HomeMy WebLinkAboutBLD05-094~ s CITY OF PORT TOWNSEND peveloproent Services Geparhnent 250 Madison Street, Sui[e 3 Port Townsend, WA 98368 Phone: (360) 379-3208 Pax: (360) 344-0619 CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE For Next Day Inspection Ca11385-2294 Before 3P.M. ~. ~, Permit Number: BLDOS-094 Issued: 9/7/06 Job Address: 1703 Taylor Ln. Zoning: RR^II Nature of Work: Construct single-family residence Owners: C.L. Flint/Garrison GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REQUIRED: Electrical -Contact Labor & Industries @ 360-417-2702 Parcel Number: 970 101 101 Type: VV=B Occupancy: R-3 Contractor: Need NOTE: ACQUAINT YOURSELF WITH THE LISTED REQUIRMENTS TO RECEIVE FINAL BUILIDNG INSPECTION PRIOR TO THE START OF CONSTRUCTION AND PRIOR TO YOUR REQUEST FOR FINAL INSPECTION. *** Al[ elements of engineering including holdowns, framing, nailing and other engineering connections require inspection prior to cover. *** RF.IIiiiRFTI iNCPFf'TiONS APPRnVF,D/DATF. TEMP EROSION & SEDIMENT CONTROL See General Condition No. 2 Silt Fence as needed Drive Off Mat to restrict sediment from leaving the site FOOTINGS Setbacks Footings Reinforcement Holdowns MUST BE TIED IN PLACE NO WET STICKING) Anchor Bolts & Washers LIFER Ground (tied to footing rebar steel) Interior Pads Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page t oT 4 Permit #BLDOS-094 PLUMBING: Rough-In (D-V-T & Clean outs) Water Supply Water Hammer Arrester (on dishwasher, ice maker & clothes washer) Hose Bibs (backflow protection required) Pipe Insulation (R-3) Pressure Reduction Valve required Water Heater Seismic Restraint -strap tank ~ 1/3 points Pressure relief valve drain to exterior, terminate 6"-24" above ground Expansion tank Licensed Plumbing Contractor's Signature & License Number• Sign here Shear wall nailing (TO BE INSPECTED & APPROVED PRIOR TO COVERING) MECHANICAL Whole House Fan W/ 2A hour timer Kitchen/Bath/Laundry Fans Environmental Air Exhaust ducting (w/ back draft dampers), Insulation (R-4) (on duating in unheated space) LPG Tank LPG Piping LPG Stove LPG Heater FRAMING -alt members and connections require inspection prior to cover Fasteners hangers etc. in contact with treated material must be hot dipped galvanized Walls Headers Rafters (hurricane clips) Roof Sheathing Joists (hangers) Cable X-Bracing Blocking Stairs Roof Venting - eave and ridge vents Windows -egress Smoke detectors (bedrooms, outside bedrooms and each floor) Safety Glazing W indows U factor - .40 or better Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 4 i Permit #BLDOS-094 Doors U-factor-.20 or better NFRC window sticker must be on window, skylights & doors at insp. time. Air Seal Fire Blocking Weather Resistive Barrier INSULATION Floor (R-10) Walls (R-21) Vault (R-30) Vapor Barrier: paint for walls and ceiling Baffles DRYWALL PUBLIC WORKS FINAL - SDP06-050 Public Works Si n-Off rior to buildin final FINAL Parking-2 space required House Numbers - 5" minimum Plumbing Mechanical/Heating LPG Vapor Barrier Paint Certificate i Insulation Certificate Smoke Detectors Final -Building Ca1148 hours before you dig for utility line locates I-800-424-5555 Page 3 of 4 Permit#BLDOS-094 CFNERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of-way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294. A minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the Building Department's final inspection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non- residential project. 8. Revisions require submittal and approval prior to making changes in the field. Contact the Building Department (379-3208) prior to making changes to the approved plans. 9. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. APPLICANT SIGNATURE DATE Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 4 of 4 i ~ of°~pTrOw CITY OF PORT TOWNSEND o DEVELOPMENT SERVICES DEPARTMENT '"_" INSPECTION REPORT ~ • ` ~~wn Far inspections, call the Inspection Line at 360-385-2294 by 3:00 PM the day before yon want the inspection. For Monday inspections, call by 3:00 PM Friday. DATE OF INSPECTION: PERMIT NUMBER: ~ - ~ SITE ADDRESS: r ~ PROJECT NAME: T~ ~ l y1 j-- CO`N~RACTOR: CONTACT PERSON: V (? r h PHONE: ~-] q ~, ~j ~~ TYPE OF INSPECTION: 1~~~ ~,~( ~ ___ ~ ~ i , - - ~ ,i_ ~r ~, / C APPROVED ^ APPROVEDW'ITH ^ NOT APPROVED CORRECTIONS - - Ok to proceed. Corrections will be Call for re-inspection before checked at nextinspection proceeding. .r _ ~ Inspector r Date _ ' ~'_ j Approved plans and permit card must be on-site and availahle at time of inspection. fl re-inspection fee may be assessed if work is not read}~ for inspection.