HomeMy WebLinkAboutBLD04-070W atermau & Ka¢ Building
181 Quincy Street, Still 301
Pott Tawosend, WA 98368
Phone: (360)379-3208 Fu: (360)385-7675
CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Call 385-2294 for Inspection
Permit Number: $I,D04-O70 Issued: 03/10/04 Parcel Number: 957-312-703
Job Address: 631 Cass Street Zoning: RR=II Type: VV=N
Nature of Work: R~lace eleven windows with same size windows.
Owners: James & Marv Minish Contractor: Groves & Co. - GROVECI120J8
GENERAL CONDITIONS APPLY -SEE LAST PAGE
RF(ITTTRFTI TNCPF("TTf1NC
APPR(1VF,n/n ATF,
Occupancy: RR=3
FRAMING/FINAL:
Windows -safety glazing where applicable per
attached details.
Window Ufactor - .40 or better
NFRC window sticker must be on
windows at inspection time
Air Seal
FINAL
House Numbers -min. 5" high ~
Final -Building I
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 1 of 2
Permit H BLD04070
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's registration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior
to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled
constraction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils
exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils
shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete.
Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection ca11385-2294. A
minimum of twenty-Four hours notice is required. Public Works approval must be received prior to
schedaling the Building Department's final inspection.
7. Final Inspections are required prior to occupancy; a Certificate of Occupancy is required fora non-
residential project.
8. All building permits expire if no progress has been made within six months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal & approval prior to making changes in the field. Contact the Building
Department @ 379-3208 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Ca1148 hours before you dig for utility line locates
1-800-424-5555
Page 2 of 2