Permit Number: BLDOS-O34 Issued: 03/03/05 Parcel Number: 001-013-001
Job Address: 227 Jackson Street Zoning: M-II(B) Type: V=N Occupancy: B
Total Occupant Load: No Chance
Nature of Work: Install dividing wall to create separation between ferry passenger waiting area and storage
room in existing building: install propane stove, tank and piping.
Owner: Port of Port Townsend Tenant: Puget Sound Express
Contractor: Tenant, and Mountain Propane (for propane portion)
GENERAL CONDITIONS APPLY -SEE LAST PAGE
SEPARATE PERMITS REQUIRED:
Electrical -Contact Labor & Industries @ 360-417-2702
Note: Location of propane tanks approved through HPCOS-006
REOUIRF,D INSPECTIONS
FRAMING
Walls
Positive Connections @ ceiling and slab
all fasteners in contact with pressure-treated wood must
be hot-dipped galvanized
Blocking
Fire Blocking
DRYWALL
Walls
Ceiling
.
LPG
i . - T ,- , ~ ., ~ . ,~ ,.
~ _
-
~
i
- - %
APPROVED/DATE
~'
~~___
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 1
Pem~it #BLDOS034
IL'
FINAL
Property address posted-min. 5"numbers
Electrical Sign-off (L & I) if applicable
Barrier Free Access
Thresholds
Door Clearances
Lever Hardware
Exit Signage & Illumination
LPG
Final -Building
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's reeistration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior
to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled
construction entrance (see attached details). Adjacent rights-of-way shall be kept free of dirt debris. Soils
exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils
shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete.
Applicant is responsible far protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection ca11385-2294. A
minimum of twenty-four hours notice is required. Public Works approval must be received prior to
scheduline the Building Department's final inspection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non-
residential project.
8. All building permits expire if no progress has been made within six months, or if no inspecfions are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal & approval prior to making changes in the field. Contact the Building
Department @ 379-3208 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 2
°~'°p"°`~2s~ CITY OF PORT TOWNSEND PUBLIC WORKS &
U DEVELOPMENT SERVICES DEPARTMENT
9 g =
~OFWASMa° INSPECTION REPORT
(~ ~~
1j
L ~~u. c t~
- ~.~
5`
PERMIT NUMBER:
Address
Contractor
Owner
L w ~-
~- . ~-~u c~Sc~
`~~ 1 -~-r~lc.~,
Date of Inspection
Worksite or Cell Phone#
^ Erosion/Sedimentation
^ Setbacks/Footings/LIFER
^ Foundation Walls
Slab Interior Footing/Insulation
^ Groundwork/Plumbing Test
^ Underfloor Framing
Shear Wall/Holdowns
o(~~~
^ Plumbing/Top Out Drywall/Fire Wall
Gas Pipe/Pressure Test ^ Gas/Wood Appliance
^ Propane Tank/Line ^ Manufactured Home Set-up
^ Mechanical ^ Public Works
^ Framing ^ Other/Consultation
^ Insulation
0 Interior Shear/BWP Nail ^ FINAL
If corrections required, re-inspection must be done prior to covering or concealing areas
of construction. Additional fees may be assessed for multiple re-inspections.
For Re-inspection, call Inspection Message Line at (360) 385-2294 prior to 8:00 AM.
NO OCCUPANCY UNTIL FINALIZED BY BUILDING AND, IF APPLICABLE, PUBLIC WORKS.
VIOLATION ' PROVAL ^ CORRECTION REQUIRED
APPROVED WITH CORRECTION '^ NEED APPROVED PLANS & PERMIT ON SITE
Approved plays and~perrwit ca5d must be on-site and available at time of inspection.
~ ~ ~ : -~
/s. , ~y,~ ~'" Date `-= ~a~- ,~ ~S
Inspector ~~~ ^~
~~Ln~%S -o.3y
2Z7 `1~~ c~~v~ S-~
°~°~p"°""~sF CITY OF PORT TOWNSEND PUBLIC WORKS &
° DEVELOPMENT SERVICES DEPARTMENT
~OFWASMH INSPECTION REPORT
~,
~~~1~-k
6
n / .
r)\ ~ ~ ~
L
~~ ~ ~ ~
PERMIT NUMBER: ~~ ~-L~-7~ ' ~'-' 7
Address ~ -'- ~ /' ~J cL ~~~-~~C" -5~.
Contractor r ~- ~, f ~~~"? ~~'
Owner ~ ~~S C. ~ ~'rfS J
Date of Inspection
ilk ~~ .
