CITY OF PORT TOWNSEND -
AUTOMATIC FIRE SPRINKLER SYSTEM ~'~U` ~~
PERMIT & INSPECTION RECORD `~j~`,5 7U SEE
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE -~T`~1 /~ ~,o~~~
CALL 344-4607 (Tom Aumock) FOR INSPECTION r, / / t-('~~`-~ ~'
Permit Number: BLD04-105 Issued: 04/26/04. ~!v
Job Address: 232 Tavlor Street Zoning: C=III ~~ >°~ Z
Nature of Work: Install Automatic Fire Sprinkler System
Use of Building: Restaurant (lower floor only) Owner: Dan Veenstra / , ~, /~
I
Licensed Contractor: ~Vikin>? Automatic Sprinkler - VIKINAS373NT , ~
a~j0~
INSPECTIONS AND TESTS ~ ~-jl,
LOCATE(S) /~\0~'"i
Pass Fail N/A
^ ^ ^ Fire Department Connection (Storz) ~v.~,~„~5
^ ^ ^ Vault(s)
^ ^ ^ Post Indicator Valve
Inspector Date
SYSTEM TEST(Sl & INSPECTIONS
P_ass/Fail
^ N/A
^ /1 ~
Val
I
ll
i
Pi
i
B
i
~~'14,f't
lf~
^
^
~ ve
nsta
at
p
ng,
rac
ng,
ons ri1'
_
'" {~
k Fl
P
i
I
i
P
bli
W
k
D
B
epartment)
ow
revent
on
nspect
on (
u
c
or
s
ac
^ ^ Gds Drain and drip device between FDC and Check Valve
^
^ ^
^ ~
~ Approval for Cover (except @joints when prior to flow tests) ~-
H
d
t
ti
T
t
2 h
200
i
i
i
13
13R
St
ti
@ 13D)
~
-// y
ros
a
c
es
(
our,
ps
m
n
mum
,
;
a
c
(
^ ^ l~ .Pressurized Air Test (24-hour dry test to 40 psi)
^ ^ (IY/ Flush with sieve with De-Chlorination tablet (to sewer manhole only)
^ ^ GY Flow Test: Water Pressure Gauge Reading: psi static to
^ ^ C9'
Ffl ^ ^
Q/ ^ ^
See Next Pate
_ psi flow reading
Fire Alarm System Inter-tie with Sprinkler System Test _ seconds to
alarm initiation
Sprinkler Head installation ~~ ~°~
Piping, bracing, system insta lati n (~~Z1,~~~~,/~y~(
Page 1 of 2
~ ~~ F ~
,z° ~ ~ O H. WATER SUPPLY INFORMATION
Minimum supply provided.
Connection to water supply.
~~/ FDC and/or PIV ~ n s) are acceptable (within 50' of a public fire hydrant)
.~ PIV sectional location(s) aze a maximum of 5 devi es.
Hydrant Test Information Oo Plans: ~/f ®`~~57
Location and elevation of static and r idual pressure.
Flow location. from property to be protected.
Static pressure indicated on the plans.
GPM indicated on the plans. ,_.
Date and Time of testing is indicated on the plans.
Test conducted by/who supplied supply information indicated on plans.
This projectrequires super hydrants (6x2-2'/"xl-4").
New on-site pipe diameter(s) and piping materials per NFPA 24.
System use limited to 90 % of available water supply.
v
a~i ~ ou
cC 'y ^
a ° pC
2 ~ 3 O III. WATER SUPPLY UNDERGROUND DESIGN
Pipe material type and MFG ~ ~ provided.
d ~ ~ Valves data include model number and listing.
d Hydrant location(s) and/or pipe size and depth of bury indicated.
Thrust blocking.
n n
~
" d Supply NFPA notes on plan.
emu/
~ ~ Joining method used.
v
rx ~ c
c ~ o ~
z a: 3 O IV. OVERHEAD SYSTEM COMPONENTS
o o o d
o o a ~
0
t
~ ~ ~
oood
Pi in
Material and size -including wall thickness.
Hangers -including the listing and proper location.
Earthquake bracing -including materials, size, and proper location.
Dreinaee•
Main drain.
Inspectors test outlet (MRA).
Auxiliary drains in basements and pitched ceilings.
Washingron State Patrol Pire Protection Bureau Sprinkler Checklist Page 2 of 5
b
a
o
z cG 3 O IV. OVERHEAD SYSTEM COMPONENTS (continued)
ooo~
0
0
0 ~ ~ L~
~~
0 ~ 0
0 0
0
~0
0
0 0
0 0
0 0
Sorinklers:
Manufacturer specification sheet, model, and listing.
Number of sprinklers.
Temperature rating.
Proper spacing on each branch line.
Alarms provided.
Alarms monitored by a central station.
Construction Plans, etc.:
Complete construction details (foil height and cross section)
Room dimensions and label rooms use/purpose.
Building elevation.
Roof design (smooth ceiling, beams, girders, bar joists).
Hvdraulic Calculations:
Summary sheet of Hazard Classification(s)/Densi Refer to pa e'
[~ Detailed work sheets.
