101
Job Address: 940 Lawrence.Street Zoning: C-III
Construction Type: V 1-hr. fully sprinklered Occupancy: M/A-3/R-1/S-1
Total Occupant Load: No Chance Use of Building: Retail/Residential
Nature of Work: Install two (2) awnines, one wraps around Tyler/Lawrence Street with
"Aldrich's Market" logo; the other is in front of door on east side into elevator shaft for
upstairs residential units.
Owner: Retail Services Inc.
Contractor: Custom Desi¢n Inc. - CDICUCD950KW (800) 382-4877
GENERAL CONDITIONS APPLY -SEE LAST PAGE
RF,OTJTRF,D TNSPF.CTTONS
FRAMING
Attach each `/4" curved aluminum awning
frame to building wood frame members with
two 3/8" x 4" galvanized lag screws every 4'
staggered top & bottom with minimum 3" ~ ~~ 1 ~~~
embedment, 1-1/2" min. edge distance and
i
i
t
h
d d
S _
N[] ~~--~SQP~I ~ 'O
raw
ngs.
spac
ng.
ee a
tac
e
FINAL
See original inspection record and TCO
conditions.
APPROVED/DATE
t ~.
Ca1148 hours before you dig for Utility line locates
1-800 424-5555
Page 1 of 1
f ^ ~
PermitkBLD05-101
• GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries
Contractor's Registration Number and a City Business License. Failure to provide proof of
this documentation PRIOR to work may result in job shutdown while this is accomplished.
2. TESC -Temporary erosion and sediment control measures shall be installed on-site and
inspected prior to beginning construction; ca11385-2294. Measures shall include installation of
silt fencing and graveled construction entrance (see attached details). Soils exposed during
construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be
permanently stabilized with seeding, plantings, sodding, etc., once construction is complete.
Applicant is responsible for protection of adjacent properties.
3. All engineered elements including sheathing, nailing, holdowns, ABWP's (alternate braced
wall panels), etc., requires inspection PRIOR to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies
noted by required inspections.
5. Re-inspection is required after Inspection Report corrections are completed.
6. The Building Department is unable to pass Final Inspection on your project until Public
Works requirements have been completed and inspected. For Public Works inspection call
385-2294. A minimum of 24 hours notice is required. Public Works approval must be received
prior to schedulin¢ the Buildin¢ Department's Final Inspection or issuin¢ a Temporary
Certificate of Occupancy.
7. Final Inspection and Certificate of Occupancy required PRIOR to occupancy.
8. All building permits expire if no progress has been made within six months, or if no
inspections are done by the Building Department within one year. Call for at least one
inspection per year to keep your building permit active.
9. Revisions require submittal & approval prior to making changes in the field. Contact the Building
Department @ 379-3208 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Call 48 hours before you dig for Utility line locates
1-800 424-5555
Page 2 of 2