Loading...
HomeMy WebLinkAboutBLD05-101f ~... ~ _. - Waterman & Katz Building ' ~ 181 Qaiocy Street, Soite 301 ' Port Townsend, VV'A 98368 Phone: 360-379-3208 Fax 364385-7675 CITY OF PORT TOWN5END CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: $LDO$-lOI Issued: 07/29/05 Parcel Number: 988 800101 Job Address: 940 Lawrence.Street Zoning: C-III Construction Type: V 1-hr. fully sprinklered Occupancy: M/A-3/R-1/S-1 Total Occupant Load: No Chance Use of Building: Retail/Residential Nature of Work: Install two (2) awnines, one wraps around Tyler/Lawrence Street with "Aldrich's Market" logo; the other is in front of door on east side into elevator shaft for upstairs residential units. Owner: Retail Services Inc. Contractor: Custom Desi¢n Inc. - CDICUCD950KW (800) 382-4877 GENERAL CONDITIONS APPLY -SEE LAST PAGE RF,OTJTRF,D TNSPF.CTTONS FRAMING Attach each `/4" curved aluminum awning frame to building wood frame members with two 3/8" x 4" galvanized lag screws every 4' staggered top & bottom with minimum 3" ~ ~~ 1 ~~~ embedment, 1-1/2" min. edge distance and i i t h d d S _ N[] ~~--~SQP~I ~ 'O raw ngs. spac ng. ee a tac e FINAL See original inspection record and TCO conditions. APPROVED/DATE t ~. Ca1148 hours before you dig for Utility line locates 1-800 424-5555 Page 1 of 1 f ^ ~ PermitkBLD05-101 • GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries Contractor's Registration Number and a City Business License. Failure to provide proof of this documentation PRIOR to work may result in job shutdown while this is accomplished. 2. TESC -Temporary erosion and sediment control measures shall be installed on-site and inspected prior to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc., once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All engineered elements including sheathing, nailing, holdowns, ABWP's (alternate braced wall panels), etc., requires inspection PRIOR to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after Inspection Report corrections are completed. 6. The Building Department is unable to pass Final Inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294. A minimum of 24 hours notice is required. Public Works approval must be received prior to schedulin¢ the Buildin¢ Department's Final Inspection or issuin¢ a Temporary Certificate of Occupancy. 7. Final Inspection and Certificate of Occupancy required PRIOR to occupancy. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal & approval prior to making changes in the field. Contact the Building Department @ 379-3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Call 48 hours before you dig for Utility line locates 1-800 424-5555 Page 2 of 2