HomeMy WebLinkAboutBLD04-020
•
•
Wateimav & Katz Building
18l Qvivcy SheeS SuiCC 301
Port Townsend, WA 98366
Phone: (360)379-3208 Fax: (360) 385-7675
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: BLDO4-O2O Issued: 01/27/04 Parcel Number: 001-023-001
Job Address: 516 "F" Street Zoning: R-II Type: VVN Occupancy: R-3
Nature of Work: Foundation repair and replacement of existin footings
under existing residence and Qorch.
Occupant Load: No Change
Owner: Jack Bilan Contractor: Goldenberg Construction - GOLDEC*075NC
GENERAL CONDITIONS APPLY -SEE LAST PAGE
REOU~RED iN~PF,('TiON~
A PPRnVFTI/11A TF.
TEMP EROSION & SEDIMENT CONTROL
See General Condition No. 2 -install on-site as needed during
construction to prevent sediment from leaving the site and to
eliminate tracking of soil onto the street
DEMOLITION
.411 construction debris shall be deposited in the .Iefferson
Coun Land all in accordance with all state and local laws
FOOTINGS
Setbacks -existing
Footings
Forms
Reinforcement
Interior footings -
FOUNDATION
2 x 6 pressure treated top and bottom plate
2 x 6 pressure treated studs at 16" o.c.
5/8" x 10"Anchor Bolts w/ 2" x 2" x 3/16" square washers
5 Vents
Crawl space access
Positive Connections
Treated Wood to Concrete
Shield under Posts
6 mil black of
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 2
~i
FINAL
House Number -check for 5" numbers
Smoke Detectors throughout existing house per 1997
UBC
Final -building
GENERAL CONDITIONS
Pemtit k BI.D0402C
1. Contractors working on this project are required to have a Labor & Industries contractor's registration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior
to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled
construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils
exposed during construction shall be temporarily stabilized with mulching, plastic sheeting.,~,GE Soils
shall be permanently stabilized with seeding, plantings, sodding, etc. once construction incomplete.
Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass £nal inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection ca11385-2294. A
minimum of twenty-four hours notice is repaired Public Works approval must be received rior to
scheduling the Banding Department's Final inspection
7. Final Inspections are required prior to occupancy; a CertiTcate of Occupancy is required fora non-
residential project.
8. All building permits expire if no progress has been made within six months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal and approval prior to making changes in the f eld. Obtain revisions from the
Building Department (379-3208) prior to malting changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 2
~~
•
Waterman&Kafz BWldiog
181 Qofocy Street, Suite 301
Port Towaeend, WA 98368
Phone: (360)379-3208 Faz: (360)385-7675
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: BLD04-020R-1 Issued: 02/06/04 Parcel Number: 001-023-001
Job Address: 516 "F" Street Zoning: RR_II Type: VV=N Occupancy: R_3
Nature of Work: Revision #l:install new porch
Owner: Jack Bilau Contractor: Goldenbere Construction-GOLDEC*075NC
NOTE: Roofing materials to be installed per manufacturer's specifications and UBC Chapter 15.
GENERAL CONDITIONS APPLY -SEE LAST PAGE
RF.nTiTRFT) TNCPF.CTTnNC
•
s vnunv>G'nm ~ m~
DEMOLITION
All construction debris to be deposited in Jefferson
County Landfill or other location in accordance with
all local, state and federal laws.
PIERS
Setbacks
Rebar
FRAMING
FINAL
Ca1148 hours before you dig for utility line locates
1-800.424-5555
Page 1 of 2
Pemdt #BLD04-0208-1 ;~ 4
ENERAL CONDITION
1. Contractors working on this project are required to have a Labor & Industries contractor's
reeistration number and a City business license. Failure to provide proof of this documentation prior
to work may result in job shut down while this is accomplished.
2. If temporary erosion and sediment control (TESC) measures are required, they shall be installed on-
site and inspected prior to beginning construction; call 385-2294. Measures shall include installation
of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of-way shall
be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with
mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding,
etc. once construMion is complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by
required inspections.
5. Re-inspection is required after inspection report corrections are completed.
u
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection Cali 385-2294. A
minimum of twenty-four hours notice is reauved Public Works approval must be received prior to •
schedulin¢ the Buildine Department's final inspection
7. Final Inspections are required prior to occupancy; a Certificate of Occupancy is required fora non-
residential project.
8. All building permits expire if no progress has been made within six months, or if no inspections are
done by the Building Department within one year. Call for at least one inspection per year to keep
your building permit active.
9. Revisions require submittal & approval prior to making changes in the field. ContaM the Building
Department @ 379-3208 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH TFIE APPROVED PLANS.
Ca1148 hours before you dig for utility line locates •
I-800-424-5555
Page 2 of 2