Loading...
HomeMy WebLinkAboutBLD04-306Waterman & Kaa Building 181 Quincy Street, Suite 301 Port Townsend, WA 98368 Phone: (360) 3793208 Fax: (360) 385-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BLD04-306 Issued: 11/17/04 Parcel Number: 988 801 804 Job Address: 928 Monroe Street Zoning: RR_II Type: VV_N Occupancy: RR=3 Nature of Work: Remove existing cedar roofing on houreā€¢ install sheeting. felt and composition shingles, and provide adequate ventilation. Owner: Colin Foden Contractor: Hope Roofing - HOPER*043N7 NOTE: Roofing materials to be installed per manufacturer's specifications and IRC Chapter 9. GENERAL CONDITIONS APPLY -SEE LAST PAGE RE UIRED INSPECTIONS APPROVED/DATE DEMOLITION All construction debris to be deposited in Jefferson County Landfill or other location in accordance with all local, state and federal laws. SHEATHING Nailing requires 8d @ 6" o.c. edges & 12" o.c. field or 1 '/<" staples @ 6" o.c. edges and field. ROOF VENTING Attic Venting Net free ventilation area shall not be less than 1 square foot per 150 square feet of the area of the space ventilated, unless 50% of the required vent opening area is provided in the upper portion of the roof and therefore the rate may be reduced to 1 square foot of venting to 300 square feet of area vented. Openings shall be covered with corrosion resistant ''/d' mesh. ROOFING Install all roofing material Ca1148 hours before you dig far utility line locates 1-800-424-5555 Page 1 of 2 Permit gBLD04306 FINAL Smoke detectors required per 2003 IRC Section R313 House Numbers - 5" numbers of contrasting color posted neaz main entrance of house and visible from street per City Ordinance Final - Builditg GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's reeistration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. If temporary erosion and sediment control (TESC) measures are required, they shall be installed on- site and inspected prior to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection ca11 3 85-22 94. A minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduline the Building Denartment's final insuection. 7. Final Inspections are required prior to occupancy; a Certificate of Occupancy is required fora non- residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal & approval prior to making changes in the field. Contact the Building Department @ 379-3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 2