Loading...
HomeMy WebLinkAboutBLD05-067 Wa[em~an & Katz Building 181 Quincy Sheet, Suire 301 Port rownsend, WA 98368 Phone: (360) 379-3208 Fax: (360) 385-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BLDOS-O67 Issued: 03/30/05 Parcel Number: 001013 001 Job Address: 50 Point Hudson ( former Motel building) Zoning: M-II(B) Type: V=N Occupancy: Formerly R-1 (Used as a Motel) Nature of Work: Replace any damaged sheathing, install underlayment and metal panels, and provide adequate ventilation. Owner: Port of Port Townsend Contractor: Parker Enternrises - PARKEE*045K9 (437-0612) NOTE: Repair/replacement of roof structural members (e.g., roof rafters, joists, truss system, etc.) requires revision to this permit All materials shall be installed per the manufacturer's installation instructions and IBC Chapter I5. GENERAL CONDITIONS APPLY- SEE LAST PAGE RF,niTiRED INSPECTIONS APPROVED/DATE DEMOLITION All construction debris to be deposited in Jefferson County Landfill or other location in accordance with all local, state and federal laws. SHEATHING Nailing requires 8d @ 6" o.c. edges & 12" o.c. field or 1 '/4" staples @ 6" o.c. edges and field. ROOF VENTING Net free ventilation area shall not be less than 1 square foot per 150 square feet of the area of the space ventilated, unless 50% of the required vent opening area is provided in the upper portion of the roof and therefore the rate may be reduced to 1 squaze foot of venting to 300 square feet of area vented. Openings shall be covered with corrosion resistant ''/apt mesh. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 2 Permit iteLDOS067 FINAL Building Numbers - 5" numbers of contrasting color posted near main entrance of house and visible from street per City Ordinance Final -Building ENERAL CONDITION 1. Contractors working on this project are required to have a Labor & Industries contractor's re¢istration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. If temporary erosion and sediment control (TESL) measures are required, they shall be installed on-site and inspected prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294. A minimum of twenty-four hours notice is required. Public Works auuroval must be received prior to scheduling the Buildine Department's final inspection. 7. Final Inspections are required prior to occupancy; a Certificate of Occupancy is required fora non- residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal & approval prior to making changes in the field. Contact the Building Department @ 379-3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. CaI148 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 2 CERTIFICATE OF REVIEW and FINDINGS OF THE HISTORIC PRESERVATION COMMCI'TEE Design Review Application HPCOS-013. Port of Port Townsend The Port Townsend Historic Preservation Committee has completed its design review of the: Repair of roof at Pt. Hudson Motel using standing metal seam material, colored stone grey. Representative: City staff The building classification: (highlight one): Pivotal Primary Secondary Altered Historic/Recent Compatible Intrusion Review of the project is: Mandatory Compliance with review is: (circle one) Mandatory Voluntary The review was conducted pursuant to Chapter 17.30 of the Port Townsend Municipal Code, and was based on the application submitted on March 29.2005 HPC Subcommittee: None Applicable Guidelines: Secretary of the Interior GL's for Rehabilitation, PT Urban Waterfront GL's, Point Hudson sub-district GL's After review of relevant design guidelines; the Historic Preservation Committee finds that the proposed development: (circle one) CONTRIBUTES IS ACCEPTABLE DOES NOT CONTRIBUTE to the Port Townsend Historic District AS PRESENTED, subject to the following conditions/limitations: Issued this ~~~~ day of ~,_ 7L~, m~3~N, asp isapproved by Chair, Historic Preservation Committee DSD Director or designee Bcd_Permits: Form Lel(ers2 Paze ! of 1-Revised !2/98