Loading...
HomeMy WebLinkAboutBLD04-215Waterman & Kah Building 181 Quincy Street, Suite 30I Port Townsend, K'A 9&i69 Phone: (360) 3793208 Fax: (360) 385-7675 CITY OF PORT TOWNSEND CONSTRUCTION PERMIT & INSPECTION RECORD THIS CARD MUST BE POSTED AT CONSTRUCTION SITE Ca11385-2294 for Inspection Permit Number: $LDO4-2I5 Issued: 07/29/04 Parcel Number: 948 300 403 Job Address: 1926 Haines Street Zoning: RR=II Type: VV=N Occupancy: RR=3 Nature of Work: Remove existing cedar and composition roofin~on house; install sheeting, felt and composition shingles, and provide adequate ventilation. Add rafter tails for additional overhang on east and west sides; brace sagging 2 x 4 rafters in two areas on north and center of the roof; remove interior metal chimney and wood stove. Owner: Edward Edwards Contractor: Owner NOTE: Roofing materials to be installed per manufacturer's speciScations and UBC Chapter 15. GENERAL CONDITIONS APPLY -SEE LAST PAGE NOTE: Repair/replacement of roof structural members (e.g., roof rafters, joists, truss system, etc.) requires revision to this permit REQUIRED INSPECTIONS APPROVED/DATE DEMOLITION All construction debris to be deposited in Jefferson County Landfill or other location in accordance with all local, state and federal laws. FRAMING Purlins Hurricane Ties each rafter SHEATHING Nailing requires 8d @ 6" o.c. edges & 12" o.c. field or 1 3/<" staples @ 6" o.c. edges and field. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 1 of 2 Permit kBLD042I5 RF.niJiRF,D INSPF,CT~ONS APPROVED/DATE ROOF VENTING Gable and Soffit Venting Net free ventilation azea shall not be less than 1 square foot per 150 square feet of the area of the space ventilated, unless 50% of the required vent opening area is provided in the upper portion of the roof and therefore the rate may be reduced to 1 square foot of venting to 300 squaze feet of area vented. Openings shall be covered with corrosion resistant '/4" mesh. ROOFING Install all roofing material FINAL Smoke detectors required per 1997 UBC (battery powered OK) House Numbers - 5" numbers of contrasting color posted near main entrance of house and visible from street per City Ordinance Final -Building GENERAL CONDITIONS 1. Contractors working on this project are required to have a Labor & Industries contractor's reeistration number and a City business license. Failure to provide proof of this documentation prior to work may result in job shut down while this is accomplished. 2. If temporary erosion and sediment control (TESC) measures are required, they shall be installed on-site and inspected prior to beginning construction; ca11385-2294. Measures shall include installation of silt fencing and graveled construction entrance (see attached details). Adjacent rights-of--way shall be kept free of dirt debris. Soils exposed during construction shall be temporarily stabilized with mulching, plastic sheeting, etc. Soils shall be permanently stabilized with seeding, plantings, sodding, etc. once construction is complete. Applicant is responsible for protection of adjacent properties. 3. All elements of engineering including nailing, holdowns, sheathing, and alternate braced wall panels (ABWP) require inspection prior to cover. 4. Owner or owner's agent shall review and oversee correction of any and all deficiencies noted by required inspections. Call 48 hours before you dig for utility line locates 1-800-424-5555 Page 2 of 2 Pertnil uSLD04-215 5. Re-inspection is required after inspection report corrections are completed. 6. The Building Department is unable to pass final inspection on your project until Public Works requirements have been completed and inspected. For Public Works inspection call 385-2294.. A minimum of twenty-four hours notice is required. Public Works approval must be received prior to scheduling the Building Department's final inspection. 7. Final Inspections are required prior to occupancy; a Certificate of Occupancy is required for a non-residential project. 8. All building permits expire if no progress has been made within six months, or if no inspections are done by the Building Department within one year. Call for at least one inspection per year to keep your building permit active. 9. Revisions require submittal & approval prior to making changes in the field. Contact the Building Department @ 379-3208 prior to making changes to the approved plans. 10. POST THIS PERMIT ON-SITE WITH THE APPROVED PLANS. Ca1148 hours before you dig for utility line locates 1-800-424-5555 Page 3 of 2 °~`°p'T°""~s,~ CITY OF PORT TOWNSEND PUBLIC WORKS - BUILDING AND COMMUNITY DEVELOPMENT q _ :_ _ °~O FOAWASN~~ INSPECTION REPORT PERMIT NUMBER: Address Contractor Owner Date of Inspection ~) Worksite or Cell Phone# ^ Erosion/Sedimentation ^ Setbacks/Footings/LIFER ^ Foundation Walls ^ Slab Interior Footing/Insulation ^ Groundwork/Plumbing Test ^ Underfloor Framing ^ Shear Wall/Holdowns ^ Plumbing/Top Out ^ Drywall/Fire Wall ^ Gas Pipe/Pressure Test ^ Gas/Wood Appliance ^ Propane Tank/Line ^ Manufactured Home Set-up ^ Mechanical ^ Public Works Framing ^ Other/Consultation Insulation ^ Interior Shear/BWP Nail ^ FINAL If corrections required, re-inspection must be done prior to covering or concealing areas of construction. Additional fees may be assessed for multiple re-inspections. For Re-inspection, call Inspection Message Line at (360) 385-2294 prior to 8:00 AM. NO OCCUPANCY UNTIL FINALIZED Y BUILDING AND, IF APPLICABLE, PUBLIC WORKS. ^ VIOLATION APPROVAL ^ CORRECTION REQUIRED ~; .,, ~ef~~, ~ Approved plans and permit card must be on-site and available at time of inspection. t ~'" ; . r-- ~ - , Inspector >~- ___ ______ Date_~ '~. 13L Doi -~Z- ts~ l ~I ZC~ l~~ h.e-~ ~~~. C'