Loading...
HomeMy WebLinkAboutBLD04-108Waterman & Katz Building ]8] Quincy Street, Salle 30] Port Townsend, WA 98766 Phone: (360) 779$208 Fax: (360) 3667675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BI~D~4-1~g Job Address: 5505 Bell Street Issued: 05/07/04 Parcel Number: 984 901 106 & 989 901 104 Zoning: RR_I Type: V_N Occupancy: RR=3 Nature of Work: Remove existine cedar roofing on house; install sheetin¢, felt and composition shinLles. and arovide adequate ventilation. Owners: Helen Shaw and Patricia Henderson Contractor: Hone Roofin¢ - HOPER**043N7 NOTE: Roofing materials to be installed per manufacturer's specifications and UBC Chapter 15. GENERAL CONDITIONS APPLY -SEE LAST PAGE REQUIRED INSPECTIONS APPROVED/DATE DEMOLITION All construction debris to be deposited in Jefferson County Landfill or other location in accordance with all local, state and federal laws. SHEATHING Nailing requires Sd @ 6" o.c. edges & 12" o.c. field or 1 7/4" staples @ 6" o.c. edges and field. ROOF VENTING Ridge and Soffit Venting Net free ventilation area shall not be less than 1 square foot per 150 squaze feat of the area of the space ventilated, unless 50% of the required vent opening area is provided in the upper portion of the roof and therefore the rate may be reduced to 1 square foot of venting to 300 square Feet of area vented. Openings shall be covered with corrosion resistant''/o" mesh. ROOFING Install all roofing material Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 2 Permit NBLD04108 FINAL Smoke detectors required per 1997 UBC (battery powered OK) House Numbers - 5" numbers of contrasting color posted near main entrance of house and visible from street per City Ordinance Final -Building 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. If temporary erosion and sediment control (TESL) measures are required, they shall be installed on- site and inspected prior to beginning construction; ca11 385-2 2 94. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11385-2294. A minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the Building Department's final inspection. 7. Final Inspections are required prior to occupancy; a Certificate of Occupancy is required fora non- residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your buIlding permit active. 9. Revisions require submittal & approval prior to making changes in the field. Contact the Building Department @ 379-3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 2