HomeMy WebLinkAboutBLD05-067
Wa[em~an & Katz Building
181 Quincy Sheet, Suire 301
Port rownsend, WA 98368
Phone: (360) 379-3208 Fax: (360) 385-7675
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: BLDOS-O67 Issued: 03/30/05 Parcel Number: 001013 001
Job Address: 50 Point Hudson ( former Motel building) Zoning: M-II(B) Type: V=N
Occupancy: Formerly R-1 (Used as a Motel)
Nature of Work: Replace any damaged sheathing, install underlayment and metal panels, and
provide adequate ventilation.
Owner: Port of Port Townsend Contractor: Parker Enternrises - PARKEE*045K9
(437-0612)
NOTE: Repair/replacement of roof structural members (e.g., roof rafters, joists,
truss system, etc.) requires revision to this permit All materials shall be installed
per the manufacturer's installation instructions and IBC Chapter I5.
GENERAL CONDITIONS APPLY- SEE LAST PAGE
RF,niTiRED INSPECTIONS
APPROVED/DATE
DEMOLITION
All construction debris to be deposited in Jefferson
County Landfill or other location in accordance with
all local, state and federal laws.
SHEATHING
Nailing requires 8d @ 6" o.c. edges & 12" o.c. field or
1 '/4" staples @ 6" o.c. edges and field.
ROOF VENTING
Net free ventilation area shall not be less than 1 square
foot per 150 square feet of the area of the space
ventilated, unless 50% of the required vent opening
area is provided in the upper portion of the roof and
therefore the rate may be reduced to 1 squaze foot of
venting to 300 square feet of area vented. Openings
shall be covered with corrosion resistant ''/apt mesh.
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 2
Permit iteLDOS067
FINAL
Building Numbers - 5" numbers of contrasting color
posted near main entrance of house and visible from
street per City Ordinance
Final -Building
ENERAL CONDITION
1. Contractors working on this project are required to have a Labor & Industries contractor's re¢istration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. If temporary erosion and sediment control (TESL) measures are required, they shall be installed on-site
and inspected prior to beginning construction; call 385-2294. Measures shall include installation of silt
fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept
free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching,
plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once
construction is complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection ca11385-2294. A
minimum of twenty-four hours notice is required. Public Works auuroval must be received prior to
scheduling the Buildine Department's final inspection.
7. Final Inspections are required prior to occupancy; a Certificate of Occupancy is required fora non-
residential project.
8. All building permits expire if no progress has been made within six months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal & approval prior to making changes in the field. Contact the Building
Department @ 379-3208 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
CaI148 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 2
CERTIFICATE OF REVIEW
and
FINDINGS OF THE HISTORIC PRESERVATION COMMCI'TEE
Design Review Application HPCOS-013. Port of Port Townsend
The Port Townsend Historic Preservation Committee has completed its design review of the:
Repair of roof at Pt. Hudson Motel using standing metal seam material, colored
stone grey.
Representative: City staff
The building classification: (highlight one):
Pivotal Primary Secondary Altered Historic/Recent Compatible Intrusion
Review of the project is: Mandatory
Compliance with review is: (circle one) Mandatory Voluntary
The review was conducted pursuant to Chapter 17.30 of the Port Townsend Municipal Code, and
was based on the application submitted on March 29.2005
HPC Subcommittee: None
Applicable Guidelines: Secretary of the Interior GL's for Rehabilitation, PT Urban
Waterfront GL's, Point Hudson sub-district GL's
After review of relevant design guidelines; the Historic Preservation Committee finds that the
proposed development: (circle one)
CONTRIBUTES IS ACCEPTABLE DOES NOT CONTRIBUTE
to the Port Townsend Historic District AS PRESENTED, subject to the following
conditions/limitations:
Issued this ~~~~ day of ~,_ 7L~,
m~3~N, asp
isapproved by
Chair, Historic Preservation Committee
DSD Director or designee
Bcd_Permits: Form Lel(ers2
Paze ! of 1-Revised !2/98