HomeMy WebLinkAboutBLD05-039Waterman & Katz Building
181 Quincy Street, Suite 301
Port Townsend, WA 98368
Phone: (360)394-3057 Rax: (360)385-7675
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: BLD~S-039
Job Address: 825 Water Street
Issued: 05/03/05 Parcel Number: 989 700 806
Zoning: C=III Type: VV=N Total Occupant Load: No Chance
Occupancy: A-3 Nature of Work: Temporary Repairs to Siren's Deck
Owner: G. Rodney Johnson Contractor: Owner -see General Condition #1
****All elements of engineering require inspection prior to cover****
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Electrical -Contact Labor & Industries @ 360-417-2702
NOTE: Temporary repairs appear to be adequate through the month ofAugust, 2005. Final repairs
must be in place by that time. Engineered plans for the fnal design shall be submitted to the
Development Services Departmentfor review and approval.
***Until Au¢ust 2005 when final repairs are in place, the en¢ineer of record, i.e. Ryan Tillman or
Kelly Conrad, shall inspect the deck structure and its foundation on a weekly basis, and the
inspection report shall be submitted to the City.***
COLUMN #2
Brace: 6 x 6 diagonal (Pressure treated)
(2) ''/z" x 8" lags @ top
(2)'/z" Titen Anchors (Simpson) embedded min. 4" into (E)
concrete
Column Reinforcing - Post to bear on (E) concrete
4 x 8 Post min. 8' long (Pressure treated)
(2) %" lags embedded min. 3-1/2" into (E) 6 x 8 @ 3 places
per engineered drawing SK2
''/a" Titen holdown anchor embedded min. 4" into concrete pier
Call 48 hours before you dig for utility line locates
I-800-424-5555
Page 1 of3
• ~ Permit k BLDOS-039
RF.f1TTTRFT) TNSPF.C'TTONS
APPROVED/DATE
COLUMN #3
Brace: 6 x 6 diagonal (Pressure treated)
(2)'/z" x 8" lags @ top
(2) ''/z" Titen Anchors (Simpson) embedded min. 4" into (E)
concrete
Column Reinforcing -post to bear on (E) concrete
4 x 6 Post min. 8' long (Pressure treated) each side of (E) 6 x 8
(2) %z" lags embedded min. 3" into (E) 6 x 8 on each side @ {3)
places per engineered drawings SK3
LOWER DECK FRAMING -all deck framing members shall be
pressure treated
4 x 12 @ 20" o.c.
Block @ bearing and center span, typ. each column bay per
engineered drawing SKI
'/<" CDX T&G subfloor
Landing and step @ raised floor
UPPER DECK FRAMING -permitted to use maximum 5' deck
width
New guardrail per code -min. 42"
Brace to add load support (see attached loading specs)
'/<" through-bolts into (E) deck ledger for total of (18) per engineered
detail, sheet SK4
FINAL -path of exit travel to Taylor Street shall remain clear and
unobstructed,' entire exit way shall be illuminated at all times that
building is occzzpied
Building Numbers -minimum Y' numbers
Deck
Landings
Steps
Handrails
Guardrails
Final -Building
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 3
. Q •
Permit # BLDOS-039
GF.NFRAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's registration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior
to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled
construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils
exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils
shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete.
Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, boldowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection ca11385-2294. A
minimum of twenty-four hours notice is required. Public Works approval must be received prior to
scheduling the Building Department's final inspection.
7, Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non-
residential project.
