Loading...
HomeMy WebLinkAboutBLD05-026Waterman & Katz Building 18l Quincy Street, Suite 301 Port Townsend, WA 98368 Phone: 360-379-5086 Fax 360-385-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLDOS-O26 Issued: 02/25/05 Parcel Number: 101344 003 Job Address: 3939 San Juan Avenue Zoning: PP=I Type: VV=N Occupancy: U Nature of Work: Construct 1s1 base and 3~d base dUEOUtS plus storage attached to 3~d base at Blue Herou School, Girls Softball field. Owner: Port Townsend School District Contractor: Owner GENERAL CONDITIONS APPLY: See last pace SEPARATE PERMITS REQUIRED: Electrical Permit -Contact WA State Dept. of Labor & Industries 360-417-2702 RF,OUiRED INSPECTIONS APPROVED/DATE TEMP EROSION & SEDIMENT CONTROL See General Condition No. 2 Silt Fence as needed MONOLITHIC SLAB Setbacks Footings Slab Reinforcing Steel FRAMING Fasteners hangers etc. in contact with treated material must be hot dipped galvanized Walls Roof Posts Beam Brace Positive Connections Treated Wood to Concrete CALL 48 hours before you dig for Utility line locates 1-800-424-5555 Page 1 of 2 Building Permit NBLDOS-026 1 N. FINAL Landings Lever Hazdwaze on door Final -building GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's reeistration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294. A minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the BuildinE Department's final inspection. 7. Final Inspections. are required prior to occupancy; A Certificate of Occupancy is required for a non-residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require review and approval prior to making changes in the field. Contact the Building Department at 379-5086 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 2 °F°°p"°~"~Sm= CITY OF PORT TOWNSEND PUBLIC WORKS & ° _=- = DEVELOPMENT SERVICES DEPARTMENT ~_..~ °10 F°f y~pSN~~ INSPECTION REPORT PERMIT NUMBER: l~~ Address ~/ Contractor Owner Date of Inspection ~~ SC~-I T Uwn-~- 1)i ~~~ -~ S Worksite or Cell Phone# ^ Erosion/Sedimentation ~ Setbacks/Footings/LIFER ^ Foundation Walls ^ Slab Interior Footing/Insulation ^ Groundwork/Plumbing Test C ,) Plumbing/Top Out Gas Pipe/Pressure Test ^ Propane Tank/Line ^ Mechanical ^ Framing ^ Drywall/Fire Wall ^ Gas/Wood Appliance J Manufactured Home Set-up Public Works Other/Consultation ^ Underfloor Framing ^ Insulation ^ Shear Wall/Holdowns ^ Interior Shear/BWP Nail FINAL ' L -] C` ~/ ~ If corrections required, re-inspection must be done prior to covering or concealing areas of construction. Additional fees may be assessed for multiple re-inspections. For Re-inspection, call Inspection Message Line at (360) 385-2294 prior to 8:00 AM. NO OCCUPANCY UNTIL FINALIZED BY BUI G AND, IF APPLICABLE, PUBLIC WORKS. ~ VIOLATION PPROVAL ^ CORRECTION REQUIRED ^ APPROVED WITH CORRECTION J NEED APPROVED PLANS & PERMIT ON SITE Approved Inspector be on-site and available at time of inspection. Date ,~ 6~ ~~