L. G ; ~,~ t Worksite or Cell Phone#
~ ^ Erosion/Sedimentation
^ Setbacks/Footings/LIFER
^ Foundation Walls
^ Slab lnterior Footing/Insulation
^ Groundwork/Plumbing Test
Underfloor Framing
Shear Wall/Holdowns
l!
Plumbing/Top but
Gas Pipe/Pressure Test
^ Propane Tank/Line
^ Mechanical j )~ ~-~-; ~: ~-
~'l Framing Lc:
^ Insulation
J Interior Shear/BWP Nail
~^ Cl / ~ C~
~~
_] Drywall/Fire Wall
^ Gas/Wood Appliance
^ Manufactured Home Set-up
^ Public Works
^ Other/Consultation
^ FINAL
If corrections required, re-inspection must be done prior to covering or concealing areas
of construction. Additional fees may be assessed for multiple re-inspections.
For Re-inspection, call Inspection Message Line at (360) 385-2294 prior to 5:00 AM.
NO OCCUPANCY UNTIL FINALIZED BY BUILDING AND, IF APPLICABLE, PUBLIC WORKS.
^ VI ATION ^ APPROVAL ^ CORRECTION REQUIRED
APPROVED WITH CORRECTION ^ NEED APPROVED PLANS & PERMIT ON SITE
Approved plays a~iy~ permit
be on-site and available at time of inspection.
Inspector ~f~n ~ ~ Date f~~S~ ~1
°~°p0.TT°""~sm CITY OF PORT TOWNSEND PUBLIC WORKS &
DEVELOPMENT SERVICES DEPARTMENT
9~OFWPSM~U4° INSPECTION REPORT
PERMIT NUMBER: ~ ~~ D.S ~ d~.3"~
Address r~ ~ ~ ~ ~~ ~« [~1~-~
Contractor
Owner
Date of Inspection J 'S ~ ~ - ~~ y
Worksite or Cell Phone# L~LOV `~d ~ ' ~C~
:] Erosion/Sedimentation ~ Plumbing/Top Out > Drywall/Fire Wall
^ Setbacks/Footings/LIFER ^ Gas Pipe/Pressure Test ^ Gas/Wood Appliance
^ Foundation Walls ^ Propane Tank/Line ^ Manufactured Home Set-up
^ Slab Interior Footing/Insulation ^ Mechanical
^ Public Works
^ Groundwork/Plumbing Test ^ Framing ^ Other/Consultation
^ Underfloor Framing U Insulation
^ Shear Wall/Holdowns ~nterior Shear/BWP Nail ^ FINAL
If corrections required, re-inspection must be done prior to covering or concealing areas
of construction. Additional fees may be assessed for multiple re-inspections.
For Re-inspection, call Inspection Message Line at (360) 385-2294 prior to 8:00 AM.
NO OCCUPANCY UNTIL FINALIZED BY~BDING AND, IF APPLICABLE, PUBLIC WORKS.
^ VIOLATION Al PPROVAL ^ CORRECTION REQUIRED
^ APPROVED WITH CORRECTION ~ NEED APPROVED PLANS & PERMIT ON SITE
Approved ph'hs n permit c d must be on-site and available at time of inspection
Inspector I ~ . ~? Date 5 ~ ~' ~
CERTIFICATE OF REVIEW
and
FINDINGS OF THE HISTORIC PRESERVATION COMMITTEE
Design Review Application HPCOS-006
The Port Townsend Historic Preservation Committee has completed its design review of the:
Installation of two (2) 125-gallon propane tanks behind the Puget Sound Express building
(former Pygmy Kayak building).
proposed by: Pete Hanke
Representative: same
for the building located at: Puget Sound Express building, 227 Jackson Street
with significance classified as (circle one)
Pivotal Primary Secondary Altered Historic/Recent Compatible Intrusion
Review of the project is: Mandatory
Compliance with review is: (circle one) Mandatory Voluntary
The review was conducted pursuant to Chapter 17.30 of the Port Townsend Municipal Code, and
was based on the application reviewed on 2/15/03
After review of relevant design guidelines, the Committee found that the proposed development:
(circle one)
CONTRIBUTES IS ACCEPTABLE DOES NOT CONTRIBUTE
to the Port Townsend Historic District AS PRESENTED.
Issued this 21st day of February, 2005
A rove
Disapproved
(circle one)
'hair, Historic Preservation Committee
a~5 ~
B8D Direct r (or designee)
Bcd_Perm i[s: I I BCD_PERMITS I HIHPCI CERTIFICMERCE. DOC