Loading...
HomeMy WebLinkAboutBLD04-002Waterman & Katz Building 181 Quincy Street, Suite 301 Port Townsend, W A 98368 Phone: 360-379-3208 Fax 3W-385-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: BLDO4-OOZ Issued: 01/09/04 Parcel Number: 989 700 903 Job Address: 925 Water Street Zoning: C-III Construction Type: V_N Occupancy: A-3/R-1 Total Occupant Load: No Chance Use of Building: Belmont Restaurant/Hotel Nature of Work: Install new floor foists as needed, and plywood underlayment in kitchen area. Owners: Rick Unrue & Jeffrie Fraychineaud Contractor: Discovery Bay Construction - DISCOBC090B9 SEPARATE PERMITS REQUIRED: Electrical -Contact Labor and Industries @ 417-2702 GENERAL CONDITIONS APPLY -SEE LAST PAGE RE UIRED INSPECTIONS APPROVED/DATE DEMOLITION Materials shall be deposited in Jefferson County Landfill or other approved location in accordance with State and Local laws FLOOR FRAMING Sister 2 x 12 joists - 16' o.c. span OK to 16'3" i Hangers Positive Connection Underlayment Subfloor (if applicable) PLUMBING (if applicable) MECHANICAL (if applicable) Ca1148 hours before you dig for Utility line locates 1-800 424-5555 Page 1 of 2 Natemmn & Katz Bwlding 187 Quincy Sheet, Sui[e 301 Port Townsend, WA 98368 Phone: 360-379-3208 Fax 36P385-7675 FINAL Electrical (L & I) Health Department Sign-Off Building Numbers Final -Building GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries Contractor's Registration Number and a City Business License. Failure to provide proof of this documentation PRIOR to work may result in job shutdown while this is accomplished. 2. TESC -Temporary erosion and sediment control measures shall be installed on-site and inspected prior to beginning construction; ca11 385-2 2 94. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc., once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All engineered elements including sheathing, nailing, holdowns, ABWP's (alternate braced wall panels), etc., requires inspection PRIOR to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after Inspection Report corrections are completed. 6. The Building Department is unable to pass Final Inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294. A minimum of 24 hours notice is required. Public Works approval must be received prior to s_cheduline the Buildin¢ Department's Final Inspection or issuine a Temporary Certificate of Occupancy. 7. Final Inspection and Certificate of Occupancy (nonresidential only) required PRIOR to occupancy. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal & approval prior to making changes in the field. Contact the Building Department @ 379-3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Ca1148 hours before you dig for Utility line locates 1-800 424-5555 Page 2 of 2