Loading...
HomeMy WebLinkAboutBLD05-001Wafem~au & Katz I81 Qaiacy Street Suite 30l Port'IownsenQ WA 98368 Phone (360) 34A-3057 Fax (360) 385-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11 3 85-22 94 for Inspection Permit Number: BLDOS-OOI Issued: 01/14/05 Parcel Number: 967 200 006 Job Address: 1145 Blaine Street Zoning: RR=II Type: VV=N Nature of Work: Install stairs, rails and handrails to roof deck Owner: Nancy Winters Contractor: Queen Builders - OUEENB*984RR GENERAL CONDITIONS APPLY -SEE LAST PAGE RE UIRED INSPECTIONS APPROVED/DATE FRANHNG -per architect design Header @ kitchen FINAL -per architect design Stairs & Handrails All wood materials to be pressure treated or wood of natural resistance to decay. YVasher, hangers, Halls, haldowns and all other pertinent hardware and fasteners in contact with pressure treated wood shall be hot-dipped galvanized. Header Deck Door @ kitchen Post Base Posts Stair Treads - rise and run Blocking Positive Connections Landings Handrails - gripping surface - height Handrails to withstand 200# of horizontal force Smoke Detectors throughout existing structure as needed Building Address - 5" min. numbers to be visible from street Ca1148 hours before you dig utility line locates: 1-800-424-5555 Page ] of 2 Permit k HLDOS001 GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's reeistration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; call 385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294. A minimum of twenty-four hours notice is required. Public Works approval must be received prior to schedulin¢ the Building Department's final inspection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required For a non-residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal & approval prior to making changes in the field. Contact the Building Department @ 379-3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Call 48 hours before you dig utility line locates: 1-800-424-5555 Page 2 of 2 _opponT TO~rysmi CITY OF PORT TOWNSEND PUBLIC WORKS & -- -_ DEVELOPMENT SERVICES DEPARTMENT 9A' ._ U40 -e.~~/~ .~/ ~FWpSH~~ INSPECTION REPORT ~S- _ PERMIT NUMBER: r~ L- ~ L ~~i~ Address Contractor Owner Date of Inspection Worksite or Cell Phone# ^ Erosion/Sedimentation ^ Setbacks/Footings/LIFER ^ Foundation Walls ^ Slab Interior Footing/Insulation ^ Groundwork/PlumbingTest ^ Underfloor Framing ^ Shear Wall/Holdowns ~/ ^ Plumbing/Top Out ^ Gas Pipe/Pressure Test Propane Tank/Line U Mechanical,~,~LK~~ior Framing ' `1 uU r- ^ Insulation ~ Interior Shear/BWP Nail Drywall/Fire Wall ^ Gas/Wood Appliance ^ Manufactured Home Set-up ^ Public Works ^ Other/Consultation J FINAL If corrections required, re-inspection must be done prior to covering or concealing areas of construction. Additional fees may be assessed for multiple re-inspections. For Re-inspection, call Inspection Message Line at (360) 385-2294 prior to 8:00 AM. NO OCCUPANCY UNTIL FINALIZED BY BUILDING AND, IF APPLICABLE, PUBLIC WORKS. ^ VIOLATION ~',~~PROVAL ^ CORRECTION REQUIRED ^ APPROVED WITH CORRECTION ^ NEED APPROVED PLANS & PERMIT ON SITE Approved pl~n~ a~td permit card must be on-site and available at time of inspection. ~? Inspector ~ - ~- r-% -' a __ Date_ ,. ~`/~ _~ ~'~'~ S