CITY OF PORT TOWNSEND
CONSTRUCTION PERMIT & INSPECTION RECORD
THIS CARD MUST BE POSTED AT CONSTRUCTION SITE
Ca11385-2294 for Inspection
Permit Number: BLDO4-27rJ Issued: 10/22/04 Parcel Number: 984 904 104
Job Address: 735 P Street Zoning: RR=II Type: VV=N Occupancy: R-3
Total Occupant Load: No Chance Nature of Work: Construct 234 sa. ft. deck addition.
Owners: Howard & Jeanette Richoux Contractor: L.D. Richert LDRICC*066L0
GENERAL CONDITIONS APPLY -SEE LAST PAGE
REQUIRED INSPECTIONS
APPROVED/DATE
FOOTINGS
Setbacks
Deck Pier Footings
Reinforcement
FLOOR FRAD~ING/DECK
All framing members to be pressure treated or woad of
naturalresistanceto decay
Fasteners hangers etc. in contact with treated
material must be hot dipped galvanized
Posts
Beam
Joists
Positive Connection
Post-to-Pier
Post-to-Beam
Treated Wood to Concrete
Lag Bolts @ ledger
Blocking
FINAL
House Numbers posted (minimum 5")
Guardrails
Handrails
Stairs
Smoke Detectors
Deck -Final
Call 48 hours before you dig utility line locals: 1-800-424-5555
Page 1 of 1
Permit ro 13LDOi-275
GENERAL CONDITIONS
1. Contractors working on this project are required to have a Labor & Industries contractor's registration
number and a City business license. Failure to provide proof of this documentation prior to work may
result in job shut down while this is accomplished.
2. Temporary erosion and sediment control (TESC) measures shall be installed on-site and inspected prior
to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled
construction entrance (see attached details). Adjacent rights-of-way shall be kept free of dirt debris. Soils
exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils
shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete.
Applicant is responsible for protection of adjacent properties.
3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels
(ABWP) require inspection prior to cover.
4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required
inspections.
5. Re-inspection is required after inspection report corrections are completed.
6. The Building Department is unable to pass final inspection on your project until Public Works
requirements have been completed and inspected. For Public Works inspection call 385-2294. A
minimum of twenty-four hours notice is required. Public Works approval must be received prior to
scheduline the BuildinH Deaartment's final inspection.
7. Final Inspections are required prior to occupancy; A Certificate of Occupancy is required fora non-
residential project.
8. All building permits expire if no progress has been made within six months, or if no inspections are done
by the Building Department within one year. Call for at least one inspection per year to keep your
building permit active.
9. Revisions require submittal & approval prior to making changes in the field. Contact the Building
Department @ 379-3208 prior to making changes to the approved plans.
10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS.
Call 48 hours before you dig utility line locates: 1-800-424-5555
Page 2 of 2