HomeMy WebLinkAboutBLD05-016
CITY OF PORT TOWNSEND
Waterman & Katz Building
181 Qvinay Sheet, Svite 301
Port ivwnsend, WA 98368
Phone: (360) 374-3208 Fnx: (360) 3857675
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number; BLDOS-016 Issued: 02/Ol/OS Parcel Number: 988 SOl 404
Job Address: 918 Taylor Street Zoning: RR=II Type: VV=N Occupancy: R_3
Nature of Work: Realace windows in single family residence; see attached for location and size.
Owner: Eileen Flynn Gatto Contractor: Groves and Co. - GROVECI120J8
GENERAL CONDITIONS APPLY -SEE LAST PAGE
RF,OUiRED INSPECTIONS
APPROVED/DATE
FRAMING/FINAL:
Windows -safety glazing where applicable per
attached details.
Window Ufactor - .40 or better
NFRC window sticker must 6e on
windows at iuspection time
Air Seal
FINAL
Smoke Detectors throughout; battery powered
Smoke Detectors adequate in existing
construction
House Numbers -min. 5" high
Final -Building
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 2
Permit NBLD05016
GENERAL CONDITIONS
I. Contractors working on this project are required to have a Labor & Industries contractor's
resistration number and a City business license. Fai-ure to provide proof of this documentation
prior to work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and
inspected prior to beginning construction; call 385-2294. Measures shall include installation of
silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way
shall be kept free of dirt debris. Soils exposed during construction shall be temporarily
stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding,
planfings, sodding, etc. once construcfion is complete. Applicant is responsible for protection of
adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall
panels (ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by
required inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspecfion ca11385-2294. A
minimum of twenty-four hours notice is required. Public Works approval must be received
prior to schedulin¢ the Buildin¢ Department's final inspection.
7. Final Inspections are required prior to occupancy; a Certificate of Occupancy is required for a
non-residential project.
8. All building permits expire if no progress has been made within six months, or if no inspections
are done by the Building Department within one year. Call for at least one inspection per year
to keep your building permit active.
9. Revisions require submittal & approval prior to making changes in the field. Contact the
Building Department @ 379-3208 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 2