Hydraulic reference paints.
Graph sheet.
Abbreviations and symbols
Peaking of grid systems.
Most remote area (MRA).
Additions And/Or Remodels:
~i 0 0 0 Details of existing sprinkler system.
Calculations for additions to system.
o' ~
a '~ ~
o. o ,~'
2 w"' 3 O V. MAXIMUM SPACING FOR PIPE SUPPORTS
Threaded IightweighC steel of less than 3" diameter at no more than 12 feet.
a ~ ~ ~ Steel pipe of less than 1 %" diameter at no more than 12 feet.
~' Steel pipe more than 1 Yz" diameter at no more than 15 feet.
Copper tube of/d' to 1" at no more than 8 feet.
Copper tube of 1 ''/a" to I %" at no more than 10 feet.
Wuhington Stale Patrol Fire Protection Bureau Sprinkler Checklist Page 3 of 5
rx 'y a
c ° ~4'
z a 3 0
vi.
--~._
~O ~ C~
0 ~ 0
0
ooo~
0 0
0
0
0 ~ 0
0 ~ ~ 0
0
Seismic bracing calculation sheet.
Assigned load calculations shall be indicated on plans.
Longitudinal: 80' maximum for feed and cross mains.
Lateral:
40' maximum for feed and cross-mains.
Within 24" of every other with flex coupling on the mains.
If primary structural members exceed 40', then spaced up to 50'.
Last length of feed and cross-mains.
Required on branch lines 2 %" and larger.
May not be omitted on pipes with rods less than B'.
Longitudinal and lateral at top of risers (4 way).
v
~ ^' c
o ~ ° ~
z rs: 3 O VII. DESIGN CRITERIA FOR SPECIFIC HAZARD CLASSIFICATIONS
Hazard Classification:
Light Hazard
Quantity or combustibility of contents is low. Fires have a relatively
low heat release rate.
0 ~ Ordinarv Hazard, Groun 1
Combustibility of contents is low. Quantity of combustibles is
moderate. Stockpiles aze less than 8 feet in height. Pires have a
moderate heat release rate.
Ordinary Hazard, Groun 2
Combushibility of contents is moderate. Quantity of combustibles is
moderate. Stockpiles are less than ] 2 feet in height. Fires have a
moderate heat release rate.
OrdinarxHazard, Group 3
Quantity or combustibility is high. Fves have a high rate of heat
release. Storage is limited to 12 feet in height.
Extra Hazard. Groups I & 2
Quantity and combustibility is very high. Flammable liquids, dusts,
and/or other materials are present that result in rapidly developing
fires with high heat release rates.
0 0 ~ Undetermined
When buildings have an undetermined use, Ordinary Hazard, Group
3 design standazds are the minimum that are acceptable.
Washington State Patrol Pire Protection Bureau Sprinkler Checklist Page 4 of 5
-_~.. 4;,
~- z~- o~
,~ ,, , - ~'/ 0~1'I
~rl ~~
<< ,~ ~~~ CITY OF PORT TOWNSEND
` AUTOMATIC FIRE SPRINKLER SYSTEM ~`e U` `~~
PERMIT & INSPECTION RECORD `~j ~//,5 7~ SSE
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE ~T`,1 ~ ~,o~~~~
CALL 344-4607 (Tom Aumock) FOR INSPECTION ~` ~-/~~'-~'
Permit Number: BLD04-105 Issued: 04/26/04. S~
Job Address: 232 Tavlor Street Zoning: C~III ~>~.lf' ~~ y
Nature of Work: Install Automatic Fire Sprinkler Svstem
Use of Building: Restaurant (lower floor only Owner: Dan Veenstra
Licensed Contractor.Viking Automatic Sprinkler - VIKINA5373NT
INSPECTIONS AND TESTS
LOCATE(S)
Pass Fail N/A
^ ^ ^ Fire Department Connection (Storz) ~~~~,~5
^ ^ ^ Vault(s)
^ ^ ^ Post Indicator Valve
Inspector Date
SYSTEM TEST(S) & INSPECTIONS
P-ass/Fail N/A '" {~
lid ^ -^ / Piping, Bracing, Valve Installations GI'
^ ^ Ili Back Flow Prevention Inspection (Public Works Department)
^ ^ ~ Drain and drip device between FDC and Check Valve
^ ^ per/ Approval for Cover (except @ joints when prior to flow tests) ~_
^ ^ fH' Hydrostatic Test (2 hour, 200 psi minimum 13, 13R; Static @ 13D) (~
^ ^ _liar/ Pressurized Air Test (24-hour dry test to 40 psi)
^ ^ 4~ Flush with sieve with De-Chlorination tablet (to sewer manhole only)
^ ^ ~ Flow Test: Water Pressure Gauge Reading:_ psi static to
psi flow reading
^ ^ Fire Alarm System Inter-tie with Sprinkler System Test _ seconds to
alarm initiation ~/
^ ^ Sprinkler Head installation ~W`'~
C~/ ^ ^ Piping, bracing, system insta lati ~~i-
See Next Pate ~~~
Page 1 of 2