HomeMy WebLinkAboutBLD04-124Watorman & Katz Building
181 Quincy Srcee4 Suite 301
Port Townsend, WA 98368
Phone: (360)379-320& Fax: (360)385-7675
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLDO4-124 Issued: 06/01/04
Job Address: 129 Tavlor Street Zoning: C-ID
Nature of Work: Retrofit of Fire/Life/Safety Items for Fire Department
Property Owner: BAM Corporation Business: Admiralty Apartments
Contractor: Fire One Inc. -License Number FIREOl*099KW
GENERAL CONDITIONS APPLY -SEE LAST PAGE
Parcel Number: 989 700 901
Type: VV=N
ELECTRICAL - a separate electrical permit is required for any electrical work. Contact Labor
and Industries at (360) 417-2700 if needed.
1 r;
FINAL -contact Tom Aumock, Port
Townsend Fire Department, @ 385-2626,
for inspection and approval
Retrofit/ Installation of new magnetic
mounted door holders for existing interior
fire doors, to include code required smoke
detectors (per NFPA)
Magnetic mount door holders tied into
existing fire alarm system
Final -Fire Deparhnent
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 2
GENERAL CONDITIONS
Permit N BLD04124
1. Contractors working on this project are required to have a Labor & Industries contractor's
registration number and a City business license. Failure to provide proof of this documentation
prior to work may result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and
inspected prior to beginning construction; ca11385-2294. Measures shall include installation of
silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way
shall be kept free of dirt debris. Soils exposed during construction shall be temporarily
stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding,
plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of
adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall
panels (ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by
required inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 385-2294. A
minimum of twenty-four hours notice is required. Public Works approval must be received
prior to scheduling the Building Department's final inspection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required for a
non-residential project.
8. All building permits expire if no progress has been made within six months, or if no inspections
are done by the Building Department within one year. Call for at least one inspection per year
to keep your building permit active.
9. Revisions require review and approval prior to making changes in the field. Contact the
Building Department at 379-5086 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 2