Permit Number: BLDO4-OSH Issued: 02/27/04 Parcel Number: 968 100 801
~~y~
Job Address: McNeil Street Zoning: RR=II Type: VV_N Occupancy: R_3
Nature of Work: Remove existing cedar roofing on house; install sheeting, felt and composition
shingles, and provide adequate ventilation.
Owners: Jokari LLC (Rick Nelson) managed by John L. Scott Property Management
Contractor: Hope Roofing-HOPER*043N7
NOTE: Roofing materials to be installed per manufacturer's specifications and U$C Chapter 15.
GENERAL CONDITIONS APPLY -SEE LAST PAGE
RF.OTTTRF.D INSPECTIONS APPROVED/DATE
DEMOLITION
All construction debris to be deposited in Jefferson
County Landfill or other location in accordance with
all local, state and federal laws.
SHEATHING
Nailing requires 8d @ 6" o.c. edges & 12" o.c. field or
1 3/4" staples @ 6" o.c. edges and field.
ROOF VENTING
Ridge and Soffit Venting
Net free ventilation area shall not be less than 1 square
foot per 150 square feet of the area of the space
ventilated, unless 50% of the required vent opening
area is provided in the upper portion of the roof and
therefore the rate may be reduced to 1 squaze foot of
venting to 300 square feet of area vented. Openings
shall be covered with corrosion resistant'/<" mesh. ~
ROOFING
Install all roofing material
Call 48 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 2
Pemtit #BLD04-058
FINAL
Smoke detectors required per 1997 UBC (battery
powered OK)
House Numbers - 5" numbers of contrasting color
posted near main entrance of house and visible from
street per City Ordinance
Final -Building
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's
registration number and a City business license. Failure to provide proof of this documentation prior
to work may result in job shut down while this is accomplished.
2. If temporary erosion and sediment control (TESC) measures are required, they shall be installed on-
site and inspected prior to beginning construction; ca11385-2294. Measures shall include installation
of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of-way shall
be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with
mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding,
etc. once construction is complete. Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by
required inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass Snal inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection ca11 3 85-2 294. A
minimum of twenty-four hours notice is reauired. Public Works anaroval must be received prior to
scheduling the Building Deoartment's final inspection.
7. Final Inspections are required prior to occupancy; a Certificate of Occupancy is required fora non-
residential project.
8. All building permits expire if no progress has been made within six months, or if no inspections are
done by the Building Department within one year. Call for at least one inspection per year to keep
your building permit active.
9. Revisions require submittal & approval prior to making changes in the field. Contact the Building
Department @ 379-3208 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Ca1148 hours before you dig for utility line locates
1-800-424-5555