8. All building permits expire if no progress has been made within six months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal and approval prior to making changes in the field. Contact the Building
Department (379-3208) prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Ca1148 hours before you dig for utility line locates
I-800-424-5555
Page 3 of 3
~~
(r
1
p4~pRT1p~h~ CITY OF PORT TOW~END
-• DEVELOPMENT SERVICES DEPARTMENT
'~ - ~' INSPECTION REPORT
~ WAg~
PERMIT NUMBER: ~ L~ ~ ~ ' U3 ~ ~ ~ ~
Site Address ~ Z ~ (ri{1l~ f-~ ~~~ • _ GY ~ ,j (~t~ /
Contractor ~ ~ (~ --7U~so ~ J
Owner ~ ~ ' t'1 ~ U ~ ~J C1 ` -~ ~~'
Date of Inspection ~ U l~ 6 J)
2 G G?L-l~4l-~ /
Worksite or Cell Phone# S ~ ~ ~ ~ ~ C~/~
^ Erosion/Sediment Control
^ Setbacks/Footings/LIFER
^ Foundation Walls
^ Footing Drainage
^ Slab/Interior Footing/Insulation
^ Groundwork/Plumbing Test
^ Underfloor Framing
^ Ext. Shear Wall/Holdowns
^ Plumbing/Top Out
^ Propane Pipe/Pressure Test
^ Propane Tank/Line
^ Mechanical
Framing
^ Insulation
^ Interior Shear/BWP Nail
^ Drywall/Fire Wall
^ Propane/Wood Appliance
Manufactured Home Set-up
^ Fire Department
^ Temporary Occupancy
Fees Paid
Final Occupancy
^ Other/Consultation
For inspections, call the Inspection Line at 360-385-2294 by 3:00 PM the day before you want the inspection;
for Monday inspections call by 3:00 PM Friday. Additional fees may be assessed for multiple re-inspections
if the work is not ready and the inspector must return to the site. Failure to provide inspection record and
approved plans on the site will result in $47 re-inspection fee charge. (OCCUPANCY REQUIRES PRIOR
WRITTEN APPROVAL BY DSD.)
^ APPROVED~~ ^ APPROVED WITH CORRECTIONS ^ NOT APPROVED
• SEE BELOW SEE COMMENT(S) BELOW
i
.. ~ _ __ .
r
f
~, . ,~
~_.
-~- 1 ~ 3," ~ .. ,.I r/
1. -
~, / i ~ ~ ~.
• ' ~ I
/ r r -.
r
Inspector r • ' ~ ~_ :. I, .' ~ ,_ ~, Date ~~ / , r ~ -
Acknowledged bye ~ ~.~-„ ~~>! _ '~ Date "+~ %~
Approved plays and permit card must be on-site and available at time of inspection.
1.
aFpoAr.o~rys~ CITY OF PORT TOW~END
- - - DEVELOPMENT SERVICES DEPARTMENT
v
a'wasH'~
~~ INSPECTION REPORT
PERMIT NUMBER. IJ t-~O i - (J3 ~ ~ ""~
Site Address ~ ` ~ ~~~~~~-)`Y~ ~~
Contractor _ -- ' -
Owner
Date of Inspection
Worksite or Cell Phone#
^ Erosion/Sediment Control
Setbacks/Footings/LIFER
^ Foundation Walls
^ Footing Drainage
^ Slab/Interior Footing/Insulation
~ ~" / r,~
^ Plumbing/Top Out
^ Propane Pipe/Pressure Test
^ Propane Tank/Line
^ Mechanical
^ Propane/Wood Appliance
Manufactured Home Set-up
Fire Department
Temporary Occupancy
Fees Paid
^ Framing
^ Groundwork/Plumbing Test ^ Insulation ^ Final Occupancy
^ Underfloor Framing ^ Interior Shear/BWP Nail ~ ther/Consultation
^ Ext. Shear Wall/Holdowns ^ Drywall/Fire Wall L-2Rtt
Additional fees may be assessed for multiple re-inspections. For Re-inspection, call Inspection M sage
Line at (360) 385-2294 prior to 8:D0 AM. (NO OCCUPANCY UNTIL APPROVED BY DSD.
OCCUPANCY REQUIRES WRITTEN APPROVAL BY DSD.)
.APPROVED ^ APPROVED WITH CORRECTIONS ^ NOT APPROVED
SEE BELOW SEE COMMENT(S) BELOW
,~,. ~%
-, ~
Approved plans and permit card must be on-site and available at time of inspection.
G
Inspector ~' Date
Acknowledged by Date