Loading...
HomeMy WebLinkAboutBLD04-313Waterman & Katz Building IBI Quincy Street, Suite 301 Port Townsend, WA 98368 Phone: (360) 379-31A8 Fax: (360) 385-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: $LDO4-313 Issued: 11/30/04 Parcel Number: 988 802 307 Job Address: 1106 Taylor Street Zoning: RR=II Type: VV_N Occupancy: RR=3 Nature of Work: Remove existing cedar roofing on house; install sheeting, felt and composition shingles, and urovide adequate ventilation. Owner: Robin Bergstrom Contractor: Affordable Services - AFFORS*06503 NOTE: Roofing materials to be installed per manufacturer's specifications and IRC Chapter 9. GENERAL CONDITIONS APPLY -SEE LAST PAGE RFOTTTRRiI TNSPF.CTTONS APPROVED/DATE DEMOLITION All construction debris to be deposited in Jefferson County Landfill or other location in accordance with all local, state-and federal laws. SHEATHING Nailing requires 8d @ 6" o.c. edges & 12" o.c. field or 1 '/o" staples @ 6" o.c. edges and field. ROOF VENTING Attic Venting Net free ventilation area shall not be less than 1 square foot per 150 square feet of the area of the space ventilated, unless 50% of the required vent opening area is provided in the upper portion of the roof and therefore the rate may be reduced to 1 squaze foot of venting to 300 square feet of area vented. Openings shall be covered with corrosion resistant '/<" mesh. ROOFING Install all roofing material Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 2 Permit kHLDOA-373 FINAL Smoke detectors required per 2003 IRC Section 8313 House Numbers - 5" numbers of contrasting color posted near main entrance of house and visible from street per City Ordinance Final -Building ENERAL CONDITION I. Contractors working on this project are required to have a Labor & Industries contractor's reeistration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. If temporary erasion and sediment control (TESC) measures are required, they shall 6e installed on- site and inspected prior to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294. A minimum of twenty-four hours notice is required. Public Works approval must be received prior to schedulin the Buildin De artment's final ins ection. 7. Final Inspections are required prior to occupancy; a Certificate of Occupancy is required fora non- residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal & approval prior to making changes in the field. Contact the Building Department @ 379-3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 2