Loading...
HomeMy WebLinkAboutBLD04-302Watrnnan & Katz Building 181 Quincy Street, Suita 301 Port Townsend, WA 98368 Phove: (360) 37&3208 Fex: (360) 379fi923 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Call 385-2294 for Inspection Permit Number: BLDO4-3O2 Issued: 03/30/05 Parcel Number: 984-904-407 Job Address: 788 P Street Zoning: RR=II Type: VV=N Occupancy: R-3 Nature of Work: Build deck and detached gazebo Owners: Jim Ferris & Auman Van Sandt Contractor: Same as Owner 385-9599 GENERAL CONDITIONS APPLY -SEE LAST PAGE SEPARATE PERMITS REQUIRED: May Need Electrical Permit -Contact Labor & Industries for Information @ 360.417-2702 REQUIRED INSPECTIONS APPROVED/DATE TEMPORARY EROSION & SEDIMENT CONTROL See General Condition No. 2 FOOTINGS Setbacks Engineered footings Forms Reinforcement GAZEBO FRAMING -per engineering DECK All framing members to be pressure treated or wood ofnaturalresistance to decay Fasteners hanzers etc. in contact with treated material must be hot dipped galvanized See attached sheets Call 48 hours before you dig for utility -ine locates I-800-424-5555 Page 1 of 1 Pertnii a BLDOL302 IN SYL FINAL Upon completion of the Timbercraft portion of the work, the engineer of record to submit original signed letter that work was completed according to his specifications. House Numbers posted (minimum 5") Guardrails Handrails Stairs Smoke Detectors Deck -Final GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's registration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294. A minimum of twenty-four hours notice is required. Public Works approval must 6e received prior to scheduling the Building Deuartment's final inspection. 7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non- residential project. 8. All building permits eapire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal & approval prior to making changes in the field. Contact the Building Department @ 379-3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-STTE WITH THE APPROVED PLANS. Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 2 ~ ~~ ~ ~,~,~'~ ,i~,, n1^ i/~ ' . ~~r °`P°arr°whsF CITY OF PORT TOWNSEND PUBLIC WORKS & `' -_-~° DEVELOPMENT SERVICES DEPARTMENT 9) ? " - °AO FOFWASN~~ INSPECTION REPOfR~T PERMIT NUMBER: ~ ~""'~ ~ ~ ^ ~~~ Address Contractor Owner ~~ '~ S~ Date of Inspection ~ i Worksite or Cell Phone# S~~ ~t ~`l ~S ~~- ~'~ / k L~?a~(uJi:r ~~ Erosion/Sedimentation ^ Plumbing/Top Out ^ Drywall/Fire Wall Setbacks/Footings/LIFER ^ Gas Pipe/Pressure Test ^ Gas/Wood Appliance Foundation Walls ^ Propane Tank/Line ^ Manufactured Home Set-up J Slab Interior Footing/Insulation J Mechanical ^ Public Works ^ Groundwork/Plumbing Test ~ Framing ^ Other/Consultation ^ Underfloor Framing ^ Shear Wall/Holdowns Insulation ~ Interior Shear/BWP Nail ^ FINAL V^>1 I--~'r G % ~ r ~~~, ,~_ If corrections required, re-inspection must be done prior to covering or concealing areas of construction. Additional fees may be assessed for multiple re-inspections. For Re-inspection, call Inspection Message 'eat (360) 385-2294 prior to 8:00 AM. NO OCCUPANCY UNTIL FINALIZED BY LDING AND, IF APPLICABLE, PUBLIC WORKS. ^ VIOLATION APPROVAL ^ CORRECTION REQUIRED ^ APPROVED WITH CORRECTION .] NEED APPROVED PLANS & PERMIT ON SITE Approved Inspector it r be on-site and available at time of inspectio . Date ~ ® p